Found 22 Documents
Search

Penentuan Peringkat Faktor Risiko dalam Rekrutmen Tenaga Kerja yang Mempengaruhi Biaya Tenaga Kerja pada Proyek Riantini, Leni Sagita; Trigunarsyah, Bambang; Abidin, Ismeth; Latief, Yusuf
Jurnal Teknik Sipil Vol 12, No 3 (2005)
Publisher : Institut Teknologi Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (102.661 KB)

Abstract

Abstrak. Dalam melakukan rekrutmen tenaga kerja, terdapat beberapa faktor yang mempengaruhi biaya tenaga kerja. Faktor-faktor ini dapat mengganggu kinerja pelaksanaan proyek dan dapat mengakibatkan terjadinya penyimpangan pada biaya tenaga kerja. Penyimpangan biaya ini perlu dianalisa, dicari penyebabnya dan ditentukan tindakan koreksi yang sesuai. Penentuan tindakan koreksi yang tepat merupakan suatu analisa pengambilan keputusan, yang mana perlu dilakukan analisa terhadap berbagai risiko yang dapat terjadi. Penentuan peringkat faktor-faktor risiko dalam rekrutmen tenaga kerja dapat membantu dalam mengambil keputusan tindakan koreksi yang paling sesuai untuk mengantisipasi penyimpangan yang terjadi. Bobot/nilai pada faktor risiko dapat ditentukan dengan memakai metode AHP (Analytical Hierarchial Process). Faktor risiko dengan peringkat yang tinggi (dengan bobot yang tinggi) berarti memiliki tingkat prioritas yang lebih utama untuk ditangani dan ditanggulangi.Abstract. In labor recruitment, there are several factors that affect the labor costs. These factors can disrupt the project execution and can cause variances in labor costs. These variances need to be analyzed through the roots of the causes and to be corrected. Deciding the proper corrective  action is part of a decision making analysis,where risk analysis is included. Determining the risk ranks from the factors in labor recruitment could support in attaining the suitable corrective action in order to anticipate any variances occurred. AHP (Analytical Hierarchial Process) method can be used to determine the weight/score of the factors. Factors that have high ranks (with high weighted factor) are factors with high risk priorities that need to be assessed and handled
Penentuan Peringkat Faktor Risiko dalam Rekrutmen Tenaga Kerja yang Mempengaruhi Biaya Tenaga Kerja pada Proyek Leni Sagita Riantini; Bambang Trigunarsyah; Ismeth Abidin; Yusuf Latief
Jurnal Teknik Sipil Vol 12 No 3 (2005)
Publisher : Institut Teknologi Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.5614/jts.2005.12.3.5

Abstract

Abstrak. Dalam melakukan rekrutmen tenaga kerja, terdapat beberapa faktor yang mempengaruhi biaya tenaga kerja. Faktor-faktor ini dapat mengganggu kinerja pelaksanaan proyek dan dapat mengakibatkan terjadinya penyimpangan pada biaya tenaga kerja. Penyimpangan biaya ini perlu dianalisa, dicari penyebabnya dan ditentukan tindakan koreksi yang sesuai. Penentuan tindakan koreksi yang tepat merupakan suatu analisa pengambilan keputusan, yang mana perlu dilakukan analisa terhadap berbagai risiko yang dapat terjadi. Penentuan peringkat faktor-faktor risiko dalam rekrutmen tenaga kerja dapat membantu dalam mengambil keputusan tindakan koreksi yang paling sesuai untuk mengantisipasi penyimpangan yang terjadi. Bobot/nilai pada faktor risiko dapat ditentukan dengan memakai metode AHP (Analytical Hierarchial Process). Faktor risiko dengan peringkat yang tinggi (dengan bobot yang tinggi) berarti memiliki tingkat prioritas yang lebih utama untuk ditangani dan ditanggulangi.Abstract. In labor recruitment, there are several factors that affect the labor costs. These factors can disrupt the project execution and can cause variances in labor costs. These variances need to be analyzed through the roots of the causes and to be corrected. Deciding the proper corrective  action is part of a decision making analysis,where risk analysis is included. Determining the risk ranks from the factors in labor recruitment could support in attaining the suitable corrective action in order to anticipate any variances occurred. AHP (Analytical Hierarchial Process) method can be used to determine the weight/score of the factors. Factors that have high ranks (with high weighted factor) are factors with high risk priorities that need to be assessed and handled
The Development of 4D BIM Based Infrastructure Construction Time Planning Standard Operating Procedure to Enhance Communication Quality from Infrastructure Contractor Perspective Almadani Jayadi; Leni Sagita Riantini
Journal of International Conference Proceedings (JICP) Vol 2, No 1 (2019): Proceedings of the 3rd International Conference of Project Management (ICPM) Bal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (231.047 KB) | DOI: 10.32535/jicp.v2i1.393

