Claim Missing Document
Check
Articles

ANALISA PERENCANAAN SISTEM DRAINASE DALAM UPAYA PENANGGULANGAN BANJIR DI KECAMATAN GANDUSARI KABUPATEN TRENGGALEK Rizqi Dwi Prasetyo; Yosef Cahyo; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (373.001 KB) | DOI: 10.30737/jurmateks.v2i1.405

Abstract

In industrial areas or densely populated settlements, generally found channels that function besides to drain rainwater as well as to discharge domestic wastewater or dirty water from households. Drainage systems are often the main problem in the occurrence of flooding. It is necessary to analyze how their performance and resistance to flooding in the District of Gandusari, Trenggalek Regency. For analysis of drainage system planning in flood prevention efforts, the authors used the Van-Breun and Mononobe calculation methods to determine the number of incoming water discharge, the ideal dimension of the channel to accommodate the inlet discharge channel, and calculate the cost budget plan (RAB) of the builder. From the analysis, results obtained a cumulative discharge of rainwater, and dirty water entering the drainage amounted to 0.4695 m3 / sec. From the calculation, the ideal dimensions of the drainage can be obtained to be able to accommodate rainwater runoff and dirty water discharge using square channels, where the 1.5 m channel height is all added to the water level of 0.2 m and 0.7 m in width 500 m. While the budget plan for the construction costs is Rp. 794,048,000.00 -Di daerah industri atau pemukiman padat penduduk umumnya ditemukan saluran yang berfungsi selain untuk mengalirkan air hujan juga sekaligus untuk pembuangan air limbah domestik ataupun air kotor dari rumah tangga. System drainase sering menjadi pokok masalah dalam terjadinya banjir, maka perlu di Analisa bagaimana kinerjanya dan ketahanan terhadap banjir di Kecamatan Gandusari Kabupaten Trenggalek. Untuk analisis perencanaan sistem drainase dalam upaya penanggulangan banjir penulis menggunakan metode perhitungan Van-Breun dan Mononobe untuk mengetahui angka debit air yang masuk, dimensi ideal saluran untuk menampung saluran debit air masuk dan menghitung rencana anggaran biaya (RAB) pembangunanya. Dari hasil analisa didapatkan debit komulatif air hujan dan air kotor yang masuk ke drainase sebesar 0.4695 m3/detik. Dari perhitungan didapatkan dimensi saluran drainase yang ideal agar mampu menampung limpasan air hujan dan debit air kotor dengan menggunakan saluran berbentuk persegi, dimana tinggi saluran 1,5 m semuanya ditambahkan dengan tinggi jagaan air sebesar 0,2 m dan lebar 0,7 m dengan panjang 500 m. Sedangkan rencana Anggaran Biaya pembangunannya sebesar Rp. 794.048.000,00,-
ANALISA STABILITAS CHECKDAM PABYONGAN DESA MULYOSARI KECAMATAN PAGERWOJO KABUPATEN TULUNGAGUNG Jarno Sutikno; Ahmad Ridwan; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 1 (2018): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (237.329 KB) | DOI: 10.30737/jurmateks.v1i1.141

