Claim Missing Document
Check
Articles

Found 20 Documents
Search

Perbaikan Instalasi dan Pemasangan Lampu Penerangan Masjid Kampung Kiat, Distrik Fakfak Barat Rusliadi Rusliadi
Society : Jurnal Pengabdian Masyarakat Vol 1, No 4 (2022): Juli
Publisher : Edumedia Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55824/jpm.v1i4.118

Abstract

Electrical installation is one way to distribute electricity from the generating center to the load center. The occurrence of fires due to electricity can be caused by several things, including installations that are not in accordance with PUIL standards, irregular maintenance and the use of sockets that accumulate. This is what encourages lecturers and students of the electrical engineering study program at the Fakfak State Polytechnic to carry out a service to repair the installation and installation of mosque lighting in the village of Tips, West Fakfak district. Based on the results of this service, electrical installations have been repaired in accordance with the provisions of the PUIL standard, followed by the installation of lighting on the terraces and prayer rooms. The mosque terrace lighting only uses one switch. This aims to make it easier when turning on the mosque terrace lights.
Pemasangan Instalasi Lampu Penerangan Jalan Energi Mandiri di Kampung Tanama, Distrik Pariwari, Kabupaten Fakfak Rusliadi Rusliadi; Yulianto La Elo
Jurnal Pengabdian kepada Masyarakat Nusantara Vol. 3 No. 2 (2022): Jurnal Pengabdian kepada Masyarakat Nusantara (JPkMN)
Publisher : Cv. Utility Project Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (445.941 KB) | DOI: 10.55338/jpkmn.v3i2.340

Abstract

Naiknya kebutuhan listrik berbanding lurus dengan kenaikan kebutuhan akan minyak dan gas bumi sebagai bahan bakar utama pembangkit listrik yang ada di Indonesia. Salah satu solusinya adalah dengan memanfaatkan energi matahari sebagai alternatif pembangkit listrik, dimana salah satu aplikasi tenaga surya yang paling sederhana yang dapat diaplikasikan langsung ke masyarakat adalah penerangan jalan umum (PJU) bertenaga surya. Hal tersebut melatarbelakangi dilakukannya kegiatan PKM berupa pemasangan instalasi penerangan jalan energi mandiri di Kampung Tanama, yang dari hasil survei ditemukan bahwa belum tersedia fasilitas penerangan jalan yang memadai sehingga aktivitas masyarakat menurun pada saat di malam hari. Dari hasil kegiatan memberikan hasil yang baik dimasyarakat yaitu meningkatkan pemahaman warga mengenai energi terbarukan dan juga memberikan manfaat nyata bagi warga dengan terpasangnya penerangan jalan umum (PJU) bertenaga surya.
RETRACTED: Analisis Potensi Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Pada Sungai Air Besar Kampung Air Besar Kabupaten Fakfak Yulianto La Elo; Rusliadi Rusliadi; Sharin Fahra Syahdinar
EPIC (Journal of Electrical Power Instrumentation and Control) Vol 5, No 2 (2022): EPIC
Publisher : Universitas Pamulang, Prodi teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kabupaten Fakfak, Provinsi Papua Barat mempunyai Daerah Aliran Sungai dan Air Terjun, Sungai Air Besar adalah salah satu sungai yang berpeluang untuk dijadikan sebagai Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Adanya perbedaan elevasi aliran antara hulu dan hilir yang cukup besar diharapkan sumber daya lokal ini dapat dikembangkan potensi lain yang salah satunya untuk Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Diharapkan, Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) ini tidak semata-mata mampu memanfaatkan air sebagai sumber tenaga, tetapi juga mempertinggi keuntungan dengan ketersediaan wisatanya. Tujuan dari penulisan penelitian ini bermaksud untuk mendeteksi kemampuan Sungai Air Besar sebagai Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Metode penelitian yang digunakan adalah metode apung untuk menentukan laju air dan metode cross section. Selanjutnya dilakukan perhitungan untuk memperoleh besar debit air, penentuan tinggi jatuh efektif (Heff) aliran untuk memperoleh daya dan energi yang dapat dihasilkan oleh aliran sungai dengan tetap memperhatikan efisiensi generator dan turbin. Dari hasil perhitungan diketahui besar debit air sungai air besar 23,826 m3/s tinggi jatuh efektif (Heff) aliran 4 m. Dari hasil perhitungan tersebut diketahui perkiraan daya listrik yang dapat dihasilkan sebesar 620,8159  kW.
RETRACTED: Analisis Potensi Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Pada Sungai Air Besar Kampung Air Besar Kabupaten Fakfak Yulianto La Elo; Rusliadi Rusliadi; Sharin Fahra Syahdinar
EPIC Journal of Electrical Power Instrumentation and Control Vol 5, No 2 (2022): EPIC
Publisher : Universitas Pamulang, Prodi teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kabupaten Fakfak, Provinsi Papua Barat mempunyai Daerah Aliran Sungai dan Air Terjun, Sungai Air Besar adalah salah satu sungai yang berpeluang untuk dijadikan sebagai Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Adanya perbedaan elevasi aliran antara hulu dan hilir yang cukup besar diharapkan sumber daya lokal ini dapat dikembangkan potensi lain yang salah satunya untuk Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Diharapkan, Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) ini tidak semata-mata mampu memanfaatkan air sebagai sumber tenaga, tetapi juga mempertinggi keuntungan dengan ketersediaan wisatanya. Tujuan dari penulisan penelitian ini bermaksud untuk mendeteksi kemampuan Sungai Air Besar sebagai Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Metode penelitian yang digunakan adalah metode apung untuk menentukan laju air dan metode cross section. Selanjutnya dilakukan perhitungan untuk memperoleh besar debit air, penentuan tinggi jatuh efektif (Heff) aliran untuk memperoleh daya dan energi yang dapat dihasilkan oleh aliran sungai dengan tetap memperhatikan efisiensi generator dan turbin. Dari hasil perhitungan diketahui besar debit air sungai air besar 23,826 m3/s tinggi jatuh efektif (Heff) aliran 4 m. Dari hasil perhitungan tersebut diketahui perkiraan daya listrik yang dapat dihasilkan sebesar 620,8159  kW.
PEMELIHARAAN DAN PERBAIKAN INSTALASI PENERANGAN RUMAH DI KABUPATEN FAKFAK Naomi Lembang; Desi Lembang; Yulianto La Elo
JMM (Jurnal Masyarakat Mandiri) Vol 7, No 4 (2023): Agustus
Publisher : Universitas Muhammadiyah Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31764/jmm.v7i4.16422

