Analysis Of Transformer Reliability And Loading At The New Cirata 150kv Substation Muhammad Daud Rizky Siregar; Dino Erivianto; Rahmaniar Rahmaniar
Jurnal Media Computer Science Vol 5 No 2 (2026): April
Publisher : LPPJPHKI Universitas Dehasen Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37676/jmcs.v5i2.11241

Abstract

Transformers are critical components in power transmission systems that require regular reliability monitoring and load analysis to ensure optimal operation. This study analyzes the reliability and load characteristics of a 60 MVA power transformer at the Cirata Baru 150kV substation using operational data from July 2025. The research methodology used a quantitative approach with SCADA data analysis and graphical visualization. The analysis results show that the transformer operated with an average load of 19.75 MVA (32.91% loading) and a peak load of 20.40 MVA (34% loading) which occurred on July 17, 2025, at 19:00 WIB. The average power factor reached 96.52%, indicating excellent system efficiency. The average operating current was recorded at 551.77 A with a stable operating voltage of 20.49 kV. The transformer's capacity margin of 39.60 MVA (66%) provides ample room for future load growth. Load growth projections assuming 5% per year indicate that the transformer has sufficient capacity to serve needs for at least the next 15 years. Operational conditions well below nominal capacity provide high reliability and a long economic life.
Analyzed the Failure of the Operation of the Circulating Water Pump in Unit 2 PLTU Pangkalan Susu Power Plant Debby Keumala Sari; Hamdani; Rahmaniar
Journal of Electrical Engineering Vol. 4 No. 01 (2026): Elimensi : Journal of Electrical Engineering
Publisher : Cattleya Darmaya Fortuna

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54209/elimensi.v4i01.637

Abstract

Electric power is used to support daily life, therefore electrical energy must be continues to grow given the growing need for this energy. So need to be preventive, corrective maintenance and optimization efforts generating units such as savings in the production process, one of which is with analyzed the failure of the operation of the Circulating Water Pump in Unit 2 PLTU Pangkalan Susu Power Plant. The formulation of the problem in this study is that the CWP 2A short circuit and the CWP 2A Vacuum Circuit Breaker failed trips, therefore it is necessary to analyze the CWP motor and the CWP 2A VCB Panel breaker, existing data, then a Failure Defense Task (FDT) recommendation is generated to prevent repeated failures.
Analisis Evaluasi Kinerja Motor Listrik Menggunakan Parameter Temperatur Dan Getaran Sebagai Indikator Kerusakan Pada Mesin Separator Di PKS Rodho Evan Riwanda Lumban raja; Rahmaniar; Dino Erivianto
Jurnal Nasional Teknologi Komputer Vol 6 No 4 (2026): Oktober 2026
Publisher : CV. Hawari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61306/jnastek.v6i4.560

Abstract

Electric motors are critical components of separator machines in palm oil mills; operating continuously at high speeds, they are susceptible to performance degradation caused by overheating, imbalance, misalignment, or bearing failure. Motor failure can lead to production stoppages, increased maintenance costs, and reduced operational efficiency. This study aims to evaluate the performance of electric motors in separator machines using temperature and vibration parameters as primary indicators for the early detection of faults. A condition-based monitoring approach was employed, involving temperature measurements via infrared thermal cameras and vibration measurements using a vibration analyzer at specific monitoring points on the motor during normal operation. The collected data were analyzed descriptively and compared against standard machine condition limits based on vibration severity classifications and motor operating temperature characteristics. The analysis revealed that an increase in motor temperature was consistently accompanied by a rise in vibration amplitude, indicating a correlation between thermal load and mechanical condition degradation. Vibration patterns dominant at the rotational frequency indicated early signs of rotor imbalance and bearing wear, while temperature increases pointed to reduced cooling system effectiveness and higher electrical losses. The condition evaluation demonstrated that temperature and vibration parameters could detect changes in motor performance prior to functional failure. Consequently, integrating these parameters can serve as a basis for implementing predictive maintenance to enhance electric motor reliability, minimize downtime, and optimize separator machine productivity in palm oil mills. These findings support the implementation of condition-based maintenance for critical equipment in the palm oil processing industry.
Analisis Pengaruh Beban Peralatan Bengkel Terhadap Intensitas Konsumsi Energi (IKE) Di PT.Buana Jaya Lestari Taufik Refyandra; Rahmaniar; Parlin Hambali
Jurnal Nasional Teknologi Komputer Vol 5 No 3 (2025): Juli 2025
Publisher : CV. Hawari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61306/jnastek.v5i3.234

