Claim Missing Document
Check
Articles

ANALISA TEBAL PERKERASAN LENTUR PADA RENCANA PENINGKATAN JALAN RUAS LEGUNDI – PERTIGAAN BUNDER Fandra Andriansyah P; Sigit Winarto; Yosef Cahyo Setianto Poernomo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (252.462 KB) | DOI: 10.30737/jurmateks.v2i2.541

Abstract

The final project is Analysis of Flexible Pavement Thickness in the Plan for Improvement of Legundi Road Section - Bunder KM.5 + 700 to 13 + 700 STA. 0 + 000 to 4 + 000which comprised the road geometrics, flexible pavement depth completed with the budgeting. A topographic map was employed to make a geometric design. Traffic data of 2018, rainfall data of 2018, and California Bearing Ratio (CBR) data were needed to design the flexible pavement depth. The basic itemized cost of wages, materials, tools, and work itemized cost from General Work BinaMarga of East Java Province Division IV (Surabaya, Gresik, Sidoarjo, Mojokerto, Jombang) were needed to find out the budget. Chosen alternative flexible pavement depth of 10 cm asphalt-concrete MS 744 surface, 20 cm Cement Tread Base (CTB) base, and 50 cm sand-aggregate class A (CBR 70) sub-base.The calculations result in PI 01 Full-Circle bend and PI 02 Full-Circle; at IDR 14.745.341.000.Laporan Akhir ini adalah Analisa Tebal Perkerasan Lentur Pada Rencana Peningkatan Jalan Ruas Legundi – Pertigaan Bunder KM.5+700 s/d 13+700 STA. 0+000 s/d 4+000 yang bertujuan untuk menghitung tebal perkerasan lentur jalan, menghitung geometric jalan dan rencana anggaran biaya proyek. Peta topografi sebagai dasar untuk merencanakan geometric jalan. Data lalu lintas tahun 2018, data curah hujan tahun 2018, data California Bearing Ratio (CBR) untuk merencanakan tebal perkerasan lenturjalan. Data Harga Satuan Dasar upah, bahan, dan alat serta Harga Satuan Pekerjaan dari Departemen Pekerjaan Umum Bina Marga Jatim kelompok IV (Surabaya, Gresik, Sidoarjo, Mojokerto, Jombang) digunakan untuk perhitungan Rencana Anggaran Biaya. Berdasarkan perhitungan didapatkan tebal perkerasan lentur alternative terpilih untuk surface 10cm laston MS 744, base 20 cm Cement Tread Base (CTB) ,serta sub base 50 cm Sirtukelas A (CBR 70). Bentuktikungan PI 01 Full-Circle, dan PI 02 Full-Circle. Biaya yang diperlukanadalahsebesarRp 14.745.341.000,-.
PERENCANAAN PONDASI TIANG (Studi Kasus HOTEL MERDEKA TULUNGAGUNG) Rohmat Ilyas Kurniawan; Ahmad Ridwan; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (612.527 KB) | DOI: 10.30737/jurmateks.v2i1.406

Abstract

The foundation is a construction at the base of the building, which functions to transmit the load from the top of the building structure to the soil layer at the bottom. The pile type foundation is a foundation that is often planned in such conditions. Therefore it is necessary to calculate incorrectly in foundation planning. The method used is the method of description and observation. From the calculation results, the optimal foundation is obtained using a diameter of 40 cm with screw reinforcement D16 distance 125 with the content of 5 reinforcement. When calculating piles, it is better to use pile group control and lateral force control so that the planned foundation construction is able to support the planned load.Pondasi merupakan suatu konstruksi pada bagian dasar bangunan yang berfungsi meneruskan beban dari bagian atas struktur bangunan ke lapisan tanah yang berada di bagian bawahnya Pondasi jenis tiang merupakan pondasi yang sering kali direncakan pada kondisi yang demikian, maka dari itu perlu perhitungan yang tidak tepat pada perencanaan pondasi, metode yang digunakan ialah metode penjabaran dan pengamatan Dari hasil perhitungan, didapat pondasi yang optimal mengunakan diameter 40 cm dengan tulangan besi ulir D16 jarak 125 dengan isi 5 tulangan. Jika menghitung tiang pancang lebih baik menggunakan kontrol kelompok tiang serta kontrol gaya lateral agar konstruksi pondasi yang direncanakan mampu mundukung beban yang yang di rencanakan.
ANALISA KELAYAKAN SIMPANG EMPAT TAK BERSINYAL MENGGUNAKAN MANUAL KAPASITAS JALAN INDONESIA Sugeng Yani Widodo; Yosef Cahyo; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (257.796 KB) | DOI: 10.30737/jurmateks.v3i1.900