Abstract

4D BIM can be utilized as a visual communication media that simulates construction process, including infrastructure projects, to all stakeholders. One of its benefits is to enhance communication quality that can positively affect infrastructure construction time planning phase, which was one of the most important aspect in contractor’s business process. This research used qualitative method through interviews and expert validation to identify main activities in construction time planning phase, 4D BIM role in those activities, and involved stakeholders. As a result, 4D BIM based construction time planning strategy in the form of standard operating procedure and communication flow was developed to be used as guideline references for BIM implementation in Indonesia.
Development of Operational Standards for Risk-Based Cultural Heritage Office Building Maintenance Procedures That The Building Safe and Comfortable to use (Study Case Heritage Office Building PT.X) Yunita Dian Suwandari; Leni Sagita Riantini
Journal of International Conference Proceedings (JICP) Vol 2, No 1 (2019): Proceedings of the 3rd International Conference of Project Management (ICPM) Bal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v2i1.505

Abstract

Maintain a sustainable heritage building is currently a crucial challenge.The heritage building is unique from its structure and values such as a historical, education, aesthetics, economy, architecture,community and it requires special handling. One of the problems of heritage buildings in the absence of operational standards (SOP) for maintenance in Indonesia. The purpose of this study to develop a standard operational model maintenance heritage building of risk-based.The research data compose literature review, questionnaires, and qualitative risk data analysis.The risk analysis identified 20 risks of 40 risks variables have the highest risk rank. The result of the study established a risk-based SOP heritage building maintenance.The conclusion it can help to build management in improving the quality of heritage building maintenance practise.
The Development of Green BIM Based Standard Operating Procedure on Schematic Design Phase of Building Projects to Improve Duration Performance From The Perspective of Architecture Consultant Rianita Suryani; Leni Sagita Riantini
Journal of International Conference Proceedings (JICP) Vol 2, No 1 (2019): Proceedings of the 3rd International Conference of Project Management (ICPM) Bal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v2i1.482

Abstract

Building Information Modeling (BIM) is one of the technologies that can help the building design process with green building concept and BIM can evaluate energy performance and ongoing assessments that are interpreted by Green BIM. This research aims to determine the activities, stakeholders and the role of Green BIM to improve duration performance on schematic design phase of building projects, which was developed with a Green BIM based Standard Operating Procedure. The methodology is based on secondary data and interview with the respondents who contribute in Architecture Consultant Office. The result is Standard Operating Procedure and illustrates the relationship between activities in each strategy on schematic design phase, the roles of stakeholders and the data exchange flow.
CONCEPTUAL FRAMEWORK OF SAFETY LEADERSHIP RELATIONSHIP TO SAFETY CULTURE IN INCREASING SAFETY PERFORMANCE OF CONSTRUCTION PROJECTS Tri Rachma Sari; Rossy Armyn Machfudiyanto; Leni Sagita Riantini
Indonesian Journal of Multidisciplinary Science Vol. 1 No. 9 (2022): Indonesian Journal of Multidisciplinary Science
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1196.925 KB) | DOI: 10.55324/ijoms.v1i9.168

Abstract

The construction industry is still one of the biggest contributors to the number of accidents in Indonesia, this explains the low safety performance in construction projects. The low safety performance is proof that safety has not become a priority and has not become a culture. The maturity level of safety culture in the construction industry is at a reactive level, which means it is still very low and efforts need to be made to continuously improve it. The results of the literature study state that there are several efforts that can be made to improve safety culture, namely in terms of leadership, safety behavior, safety planning, individual capabilities, and reporting and evaluation. Safety leadership has the greatest role in enhancing safety culture. Safety leadership is part of a leadership system which is defined as the process of interaction of leaders with followers to achieve safety. Improved safety culture can improve safety performance on construction projects. The purpose of this study was to determine the variables and indicators of safety leadership that can be a part of improving safety culture and the variables and indicators that are used to measure safety performance. The results of these indicators are expected to be a concern for improvement and references to improve safety culture and affect the safety performance of construction projects, so as to reduce the number of accidents in construction projects.
Stakeholder Identification in Internal Control of Building Construction using Design and Build Contract to Improve Efficiency and Effectiveness Marastuti, Putri; Riantini, Leni Sagita
International Journal of Science, Technology & Management Vol. 5 No. 3 (2024): May 2024
Publisher : Publisher Cv. Inara Colaboration with www.stie-sampit.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46729/ijstm.v5i3.1092