Abstract

Checkdam is a control building created due to the presence of water flow with a large enough sediment concentration. Plan to build the Kali Wangi Check dam is one of the flood mitigation efforts that caused severe damage to several drainage structures. Selection of the type of dam is based on the geological conditions of the location where the Check dam is to be built, namely the subgrade in the form of sand, rocky gravel which is also the same on the cliffs, so the type of dam used is the Gravity Type, the pair of river stones with a mixture of 1: 4 outer and The surface is spread with a 1: 2 mixture with a thickness of 2 cm, for the inside using a 1: 3 mixture this mixture is used for the dam and the apron. It is hoped that it can provide a maximum and sturdy function, for that the dam must be subjected to strength control from several aspects, namely control of rolling, shear, soil bearing capacity, and water lifting force on the dam body. From the calculation, it is concluded that the Kali Wangi Check dam is strong withstand the forces acting on it.Checkdam adalah bangunan pengendali yang dibuat karena adanya aliran air dengan konsentrasi sediment yang cukup besar. Rencana pembuatan Checkdam Kali Wangi ini merupakan salah satu usaha penanggulangan banjir yang mengakibatkan kerusakan yang parah pada beberapa bangunan pengaliran. Pemilihan type dam di dasarkan pada kondisi geologi lokasi calon dibangunnya Checkdam, yaitu tanah dasar berupa tanah pasir , kerikil berbatu yang juga sama pada tebing-tebingnya, maka type dam yang dipakai adalah Type Gravitasi, Pasangan batu kali dengan campuran 1 : 4 bagian luar dan permukaan disiar dengan campuran 1 : 2 dengan tebal 2 cm, untuk bagian dalam menggunakan campuran 1 : 3 campuaran ini digunakan untuk bagian dam dan apronnya. Diharapkan dapat memberikan fungsi yang maksimal dan kokoh, untuk itu pada dam harus diadankan pengontrolan kekuatan dari beberapa aspek yaitu kontrol terhadap guling, geser, daya dukung tanah maupun gaya angkat air pada tubuh dam. Dari hasil perhitungan disimpulkan bahwa Checkdam Kali Wangi ini kuat menahan gaya-gaya yang bekerja padanya.
PENELITIAN UJI KUAT TEKAN BETON DENGAN MEMANFAATKAN AIR LIMBAH TETES TEBU DAN ZAT ADDITIVE CONCRETE Mochamad Ahsin Ansori; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (693.41 KB) | DOI: 10.30737/jurmateks.v2i1.388

Abstract

Concrete has a weakness that is having a low tensile strength and brittle so that the concrete is given steel reinforcement to anticipate it. This addition was carried out to study and determine the effect of sugarcane waste on compressive strength, flexural strength on normal quality concrete with the addition of 0%, 10%, 20% and 30% in compressive loads. Testing is done after 28 days. Concrete with the addition of 30% sugar cane is more capable of producing high flexural strength than the others. Addition of sugar cane drops resulted in optimum compressive strength of 10%, 16.75MPa, 20%, 16.55MPa, 30%, 16.40MPa. For the highest flexural strength of concrete in the 15/15/60 beam sample, the concrete mixture was added to 30% sugar cane by 5.00 MPa, higher than normal concrete 4.96 MPa.Beton mempunyai kelemahan yaitu mempunyai kuat tarik yang rendah dan bersifat getas (brittle) sehingga beton diberi tulangan baja untuk mengantisipasinya. Penambahan ini dilakukan untuk mempelajari dan mengetahui pengaruh limbah tetes tebu terhadap kuat tekan, kuat lentur pada beton mutu normal dengan penambahan 0%, 10%, 20% dan 30% pada beban tekan. Pengujian dilakukan setelah 28 hari. Beton dengan penambahan tetes tebu 30% lebih mampu menghasilkan nilai kuat lentur tinggi dari pada yang lainya. Penambahan limbah tetes tebu menghasilakan kuat tekan optimum yaitu,10%,16,75MPa, 20%,16,55MPa, 30%,16,40MPa. Untuk kuat lentur beton pada sampel balok 15/15/60 yang paling tinggi yaitu pada campuran beton penambahan tetes tebu 30% sebesar 5,00 MPa, lebih tinggi dari pada beton normal 4,96 MPa. 
ANALISIS DAMPAK LALU LINTAS PENGEMBANGAN PASAR PON TRENGGALEK Dwi Kriswanto; Ahmad Ridwan; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 2 (2018): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (649.83 KB) | DOI: 10.30737/jurmateks.v1i2.381