Abstract

Abstrak: Listrik merupakan kebutuhan utama dan penting bagi manusia, untuk berbagai keperluan, mulai dari penerangan, hinggan keperluan rumah tangga. Dalam menghadapi masalah ini perlu adanya layanan kepada masyarakat kegiatan pengabdian pemeliharaan dan perbaikan instalasi penerangan rumah di Desa Pariwari Kecamatan Pariwari Kabupaten Fakfak Provinsi Papua Barat. Tujuan dari kegiatan ini adalah jalur instalasi kabel listrik di rumah warga menjadi rapi, terpasangnya kabel, saklar, stop kontak dan lampu warga yang berstandar SNI serta warga menjadi tahu akan pentingnya pemasangan instalasi listrik yang baik dan benar sehingga warga dapat aman terhindar atau meminimalisir dari bahaya korsleting listrik. Berdasarkan hasil pengamatan kami di beberapa rumah warga, terlihat instalasi listrik yang belum tertata dengan rapi, kabel listrik yang digunakan ada yang tidak berstandar SNI dan lampu penerangan juga ada yang belum menggunakan saklar, solusi yang ditawarkan untuk pelaksanaan kegiatan, Metode yang digunakan pada kegiatan ini berupa pengamatan kerumah warga, memperkenalkan atau memberikan informasi seperti apa kabel, saklar, dan lampu yang berstandar SNI dan memasang dan merakit instalasi listrik dengan rapi dan benar sesuai dengan Persyaratan Umum Instalasi Listrik (PUIL), adapun jumlah rumah yg menjadi sasaran kegiatan yaitu 5 rumah dengan 1 mitra dengan jumlah 14 orang sebagai sasaran penyuluhan. Hasil kegiatan bahwa data hasil penilaian kesukaan kerapian perbaikan pemasangan instalasi penerangan rumah diperoleh persentase 20 % dengan kriteria suka sedangkan 80 % kriteria sangat suka.Abstract: Electricity is the main and important need for humans, for various purposes, ranging from lighting to household needs. In dealing with this problem, it is necessary to provide services to the community for maintenance and repair of home lighting installations in Pariwari Village, Pariwari District, Fakfak District, West Papua Province.The purpose of this activity is to make the electrical wiring installation paths in residents' homes tidy, to install SNI-standard cables, switches, sockets and residents' lights and to make residents aware of the importance of installing good and correct electrical installations so that residents can safely avoid or minimize danger. Electric short circuit. Based on the results of our observations in several residents' houses, it can be seen that the electrical installations have not been neatly arranged, the electricity cables used are not SNI standard and the lighting lamps have not used switches, the solutions offered for the implementation of activities, The method used in this activity is in the form of observing residents' homes, introducing or providing information on SNI-standard cables, switches and lights and installing and assembling electrical installations neatly and correctly in accordance with the General Electrical Installation Requirements (PUIL), As for the number of houses that were the target of the activity, namely 5 houses with 1 partner with a total of 14 people as the target of counseling. The results of the activity show that the results of the assessment of liking the neatness of fixing the installation of home lighting installations obtained a percentage of 20 % with the criteria of liking while 80 % of the criteria really liked.
Peningkatan Tata Nilai Masyarakat melalui Instalasi Lampu Penerangan Jalan Berbasis Tenaga Surya di Kampung Tanama, Kabupaten Fakfak rusliadi rusliadi; Yulianto La Elo; Naomi Lembang; Nurul Husnah
Jurnal Pengabdian kepada Masyarakat Nusantara Vol. 4 No. 3 (2023): Jurnal Pengabdian kepada Masyarakat Nusantara (JPkMN)
Publisher : Cv. Utility Project Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55338/jpkmn.v4i3.1490