Abstract

The transportation problem is one of the main issues that are difficult to solve in several big cities. When congestion occurs, it can disrupt community activities. We already know that "congestion will cause various negative impacts, both on the driver and in terms of the economy and environment. The intersection of four highways, Blitar City, East Java, has the intensity of a dependable vehicle. This is because around the area, and there are markets, residential areas, public force terminals, and squares. Besides that, the place is accessible to public transportation from Blitar City to Malang City. In this study, the authors conducted a field survey of traffic flow, road geometry, and side barriers during rush hour during sunny weather for seven days at the intersection. From the results of the analysis, minor paths have disrupted major pathways and caused delays of 35%. This figure has exceeded the requirements recommended by MKJI 1997. From the results of this study, it can also be an evaluation material so that in the future, the intersection of four Highway, Blitar City, East Java, can be functioned better.Masalah transportasi adalah salah satu masalah utama yang tidak mudah dipecahkan di beberapa kota besar. Pada saat kemacetan terjadi bisa menggangu aktifitas masyarakat. Telah kita ketahui, bahwa kemacetan akan menimbulkan berbagai dampak negatif, baik terhadap pengemudi maupun ditinjau dari segi ekonomi dan lingkungan. Simpang empat Jl. Raya Barat, Kota Blitar, Jawa Timur merupakan salah satu persimpangan dengan intensitas kendaraan yang cukup padat. Hal ini disebabkan karena disekitar simpang empat tersebut terdapat pasar, pemukiman penduduk, terminal angkot, alun – alun. Selain itu, simpang empat tersebut merupakan akses untuk angkutan umum dari Kota Blitar menuju Kota Malang. Pada penelitian ini penulis melakukan survey lapangan terhadap arus lalulintas, geometri jalan, dan hambatan samping pada jam sibuk saat cuaca cerah selama 7 hari pada simpang empat tersebut. Dari hasil analisa, jalur minor sudah mengganggu jalur mayor dan menyebabkan tundaan sebesar 35%. Angka ini sudah melampaui syarat yang dianjurkan oleh MKJI 1997. Dari hasil penelitian ini juga dapat menjadi bahan evaluasi agar kedepannya simpang empat Jl. Raya Barat, Kota Blitar, Jawa Timur, bisa difungsikan dengan lebih baik.
ANALISA KINERJA SIMPANG TAK BERSINYAL JALAN SIMPANG BRANGGAHAN NGADILUWIH KABUPATEN KEDIRI Aditiya Yayang Nurkafi; Yosef Cahyo; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1170.337 KB) | DOI: 10.30737/jurmateks.v2i1.408

Abstract

The development of transportation in the Kediri Regency has an impact on increasing people's daily activities in the transportation sector. So far, the Branggahan Ngadiluwih road section at the crossroads leading to the connecting bridge between Ngadiluwih sub-district and Mojo sub-district, at certain hours, there is often traffic activity due to road performance, which plays an important role in transportation activities. This study aims to determine: the value of capacity (C), degree of saturation (DS), the queue of opportunity (QP), and the value of traffic delay (DT) at the intersection. The method used is data collection based on the MKJI 1997. Based on the results of research and discussion of the performance of the Branggahan Ngadiluwih intersection, the value of the queuing opportunity is between 52.287% - 105.135%, the average value of the delay in traffic exceeds 15 sec / SMP, the value of degrees saturation exceeds the standard, namely 1.136. To reduce the delay that occurs at the intersection. That exceeds the maximum value (> 15 sec / SMP), it is necessary to install a parking restriction and stop at an approach where there is no shoulder for parking, and a traffic light is needed.Perkembangan transportasi dikabupaten kediri berdampak pada meningkatnya aktivitas keseharian masyarakat di bidang transportasi. Sejauh ini pada ruas jalan branggahan ngadiluwih di simpang jalan menuju jembatan penghubung antara kecamatan ngadiluwih dengan kecamatan mojo pada jam tertentu sering terjadi kesibukan lalu lintas karena kinerja jalan yang menjadi peranan penting dalam kegiatan transportasi. Penelitian ini bertujuan  mengetahui: nilai kapasitas (C), derajat kejenuhan (DS), antrian peluang (QP) serta nilai tundaan lalu lintas (DT) pada persimpangan tersebut. Metode yang digunakan adalah pengumpulan data yang berpedoman pada MKJI 1997. Berdasarkan hasil penelitian dan pembahasan kinerja simpang Branggahan Ngadiluwih memiliki nilai peluang antrian disimpang tersebut antara 52,287% - 105,135%, nilai tundaan pada lalu lintas rata-rata melebihi 15 det/smp, nilai derajat kejenuhan melebihi standart yaitu 1,136. Untuk menurunkan tundaan pada simpang yang melebihi nilai maksimum (>15 det/smp) besarnya perlu dipasang larangan parkir dan berhenti di pendekat yang tidak tersedia bahu untuk parkir serta perlu pemasangan lampu lalu lintas (Traffic Light).
STUDI EXPERIMEN KUAT TEKAN BETON DENGAN MEMANFAATKAN LIMBAH KERAMIK DAN BATA MERAH Satria Febby Romaadhoni; Ahmad Ridwan; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (557.699 KB) | DOI: 10.30737/jurmateks.v2i1.394

