Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : MEKTEK

SISTEM PROTEKSI GENERATOR TURBIN UAP (Studi Kasus: Pabrik Gula Camming) Amin, Nurhani
MEKTEK Vol 14, No 1 (2012)
Publisher : MEKTEK

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (134.611 KB)

Abstract

This study aims to determine the extent of the protection system reliability steam turbine generator at Camming Sugar Factory in Bone regency against short circuit. Generator protection system reliability at Camming Sugar Factory in 1996 to 2003 reliability configuration is 1. In 2004 to 2007, the series reliability configuration is 0.9994, reliability parallel configuration is 1.0 and backup configuration is 0.9995. In 2008 to 2011, the series and parallel configurations reliability is 1, while the backup configuration is 0.9998. In 2012, the series reliability configuration are 0.9998, parallel eliability,configuration is  0.0007 and backup configuration reliability is 1. This shows that the generator protection system reliability at Camming Sugar Factory classified very well.