Abstract

Pertumbuhan penduduk mempengaruhi kebutuhan listrik setiap tahunnya. Hal ini akan berakibat pada keteragantungan terhadap kebutuhan akan minyak bumi dan dan gas alam yang selama ini menyuplai kebutuhan listrik masyarakat. Untuk mengurangi ketergantungan ini, maka diperlukan sumber energi baru untuk menyuplai kebutuhan listrik dan salah satu yang menjadi solusinya adalah pembangkit listrik tenaga surya. Pembangkit listrik tenaga surya saat ini banyak diaplikasikan pada lampu penerangan jalan umum. Akan tetapi, pada daerah terpencil pengaplikasian PJU masih minim. Terkhusus di kabupaten fakfak kampung tanama, penerangan lampu jalan umum berasal dari rumah warga. Keadaan ini membuat aktivitas masyarakat pada malam hari menjadi terhambat. Penerangan Lampu Jalan Umum menjadi infrastruktur yang sangat dibutuhkan bagi masyarakat tanama terkhusus di RT 05 karena selain untuk mendukung aktivitas warga pada malam harni juga untuk juga meningkatkan faktor keamanan pada daerah tersebut. Hal ini lah yang melatar belakangi kegiatan PKM berupa peningkatan tata nilai masyarakat melalui lampu penerangan jalan berbasis tenaga surya di kampung tanama.terselenggaranya kegiatan ini PKM memberikan dampak yang luarbisa bagi masyarakat dengan meningkatnya tata nilai masyarakat terhadap Lampu Penerangan Jalan Berbasis Tenaga Surya dan adanya peningkatan pemahaman warga tentang tenergi baru dan terbarukan serta terbangunnya relasi yang kuat antarastakeholder dengan akademisi.
Analisis Potensi Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Pada Sungai Air Besar Kampung Air Besar Kabupaten Fakfak La Elo, Yulianto; Rusliadi, Rusliadi; Fahrah Syahdinar, Zharin
Jurnal JEETech Vol. 4 No. 1 (2023): Nomor 1 May
Publisher : Universitas Darul Ulum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32492/jeetech.v4i1.4102

Abstract

Fakfak Regency, West Papua Province has a Watershed and Waterfall, the Air Besar River is one of the rivers that has the opportunity to be used as a Micro Hydro Power Plant (PLTMH). Due to the large difference in flow elevation between upstream and downstream, it is hoped that this local resource can be developed for other potentials, one of which is for Micro Hydro Power Plants (PLTMH). It is hoped that this Micro Hydro Power Plant (PLTMH) will not only be able to use water as a source of energy, but also increase profits with the availability of tourism. The purpose of this research is to detect the ability of the Air Besar River as a Micro Hydro Power Plant (PLTMH). The research method used is the floating method to determine the water rate and the cross section. Furthermore, calculations are carried out to obtain the amount of water discharge, determining the effective fall height (Heff) of the flow to obtain power and energy that can be produced by river flow while account the efficiency of the generator and turbine. From the calculation results, it is known that the large water discharge from the river is 23,826 m3/s, the effective fall height (Heff) flow is 4 m. From the results of these calculations, it is known that the estimated electrical power that can be generated is 620.8159 kW.
Studi Potensi Daya Pembangkit Listrik Tenaga Mikrohidro (PLTMH) di Kampung Ubadari Kabupaten Fakfak Yulianto La Elo; Rusliadi, Rusliadi; Mokan, Muhammadon; Febriyan , Febriyan
Jurnal JEETech Vol. 4 No. 2 (2023): Nomor 2 November
Publisher : Universitas Darul Ulum

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (402.359 KB) | DOI: 10.32492/jeetech.v4i2.4205

