CONSTRUCTION MANAGEMENT ANALYSIS OF CIDERES HOSPITAL Zaid Al Hakim; Saihul Anwar
Journal of Green Science and Technology Vol 3, No 1 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i1.2149

Abstract

Reliable infrastructure requires effective and efficient management from the planning, structural, construction, operational and maintenance phases to the end of service life. Good management of civil infrastructure guarantees not only to save funds, but to use natural resources appropriately, thus ensuring ecological sustainability.Construction management is part of civil engineering science that focuses on managing construction projects to realize technical concepts and designs produced by other parts of civil engineering science. Construction management aims to build built physical facilities or infrastructure that is needed to support human life.Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements.This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Based on the calculation of cash flow to complete the construction of Cideres Hospital Kadipaten Dawuan Majalengka project until final stage more or less cost as much Rp. 9,034,000,000,00. These costs are divided into two parts, structure and architecture work ,for structures the cost as much Rp. 3,644,000,000,00 and for architecture the cost is Rp. 5,390,000,000,00. From the calculation of CPM scheduling analysis, the development of Cideres Hospitalproject takes time for 45 weeksKeyword: Project Management, Bar Chart, S Curve, Critical Path Method
ANALYSIS OF CONSTRUCTION MANAGEMENT CONSTRUCTION PROJECTS DEVELOPMENT OF FLATS OF TEGAL ALUR DKI JAKARTA Akhmad Jamaludin; Saihul Anwar; Bukhori Bukhori
Journal of Green Science and Technology Vol 2, No 2 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i2.1288

Abstract

Location of the development project of Tegal Alur DKI Jakarta KSO.WIKA & CAKRA in the Lingkungan III Tegal Alur West Jakarta coordinates Y: 2500.000 X: 2500.000 (West Jakarta PUPR Office)Project management is an attempt to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities of the basic functions of project management namely planning, implementation and control. Of the three activities are controlled resources on a project that includes manpower, equipment, materials, money and methods.Analysis of Construction Management of Jakarta TegalAlur DKI Jakarta Project Development Project includes Analysis of Work Implementation Method, Volume Calculation and Budget Plan of Jakarta TegalAlur DKI Jakarta Development Project, Schedule Compilation at TegalAlur DKI Jakarta Flower Housing Project, Cash Flow Analysis On Development Project of TegalAlur DKI Jakarta Flats.This research methodology is composed of several main stages, namely Preparation of Survey and Identification of Field, Seeking primary data and secondary data in related institution and department needed to complete data needed in preparation of thesis, Conducting analysis of data obtained through identification problem and make formulation, Taking conclusions and suggestions from the results of research.With Budget Plan Cost and calculation of workload of Jakarta Flat Development Project TegalAlur DKI Jakarta resulted in Working Time Plan takes 231 days using CPM scheduling method with estimated cost of Rp. 36.690.228.549 Keywords         :Project Management, Bar Chart, Curva S, CPM (Critical Path Method)
Co-Authors Abdul Wahid Abdur Rahman Ade Wahab Aghniya, Shilvy Agung Prasetyo Agus Gunawan Ahmad Mansubun Zamanudin Ainun Yusri Akbar Winasis Akhmad Jamaludin Aldi Aldi Andi Darmawan Andono, Agung Ari Andri Prabowo Anggriani, Esa Arief Firmanto Arief Ridho Syaepullah Arif Kurnia Nugraha Arip Saepudin Aryati Indah Kusumastuti Asep Agung Awliya Tribhuwana Azi Ibrahim Humaidi Baban Sobana Bagas Ramadhan Bukhori Bukhori Bukhori, Bukhori Cepi Maulana Christhoper Anderson Dea Devira Hidayati Deni Setiaji Dennis Bintang Nugroho Diah Utami, Diah Dian Indra Rosdiana Dikdik Nur Fahmi Diky Irdianto Pratama Pratama Dinni Fitri Fadilah Dion Iskandar Disty Prasanty Dynia Shalihatin Alfitri Eki Danet Pranata Putra Endah Kurniyaningrum Esa Anggriani Fadhilah, Qalya Fadilah, Dinni Fitri Fadli Fahrizal Fahmi Arif Rahman Fani Andriani Faozie Novatrianto Faqih Mubarok Amin Faridah Ilmi Firdan Agustiarsyah Fisti Variandini Senjaya Gunawan Gunawan Gunawan Gunawan Hakim, Zaid Al Hamdan Ali Khapid Handri Wildan Fauzi Harry Harpriyanto Heri Mulyono Ikhwanul Fakhri Mu'afa Ikhwanul Fakhri Mu'afa Iko Prasetio Iwan Rudiawan Iyus Imam Jamaludin, Akhmad Jepry Jepry Karim Karim KHUSNUL HOTIMAH Kurnianingrum, Endah Liani Dwi Utari Mahendra, Bobby Maulana, Cepi Mohamad Azhari Muhamad Faisal Firdaus Muhamad Salman Salahuddin Muhammad Lukie Yudhistira Muhammad Yassin Zubair Pratama Mulya, Hegi Daniel Mutamakin Mutamakin N.I.S, Septi Dwi Nikko Rozy Nikko Rozy Nopa Pahlawati Nugroho, Dennis Bintang Nurdiyanto Nurdiyanto Nurfatah Alkarim Ohan Farhan Oky Fajar Rochman Osep Saepul Azhar Pahlawati, Nopa Panangian Situmorang Pebi Mahar Ramadhan Pontan, Darmawan Prasanty, Disty Prasetio, Iko Pratama, Diky Irdianto Pratama Recky Dwi Permadi Rediansyah, Trisna Ferdy Retno Wulansari Ridlo Hafizh Alim Rizal Pikih Pratama Rochman, Oky Fajar Rosdiana, Dian Indra Roza Legawa Saeful Hadi Salman Alparis Septi Dwi N.I.S Shilvy Aghniya Sigit Hidayat Siti Masitoh Sugeng Riyanto Suhadi Suhadi Sujarwadi, Jajang Sulaiman Alizulfiqar Sulistijo Edhy Purnomo TATI NURHAYATI Teguh Santoso Tri Rezki Wahyu Azhari Trisno Adi Saputra Tulus Widiarso Wildan Alfian Wisnu Saefuloh Yanto Heryanto Yudha Prigadi Yudi Sutomo Zaid Al Hakim Zaki, M.