Abstract

The planned development of the Trenggalek Pon Market, which is located at Jl.RA Kartini No. 1 Trenggalek, will cause generation and attraction which will result in a decrease in the performance of roads and intersections around the area. For this reason, it is necessary to conduct a Traffic Impact Analysis (Andalalin) in order to minimize the decline in performance of roads and intersections and to provide solutions to solving traffic problems that occur due to the development of the Trenggalek Pon Market. Based on the results of the analysis of traffic impacts for each phase of the activity ie from the current condition (existing), planned year (coming year) without development and with development, there is a very large generation and pull of 338.6 pcu / hour pull and 278.7 pcu / hour.Rencana pengembangan Pasar Pon Trenggalek yang berada di Jl.RA Kartini No 1 Trenggalek, akan menimbulkan bangkitan dan tarikan yang berdampak pada penurunan kinerja ruas jalan dan simpang di sekitar kawasan tersebut. Untuk itu perlu di lakukan Analisis Dampak Lalu Lintas (Andalalin) agar dapat meminimalisir penurunan kinerja ruas jalan dan simpang serta dapat memberikan solusi pemecahan masalah lalu lintas yang terjadi akibat pengembangan Pasar Pon Trenggalek. Berdasarkan hasil analisis dampak lalu lintas untuk masing-masing tahapan kegiatan yaitu dari kondisi saat ini (eksisting), tahun rencana (tahun yang akan datang) tanpa pengembangan dan dengan pengembangan, terjadi bangkitan dan tarikan yang sangat besar yaitu sejumlah 338,6 smp/jam tarikan dan 278,7 smp/jam.
PENGENDALIAN BIAYA DAN JADUAL TERPADU PADA PROYEK KONSTRUKSI Ahmad Ridwan; Rekso Ajiono
U Karst Vol. 1 No. 1 (2017): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v1i1.84

Abstract

The main resources limited to the stage of implementing a construction project are cost, quality and time. Planning, scheduling and controlling are important steps to take in order to achieve the project's objectives with limited resources. The "Eaned Value" method is a method of control used to control project costs and schedules in an integrated manner. This method provides information on the status of project performance in a reporting period and provides information on the predicted costs required and time to complete all work based on performance indicators when reporting. In the Construction of the Hospital Medical Rehabilitation Installation Building. Overview of Kediri, the information obtained when reporting on the 91st day was Planed Value / PV = Rp 1.4325 billion, Earned Value / EV = Rp.1,3747 and Actual Cost / AC=Rp.1,3598 billion. At present the project performance in terms of cost is said to be profitable (Cost Variant / CV = + Rp. 0.01 billion and Cost Performed Index / CPI = 1.01> 1). From the schedule aspect, it is said that this project is experiencing delays (Schedule Variant / SV = -Rp.0.06 billion and Schedule Performance Index / SPI = 0.96 <1). The predicted cost needed to complete all work is Rp. 2.8683 billion, showing a profit (under a budget plan of Rp. 2.8998 billion). While the prediction schedule required 129 days, showed experiencing a delay of 2 days from the plan.AbstrakSumberdaya utama terbatas pada tahap pelaksanaan suatu proyek kostruksi adalah biaya, mutu dan waktu. Perencanaan, penjadualan dan pengendalian adalah langkah penting untuk dilakukan agar tujuan pelaksanaan proyek dengan sumberdaya terbatas ini tercapai. Metode ”Nilai Hasil” (Eaned Value) adalah sutau metode pengendalian yang digunakan untuk mengendalikan biaya dan jadual proyek secara terpadu. Metode ini memberikan informasi status kinerja proyek pada suatu periode pelaporan dan memberikan informasi prediksi biaya yang dibutuhkan dan waktu untuk penyelesaian seluruh pekerjaan berdasarkan indikator kinerja saat pelaporan. Pada Pembangunan Gedung Instalasi Rehabilitasi Medik RS. Gambiran Kediri, informasi yang didapat saat pelaporan pada hari ke-91 adalah Planed Value/ PV=Rp 1,4325 milyar, Earned Value/ EV=Rp.1,3747 dan Actual Cost /AC=Rp.1,3598 milyar. Pada saat ini kinerja proyek dari aspek biaya dikatakan untung (Cost Varian/ CV= + Rp. 0.01 milyar dan Cost Performed Index /CPI=1,01>1). Dari aspek jadual, dikatakan proyek ini mengalami keterlambatan (Schedule Varian /SV= -Rp.0,06 milyar dan Schedule Performance Indek/SPI=0,96 <1). Prediksi biaya yang diperlukan untuk menyelesaikan seluruh pekerjaan adalah Rp. 2,8683 milyar, menunjukkan mendapat keuntungan (dibawah rencana anggaran Rp. 2,8998 milyar). Sedangkan prediksi jadual yang diperlukan 129 hari, menunjukkan mengalami keterlambatan 2 hari dari rencana.
PELAKSANAAN MANAJEMEN KONSTRUKSI PADA PROYEK PEMBANGUNAN BANK SINAR MAS KEDIRI Yosef Cahyo Setianto Poernomo; Ahmad Ridwan; Zulkifli Lubis; April Gunarto; Sigit Winarto
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.101