Abstract

Fakfak Regency, West Papua Province has several rivers and waterfalls that have the potential to produce electrical energy. One of the areas in Fakfak Regency that has abundant water resource potential is Kayuni District, Fakfak Regency. So far, the use of this river and waterfall has been as a water source for villagers in Kayuni District and as one of the main tourist destinations in Fakfak Regency. Through this research, it is hoped that this resource can be developed for other potentials, one of which is for Micro Hydro Power Plants (PLTMH). Research is carried out by conducting surveys and direct measurements where the results of the measurements will be calculated to determine the potential for river flow discharge and potential for electricity generation. The results of measurements and calculations showed that the average flow of the Ubadari river was 4,674 m3/second, the effective fall height (Heff) of the flow was 4 m. With these results, it is estimated that the electrical power produced will be 111,402 kW.
Pengaruh Penambahan Transformator Sisip pada Trafo Distribusi 200 kVA Kayu Merah Kabupaten Fakfak Yulianto La Elo; Lembang, Naomi; Tianotak, Siti
Jurnal JEETech Vol. 5 No. 2 (2024): Nomor 2 November
Publisher : Universitas Darul Ulum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32492/jeetech.v5i2.5203

Abstract

Permasalahan ketenagalistrikan di Kabupaten Fakfak bukan hanya terjadi oleh akibat terbatasnya pasokan listrik yang disalurkan oleh PLN, namun juga terjadi akibat proses distribusi listrik ke Masyarakat. Salah satu masalah yang seringkali terjadi adalah presentasi penggunaan tranformator yang telah melebihi dari ketentuan PLN yang mana pembebanan normal transformator adalah 60 % - 80%. Penyulang Danaweria merupakan salah satu penyulang yang seringkali mendapat keluhan dari konsumen Listrik PLN di Kabupaten Fakfak dimana sampai mengakibatkan terjadinya pemadaman listrik oleh PLN. Jika hal ini terus dibiarkan, maka tentu akan mengakibatkan kerusakan pada gardu distribusi yang akan merugikan pihak PLN sebagai penyedia  dan masyarakat sebagai konsumen listrik. Melalui pemasangan transformator sisipan, diharapkan dapat mengurangi beban pada gardu distribusi dengan memindahkan beban ke gardu sisipan. Dalam penelitian ini akan mengkaji terkait pemasangan transformator sisipan untuk mengurangi beban pada gardu distribusi FFK 058, 200kVA Penyulang Danaweria di PT. PLN (Persero) ULP Fakfak, dengan memindahkan sebagian beban ke transformator sisipan 100 kVA. Setelah pemasangan trafo sisipan, beban puncak siang hari dari trafo FFK 058, 200 kVA diperoleh presentase pembebanan sebesar 35,4% dari sebelumnya sebesar 61,07%. Sedangkan pada malam hari, presentase pembebanan sebesar 55,7 % dari sebelumnya 98,23%.  Hasil tersebut menunjukan presentasi pembebanan dalam keadaan normal sesuai ketentuan PLN
Frekuensi Gangguan dan Energi Tak Tersalurkan Sebagai Indikator keandalan Sistem Jaringan Tegangan Menengah Rusliadi, Rusliadi; La Elo, Yulianto
Jurnal JEETech Vol. 5 No. 2 (2024): Nomor 2 November
Publisher : Universitas Darul Ulum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32492/jeetech.v5i2.5208

Abstract

The increasing need for electrical energy must be balanced with improved customer service. Customers will feel comfortable if they can enjoy an uninterrupted electricity supply in the form of a disconnection of the electricity supply for a certain period of time or what is commonly called the ENS (Energy Not Supplied) index and the AENS (Average Energy Not Supplied) index. The reliability of the electric power system is one of the things that is very important in order to maintain the performance of the three main pillars of PT. PLN (Persero). A reliable distribution network can be seen from the number of disruptions that often occur in the distribution network. Disruptions that arise in the distribution network arise due to internal factors such as less reliable distribution network components. In addition, it can also be caused by external factors such as natural disasters or the influence of trees and animals. Based on the results of the research that has been conducted, it is known that the occurrence of disruptions and the length of the duration of the disruption cause the Energy Not Supplied (ENS) value to increase as in April and July, the high duration of the blackout also makes the ENS higher, namely 792.857804 kW and 789.046811 kW. However, the distribution network at the Wagom feeder is still considered reliable in distributing electrical energy based on the SAIDI and SAIFI indices. From the research results, the SAIDI index at the Wagom feeder reached 8.96 hours/customer/year. While the SAIFI index at the Wagom feeder reached 2.08 times/customer/year.