Abstract

This study analyzes the Energy Consumption Intensity (ECI) at the multi-story motorcycle workshop of PT. Buana Jaya Lestari in Medan to identify energy consumption characteristics and optimization potential. The research method used energy audits, direct measurements, and historical energy consumption data analysis over a 12-month period. The research object is a multi-story workshop with a total area of 1,850 m² distributed across three floors with different functions. The results of the study show a total ECI of 100.67 kWh/m²/year, which meets the national standard for commercial buildings with partial air conditioning. Energy consumption distribution per floor varies significantly: floor 1 (138.09 kWh/m²/year), floor 2 (99.84 kWh/m²/year), and floor 3 (48.00 kWh/m²/year). The air conditioning system dominates energy consumption with a contribution of 42.1%, followed by the lighting system (23.9%), workshop equipment (20.0%), and support systems (14.0%). The most influential factors are external ambient temperature (correlation 0.85) and the number of vehicles served (correlation 0.78). Energy savings potential reaches 13.4% or 24,878 kWh/year through optimization of the air conditioning system and retrofitting of the lighting system. Implementing energy conservation strategies can result in financial savings of Rp 37,317,000/year, a reduction in CO₂ emissions of 17.41 tons CO₂eq/year, and a decrease in the Energy Performance Index (EPI) to 87.25 kWh/m²/year.
ANALISIS PENGUJIAN KAPASITAS BATERAI 220 VDC UNTUK KEANDALAN PLTGU UNIT PEMBANGKITAN (UP) BELAWAN Wahyu Desmandra; Dino Erivianto; Rahmaniar
Jurnal Nasional Teknologi Komputer Vol 5 No 3 (2025): Juli 2025
Publisher : CV. Hawari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61306/jnastek.v5i3.248

Abstract

This study aims to analyze the capacity of a 220 VDC battery used in the acoustic system of the Gas and Steam Power Plant (PLTGU) at the Belawan Generating Unit (UP). Batteries have an important role as a backup energy source in maintaining the continuity of the electrical operational system, especially in emergency conditions. The research method includes testing the battery capacity by measuring current, voltage, and discharge time under various load conditions. The test results show that battery capacity can vary depending on temperature, age, and previous charging conditions. The data obtained are explained to rotate the battery performance in supporting the PLTGU system. This conclusion provides recommendations for routine maintenance and battery replacement, to ensure the electrical system at the Belawan UP continues to function optimally. This research is expected to be a reference for PLTGU managers in improving the efficiency of the power plant system.
ANALISIS AUDIT ENERGI LISTRIK DAN INTENSITAS KONSUMSI ENERGI PADA GEDUNG KANTOR PLN UP3 BANGKINANG Rinaldo Mirza H Sitorus; M. Erpandi Dalimunthe; Rahmaniar
Jurnal Nasional Teknologi Komputer Vol 6 No 2 (2026): April 2026
Publisher : CV. Hawari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61306/jnastek.v6i2.398