Abstract

 Bank Sinar Mas Kediri project is a development project that uses a unique implementation method, namely the Top Down method, that is, the construction starts from the floor plate as a new foundation and then continues with the construction of the ground floor 1,2,3. The use of the Top Down method requires a column called King Post which is a column of steel profiles as a temporary column. The hotel is built on a land area of 3248 m2 with a building height of + 123,600 m, - 9,800 m and uses 118 boredpile foundations. This project uses the Fixed Price Lumpsum contract system. This research aims to identify the cause of the delay in the completion of the Sinar Mas Kediri development project. The results of the analysis show that the delay in the completion of the project is due to the delay in completion of the excavation work. The delay was due to the lack of procurement of water pumping or drying equipment, weather or climate and the lack of excavation and limited number of heavy equipment used. Keywords: Delays, Time, Construction.  Proyek Bank Sinar Mas Kediri merupakan proyek pembangunan yang menggunakan metode pelaksanaan yang unik yaitu metode Top Down yaitu pembangunan dimulai dari pelat lantai sebagai tumpuan baru kemudian dilanjutkan dengan pembangunan lantai dasar 1,2,3. Penggunaan metode Top Down memerlukan kolom yang disebut King Post yang merupakan kolom dari profil baja sebagai kolom sementara. Hotel tersebut dibangun di atas tanah seluas 3248 m2 dengan tinggi bangunan + 123,600 m, - 9,800 m dan menggunakan 118 pondasi boredpile. Proyek ini menggunkan sistem kontrak Lumpsum Fixed Price.Penelitian ini bertujuan untuk mengidentifikasi penyebab keterlambatan penyelesaian proyek pembangunan Bank Sinar Mas Kediri. Hasil analisis menunjukkan bahwa Keterlambatan penyelesaian proyek disebabkan keterlambatan penyelesaian pekerjaan penggalian tanah. Keterlambatan tersebut dikarenakan kurangnya pengadaan akan alat pemompa air atau alat pengeringan, cuaca atau iklim dan tidak adanya jumlah tenaga kerja penggalian dan terbatasnya jumlah alat berat yang digunakan. Kata Kunci : Keterlambatan, Waktu, Konstruksi Kata Kunci : keterlambatan, waktu, konstruksi.
ANALISA STABILITAS CHECKDAM PABYONGAN DESA MULYOSARI KECAMATAN PAGERWOJO KABUPATEN TULUNGAGUNG Jarno Sutikno; Ahmad Ridwan; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.141

Abstract

Checkdam is a control building created due to the presence of water flow with a large enough sediment concentration. Plan to build the Kali Wangi Check dam is one of the flood mitigation efforts that caused severe damage to several drainage structures. Selection of the type of dam is based on the geological conditions of the location where the Check dam is to be built, namely the subgrade in the form of sand, rocky gravel which is also the same on the cliffs, so the type of dam used is the Gravity Type, the pair of river stones with a mixture of 1: 4 outer and The surface is spread with a 1: 2 mixture with a thickness of 2 cm, for the inside using a 1: 3 mixture this mixture is used for the dam and the apron. It is hoped that it can provide a maximum and sturdy function, for that the dam must be subjected to strength control from several aspects, namely control of rolling, shear, soil bearing capacity, and water lifting force on the dam body. From the calculation, it is concluded that the Kali Wangi Check dam is strong withstand the forces acting on it.Checkdam adalah bangunan pengendali yang dibuat karena adanya aliran air dengan konsentrasi sediment yang cukup besar. Rencana pembuatan Checkdam Kali Wangi ini merupakan salah satu usaha penanggulangan banjir yang mengakibatkan kerusakan yang parah pada beberapa bangunan pengaliran. Pemilihan type dam di dasarkan pada kondisi geologi lokasi calon dibangunnya Checkdam, yaitu tanah dasar berupa tanah pasir , kerikil berbatu yang juga sama pada tebing-tebingnya, maka type dam yang dipakai adalah Type Gravitasi, Pasangan batu kali dengan campuran 1 : 4 bagian luar dan permukaan disiar dengan campuran 1 : 2 dengan tebal 2 cm, untuk bagian dalam menggunakan campuran 1 : 3 campuaran ini digunakan untuk bagian dam dan apronnya. Diharapkan dapat memberikan fungsi yang maksimal dan kokoh, untuk itu pada dam harus diadankan pengontrolan kekuatan dari beberapa aspek yaitu kontrol terhadap guling, geser, daya dukung tanah maupun gaya angkat air pada tubuh dam. Dari hasil perhitungan disimpulkan bahwa Checkdam Kali Wangi ini kuat menahan gaya-gaya yang bekerja padanya.
STUDY PERENCANAAN PONDASI TIANG PANCANG JEMBATAN SEMBAYAT BARU II KECAMATAN MANYAR, KABUPATEN GRESIK Feri Febriantoro; Yosef Cahyo Setianto Purnomo; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.147

