Claim Missing Document
Check
Articles

Found 12 Documents
Search

Faktor-Faktor yang Mempengaruhi Tingkat Akurasi Perkiraan Biaya pada Tahap Konstruksi Gedung di Pemerintahan Kota Sungai Penuh Wahyudi, Boyke Heri; Peli, Martalius; Zaitul, Zaitul
Jurnal Talenta Sipil Vol 8, No 2 (2025): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v8i2.884

Abstract

Inaccurate cost estimates in building construction projects are often a source of budget overruns that disrupt project efficiency, including in the Sungai Penuh City Government. Several projects, such as the construction of a community health center, PSC building, and health laboratory, show significant deviations between the planned budget and actual costs. This study aims to identify the main factors influencing the accuracy of cost estimates, determine the dominant factors at play, and analyze the combined impact of these factors on the overall quality of cost estimation. The method used is a quantitative approach through the distribution of questionnaires to parties involved in the project, including the Project Implementation Unit (PPK), contractors, consultants, and technical teams. Data analysis was conducted using Confirmatory Factor Analysis (CFA) and multiple linear regression with the assistance of SPSS 22. The results of the study revealed three significant main groups of factors, namely estimator competence, information availability, and cost estimation calculation quality. Among the three, estimator competence was the most dominant factor. The research instrument was found to be valid and reliable with KMO values > 0.5 and Cronbach’s Alpha > 0.6. The conclusions of this study emphasize the importance of enhancing estimator capacity through continuous training, providing accurate cost databases, and standardizing estimation procedures. These efforts are expected to promote budget efficiency and improve the overall success of government construction projects.
ESTIMASI BIAYA PROYEK KONSTRUKSI GEDUNG OLEH QUANTITY SURVEYOR (STUDI KASUS: PEKERJAAN STRUKTUR ATAS PROYEK APARTEMENT THE ACCENT JAKARTA) Ariani, Vivi; Peli, Martalius; Fitri, Dinni Fadhilah
JURNAL TEKNIK SIPIL Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v7i2.10078

Abstract

Abstract : Cost Estimating of the upper structure on each construction project is usually done by the civil engineer or architect. However, as the development of science, new professions such as Quantity Surveyor have shifted the task of civil engineering or architects in making cost estimates. The QS profession is a profession that has the ability to analyze the cost and practical components of theproject's physical construction work in a successful way so as to apply its analytical results in solving the problems typical for each project. The case study of this research is the top structural work on the accent Apartments built on an area of 3,300 m2 with a building area of 27,000 m2. Research methodology by literature study and The Accent volume calculation using standard measurement method (SMM), while for unit price partly taken from the reference of PU Permen 2007. From the analysis of volume calculation and unit price analysis, the total cost of the structural work top of Rp. 51,162,851,482.23 with the price per m2 is 2.084,412.47 / m2. Duration of implementation is for 16 months. For cash flow, cash in consists of a 10% down payment, 5% retention, monthly employment progress minus downpayment and retention, and an office cash loan of Rp.6,000,000,000.00 in which the cash is Rp.2,000,000,000.00 per month.Keywords : cost estimating, quantity surveyor, volume, upper structure, ApartementAbstrak: Estimasi biaya pekerjaan struktur atas pada setiap proyek konstruksi biasanya dilakukan oleh civil engineer atau arsitek. Namun, seiring berkembangnya ilmu pengetahuan, profesi baru seperti Quantity Surveyor telah menggeser tugas civil engineering atau arsitek dalam melakukan estimasi biaya. Studi kasus penelitian ini adalah pekerjaan struktur atas pada Apartemen The Accent yang dibangun pada lahan seluas 3.300 m2 dengan luas bangunan 27.000 m2. Metodologi penelitian dilakukan dengan cara studi literatur dan melakukan perhitungan volume menggunakan standar measurement method (SMM), sedangkan untuk harga satuannya sebagian diambil dari acuan Permen PU 45/PRT/M/2007. Dari hasil analisa perhitungan didapat total biaya keseluruhan pekerjaan struktur atas sebesar Rp. 51,162,851,482.23 dengan harga per m2 nya adalah 2,084,412.47/m2. Durasi pelaksanaan adalah selama 16 bulan. Untuk cash flow, cash in terdiri atas uang muka sebesar 10%, retensi sebesar 5%, progress pekerjaan bulanan dikurangi uang muka dan retensi, dan peminjaman kas kantor sebanyak Rp.6,000,000,000.00 yang mana cairnya dana adalah sebesar Rp.2,000,000,000.00 per bulannya.Kata kunci : Estimasi biaya, Quantity Surveyor, Volume, Struktur atas, Apartemen