Abstract

This study aims to analyze the electrical energy performance of the PLN UP3 Bangkinang Office Building through a partial energy audit and to determine the Energy Use Intensity (EUI) as an indicator of energy efficiency. The methodology includes collecting historical electricity consumption data for 2024–2025, inventorying lighting and air conditioning systems, measuring illumination levels (lux) and indoor temperature, and evaluating compliance with SNI 6196:2011, SNI 6197:2020, and Minister of Energy and Mineral Resources Regulation No. 3 of 2025. The results indicate that the EUI value of the PLN UP3 Bangkinang Office Building was 39.33 kWh/m²/year in 2024 and 40.28 kWh/m²/year in 2025, with an average of 39.81 kWh/m²/year. These values are below the benchmark of EUI < 70 kWh/m²/year, categorizing the building as highly efficient. The lighting system analysis shows that most rooms comply with the maximum lighting power density (W/m²) standard, except for the Cendana Meeting Room, which exceeds the limit. In terms of illumination level, several rooms do not meet the minimum lux standard and require optimization without significantly increasing power consumption. Meanwhile, the air conditioning system operates within a comfortable temperature range and is in good condition, contributing to stable overall energy consumption. Overall, the PLN UP3 Bangkinang Office Building demonstrates highly efficient energy performance, with opportunities for improvement in lighting distribution optimization and sustainable energy management practices to maintain a balance between energy efficiency and occupant comfort.
ANALISA PERBANDINGAN AUXILIARY POWER UNIT DAN GROUND POWER UNIT TERHADAP PESAWAT A320-SERIES KETIKA AIRCRAFT ON GROUND M. Endarto Dimas Hadi D; Haris Gunawan; Rahmaniar
Jurnal Nasional Teknologi Komputer Vol 6 No 4 (2026): Oktober 2026
Publisher : CV. Hawari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61306/jnastek.v6i4.576

Abstract

This study analyzes and compares the performance of the Auxiliary Power Unit (APU) and Ground Power Unit (GPU) and evaluates their effects on the Airbus A320 electrical system during ground operation. The comparison is based on technical parameters, including power, voltage, current, and frequency, as well as operational factors affecting the reliability and efficiency of electrical power supply. The research employed field observations, document review, interviews, and data analysis. The collected data were analyzed using mathematical calculations to evaluate the capability of the APU and GPU in supplying the aircraft's electrical load. The results show that the APU provides greater operational flexibility because i t supplies both electrical power and bleed air for engine starting and air conditioning, whereas the GPU functions only as an external electrical power source. The Airbus A320 requires approximately 25.3–32.8 kW during ground operation, and both the 72 kW TLD 90 kVA GPU and Honeywell 131-9A APU can adequately meet this demand with sufficient power reserve. Therefore, the choice between the APU and GPU is mainly determined by operational factors such as fuel consumption, operating costs, emissions, and noise rather than electrical power capacity.
Strengthening Electrical Safety Awareness and Introducing Energy Harvesting to Vocational Students through Indonesia–Malaysia Collaboration Rahmaniar Rahmaniar; Mohd Ambri Mohamed; Reza Juliangga; Haris Gunawan; Ardi Surbakti
Proceedings of The International Conference on Computer Science, Engineering, Social Science, and Multi-Disciplinary Studies Vol. 2 (2026)
Publisher : CV Raskha Media Group

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.64803/cessmuds.v2.168

Abstract

Students of vocational high schools in electrical programs work with energized equipment during workshop practice, yet their understanding of electrical occupational safety and health (OSH) and installation standards is often limited to memorization, while emerging low-power technologies such as energy harvesting are rarely introduced. This program aimed to strengthen understanding of electrical OSH and the Indonesian General Requirements for Electrical Installations (PUIL) and to introduce energy harvesting technology to students of SMK Panca Budi, Medan, through a collaboration between Universitas Pembangunan Panca Budi (UNPAB) and Universiti Kebangsaan Malaysia (UKM). It was conducted in person on 28 October 2026 with 20 grade XI Electrical Power Engineering students. It consisted of a training session on electrical hazards, personal protective equipment, lock-out tag-out, first aid, and PUIL protection requirements delivered by the UNPAB team, followed by an on-site expert lecture on energy harvesting by a UKM researcher and a discussion session. The program was evaluated descriptively at the reaction level of the Kirkpatrick model using attendance records, observation, documentation, and a satisfaction questionnaire. All planned activities were implemented, and the average participant satisfaction fell into the satisfied category; however, no questions were raised during the discussion session, indicating that two-way interaction needs to be strengthened. The program produced a signed implementation arrangement, an activity video, and an online news article, and its materials were mapped to the learning outcomes of the Occupational Safety, Health, and Environment course. Future programs should incorporate hands-on activities and pre–post knowledge measurement.