Abstract

The foundation is a building medium that functions as a load bearer for the upper structure to the soil layer. The implementation method used for the first time is to carry out preparation activities, data collection, observation, data processing/planning of the bearing capacity of the pile based on Sondir data according to the literature of Ir. Sardjono and determine the bearing capacity of the pile and the axial bearing capacity based on the N-SPT data from the Meyerhof method. The analysis obtained from the study of the Sembayat Baru II Bridge project in Manyar District, Gresik Regency, is to use a Spun Pile with a diameter of 50 cm, which is able to withstand loads of up to 10572.66 KN. Based on the Converse-Labarre theory, the value of the efficiency coefficient (Ce) for solid sand is 0.7 (for S = Ø 3 - 6. Ø). After controlling the pile group on the planned pile group arrangement, the value was 0.7. Then the planned group arrangement (Safe). In the calculation of the value of lateral force control, according to Broms (1964), a theory is 4.69 more than the standard value (3), which can be declared Safe.Pondasi merupakan sebuah media bangunan yang berfungsi sebagai pemikul beban struktur atas menuju lapisan tanah. Metode pelaksanaan yang digunakan pertama kali adalah melakukan kegiatan persiapan, pengumpulan data, observasi, olah Data/Perencanaan daya dukung tiang berdasarkan Data Sondir sesuai literatur Ir. Sardjono dan menentukan kapasitas daya dukung tiang pancang beserta daya dukung aksial berdasarkan data N-SPT dari metode Meyerhof. Analisa yang diperoleh dari study proyek Jembatan Sembayat Baru II di Kecamatan Manyar, Kabupaten Gresik adalah menggunakan Spun Pile dengan diameter 50 cm yang mampu menahan beban hingga 10572,66 kn. Berdasarkan teori Converse – Labarre harga koefisien efisiensi (Ce) untuk pasir padat adalah 0,7 (untuk S = Ø 3 – 6 . Ø). Setelah dilakukan kontrol kelompok tiang pada susunan kelompok tiang yang direncanakan didapatkan nilai sebesar 0,7. Maka susunan kelompok yang direncanakan (Aman). Pada perhitungan nilai kontrol gaya lateral menurut teori Broms (1964) yaitu 4,69 lebih dari nilai standard (3) yang dapat dinyatakan Aman.
ANALISA KEBUTUHAN RUANG PARKIR RUMAH SAKIT BHAYANGKARA KOTA KEDIRI Eko Dany Trismanto; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.167