Abstract

The amount of infrastructure development in Jakarta makes internal control of the implementation of design and build contracts for the construction of state buildings need attention. The problem in internal control is there are still some recurring findings and supervisory findings that are not detected by Government Internal Supervisory Apparatus (APIP) but found by external auditors, as well as delays in completing assignments. The problems include a limited number of technical auditors, uneven knowledge, and experience of construction supervision, overlapping assignments, and a report process that takes time. These problems can have an impact on the implementation of internal control, that is lack of achievement of internal control objectives and the potential for non-compliance with the construction process with laws and regulations, thus showing that internal control of construction is not running effectively and efficiently. To improve efficient and effective internal supervision of construction, it is necessary to standardize operational procedures (SOP) or work procedures for internal control of construction, especially for design and build contracts. This research aims to identify stakeholders and the roles and responsibilities of each party in internal control of building construction using design and build contract to improve efficiency and effectiveness. The results reveal a set of internal and external stakeholders as well as the form of organizational structure and the relationship of coordination and responsibility lines. The results of this research also emphasize the roles and responsibilities of each stakeholder so that each party fully understands the obligation to carry out internal supervision assignments for design and build construction.
Development of Unit Price Contract Standards Between Main Contractor and Subcontractor in PT XYZ Factory Home Appliance Project Based on Contract Management Body of Knowledge to Reduce Claims on Project Anggraini, Rika; Latief, Yusuf; Riantini, Leni Sagita
Journal of International Conference Proceedings Vol 6, No 7 (2023): 2023 ICPM Bali Proceeding
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v6i7.2759

Abstract

Contract management methods are important in a construction project. The factory home Appliance project is one of the national strategic projects in an industrial area. In the execution of the contract, there are claims that occur between the main contractor and the subcontractor. This research was conducted to provide the development of contract management based on Contract Management Body of Knowledge to reduce risk-based claims. The results of this study can provide input and new guidelines for contract management that will be carried out in the future.
Identifying Communication Flow in the Development of Apartment Project X to Enhance Time Performance Aditama, Satya; Riantini, Leni Sagita
Dinasti International Journal of Digital Business Management Vol. 5 No. 4 (2024): Dinasti International Journal of Digital Business Management (June - July 2024)
Publisher : Dinasti Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38035/dijdbm.v5i4.2665

Abstract

This research aims to develop a risk-based communication flow in apartment projects with a focus on improving time performance. The methods employed include surveys and case studies, with data collected through the creation and distribution of questionnaires to experts, along with an analysis of results conducted by Company X. The findings indicate that the communication flow implemented at PT. X has proven to be valid and effective. However, several factors hinder the smooth communication flow, such as inadequate planning and scheduling of work, insufficient communication due to mismatched methods and technologies, inefficient information distribution systems, inadequate project budget planning, lack of resources, incomplete scheduling of time and resources, inappropriate listening and speaking skills, lack of empathy among parties, inadequate facilities and infrastructure, emotional conditions, and lack of mastery of communication techniques. Based on these findings, several actions are recommended to enhance communication flow, including improving planning and scheduling of work, using communication methods and technologies appropriate to field conditions, improving information distribution systems, ensuring project budget planning availability, increasing resources, creating comprehensive time and resource planning, enhancing listening and speaking skills, improving empathy among parties, upgrading facilities and infrastructure, controlling emotional conditions, and enhancing mastery of communication techniques. By implementing these recommendations, it is hoped that the communication flow in apartment projects can operate more effectively and efficiently, thereby improving overall project time performance.
Development of Unit Price Contract Standards Between Main Contractor and Subcontractor in PT XYZ Factory Home Appliance Project Based on Contract Management Body of Knowledge to Reduce Claims on Project Anggraini, Rika; Latief, Yusuf; Riantini, Leni Sagita
Journal of International Conference Proceedings Vol 6, No 7 (2023): 2023 ICPM Bali Proceeding
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v6i7.2759

Abstract

Contract management methods are important in a construction project. The factory home Appliance project is one of the national strategic projects in an industrial area. In the execution of the contract, there are claims that occur between the main contractor and the subcontractor. This research was conducted to provide the development of contract management based on Contract Management Body of Knowledge to reduce risk-based claims. The results of this study can provide input and new guidelines for contract management that will be carried out in the future.