Abstract

Parking is one of the problems that is often encountered in terms of transportation, especially in the cause of congestion that is rampant in various big cities that are developing, as well as Indonesia. Parking is a phenomenon that affects the movement of vehicles when vehicles with high movement intensity will be obstructed by vehicles parked on the shoulder of the road, causing congestion, in connection with this, an evaluation of the parking needs at Bhayangkara was conducted. Kediri City Hospital was implemented. The method used is survey analysis. The highest volume for motor occurred on Saturday, August 5, 2017, with 978 units for a motor on Thursday, August 3, 2017, with 161 units. The parking space requirement based on the Z formula approach is smaller than the existing capacity. If the parking space requirement value is determined based on the Z formula, the parking space requirement value can still be served, so that the parking area capacity can be met. Perpakiran adalah salah satu masalah yang sering kali dijumpai dalam hal transportasi, terutama dalam penyebab kemacetan yang sedang merajalela di berbagai kota besar yang sedang berkembang, begitupun Indonesia. Perpakiran menjadi fenomena yang mempengaruhi pergerakan kendaraan disaat kendaraan-kendaraan yang mempunyai intensitas pergerakan yang begitu tinggi akan terhambat oleh kendaraan yang parkir dibahu jalan sehingga meyebabkan kemancetan, Sehubungan dengan adanya masalah tersebut, maka dilakukan evaluasi kebutuhan parkiran yang ada di Rumah sakit Bhayangkara Kota Kediri. Metode yang digunakan ialah analisa survei. Volume tertinggi untuk montor terjadi pada hari sabtu 5 Agustus 2017 sebanyak 978 unit untuk montor terjadi pada hari kamis 3 Agustus 2017 sebanyak 161 unit. Kebutuhan ruang parkir berdasarkan pendekatan rumus Z lebih kecil dari kapasitas yang ada. Apabila nilai kebutuhan ruang parkir ditetapkan berdasarkan rumus Z maka nilai kebutuhan ruang parkir masih dapat dilayani, sehingga kapasitas area parkir bisa terpenuhi.
PERENCANAAN STRUKTUR ATAS ASRAMA PUTRI DI UNIVERSITAS KADIRI Renaldi Oza Pubawa; Ahmad Ridwan; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 2 (2018): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i2.376

Abstract

In this superstructure planning, many methods can be used to calculate the moment, one of which is the ultimate moment calculation method, with reference to SK SNI 2847.2013. For pouring, images can be presented with AutoCAD software. The results of this plan are, for the roof and floor plates, a thickness of 100 mm and 120 mm is used with 12 mm of principal reinforcement and 8 mm of stirrups with a distance of 200 mm. For beam and sloof, they are used the same, namely 16 mm for the main reinforcement and 10 mm for the stirrup reinforcement with a distance of 200 mm for columns used 16 mm reinforcement and 12 mm stirrups with a distance of 200 mm. The load distribution for the roof floor is 20,640,924 kgm, because the assumption of the 1st to 6th-floor loading is the same, which is 23,233,644 kgm. The moment in this planning is 17,074,370 kgm on the plate, 342,733,875 kgm in the beam and 493,536,780 kgm. In the column, there is a moment that is large enough, with a value of 551,697,600 kgm. From the calculation of the earthquake load, the result is = 159843 (kNm).Dalam perencanaan struktur atas ini, banyak metode yang bisa dipakai untuk menghitung momen, salah satunya dengan metode perhitungan momen ultimit, dengan acuan SK SNI 2847,2013. Untuk penuangan gambar dapat disajikan dengan software AutoCAD. Hasil dari perencanaan ini adalah, untuk pelat atap dan lantai digunakan tebal 100 mm dan 120 mm dengan tulangan yang dipakai tulangan pokok 12 mm dan tulangan Sengkang 8 mm dengan jarak 200 mm. Untuk balok dan sloof digunakan sama, yaitu 16 mm untuk tulangan pokok dan 10 mm untuk tulangan Sengkang dengan jarak 200 mm. Untuk kolom digunakan tulangan 16 mm dan Sengkang 12 mm dengan jarak 200 mm. Distribusi beban untuk lantai atap sebesar 20.640,924 kgm, karena asumsi pembebanan lantai 1 ke 6 adalah sama, yaitu sebesear 23.233,644 kgm. Momen pada perencanaan ini adalah pada pelat terjadi sebesar 17.074,370 kgm, pada balok terjadi sebesar 342.733,875 kgm dan 493.536,780 kgm. Pada kolom timbul momen yang cukup besar, dengan nilai 551.697,600 kgm. Dari perhitungan beban gempa di dapatkan hasil  =  159843 (kNm).