Abstract

Normal concrete sample (1) has a compressive strength of 222.22 kg/cm, normal concrete (2) has a compressive strength of 242.933 kg/cm, concrete using a mixture of ceramic 21% and red brick 7% sample (1) has a compressive strength of 177.911 kg/cm, concrete using a mixture of 21% Ceramics and red brick 7% sample (2) has a compressive strength of 189.777 kg/cm, concrete using a mixture of 10% Ceramics and red brick 4% sample (1) has a compressive strength of 204.667 kg/cm, concrete which uses a mixture of 10% Ceramics and red brick 4% sample (2) has a compressive strength of 137,333 kg/cm. It shows that the compressive strength of concrete decreases from increasing the volume of ceramics because the ceramic surface cannot bind perfectly. The highest K-204,667 with a mixture of 10% ceramics and 4% red brick and 28-day-old concrete, while to reach the K-250, is very far away. Of the 6 samples, the average reached K-195,807.Sampel beton normal (1) memiliki kuat tekan 222,22 kg / cm, beton normal (2) memiliki kuat tekan 242.933 kg / cm, sampel beton menggunakan campuran keramik 21% dan bata merah sampel 7% (1) memiliki kuat tekan 177.911 kg / cm, sampel beton menggunakan campuran keramik 21% dan bata merah 7% (2) memiliki kuat tekan 189.777 kg / cm, sampel beton campuran 10% Keramik dan bata merah 4% (1) kuat tekan 204.667 kg / cm, sampel beton yang menggunakan campuran Keramik 10% dan sampel bata merah 4% (2) memiliki kuat tekan 137.333 kg / cm. Ini menunjukkan bahwa Kuat tekan beton semakin berkurang dari bertambahnya volume keramik, karena permukaan keramik tidak bisa mengikat dengan sempurna. K-204.667 tertinggi dengan campuran 10% keramik dan 4% bata merah serta beton berumur 28 hari, sedangkan untuk mencapai K-250 sangat jauh jauh. Dari 6 sampel tersebut rata-rata mencapai K-195.807.
PERENCANAAN PONDASI TIANG PANCANG GEDUNG PASCA SARJANA FAKULTAS TEKNIK UNIVERSITAS KADIRI Rizaludin Rizaludin; Sigit Winarto; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (296.033 KB) | DOI: 10.30737/jurmateks.v3i1.889

Abstract

The foundation is a part of the structure that functions as a support for the building and distributes the burden on it (upper fabric) or the soil layer with a stable enough carrying capacity. In planning the foundation for a structure can use several types. The selection of the foundation to be used based on the weight of the building. The construction of the C story building seven-story University requires a strong foundation. The pile foundation was chosen because it was relatively fast, easy, and yielded hard soil at 5.6 m. In this calculation, three methods as a Trofimankove method and the Meyerhoff method and the General Method Method. Pile foundation planning has a planned load of Qu 231 Ton. The calculation of the three ways obtained more efficient results, namely the count with a Meyerhoff method equal to 82.21. The number of single piles that are close to one pile cap is four poles, so the calculation formula of the Pall piles group is 232.82 tons. Thus it can be concluded that Pmax <Pall 231 Ton <232.82 Ton, which means that it meets the requirements.Pondasi adalah bagian struktur yang berfungsi sebagai penopang bangunan dan menyalurkan beban diatasnya (upper structure) atau lapisan tanah yang memiliki daya dukung yang cukup kuat . Dalam merencanakan pondasi untuk suatu struktur dapat menggunakan beberapa macam tipe pondasi. Pemilihan pondasi berdasarkan fungsi bangunan atas yang akan dipikul oleh pondasi tersebut, berdasarkan beban dan beratnya bangunan atas kedalaman tanah dimana bangunan tersebut didirikan. Pembangunan gedung C berlantai 7 Universitas Kadiri memerlukan pondasi yang kuat. Pondasi tiang pancang dipilih karena pekerjaan relatif cepat, mudah dan hasil sondir tanah keras pada 5,6 m. Pada perhitungan ini digunakan tiga metode yaitu metode Trofimankove dan metode mayerhoff serta Metode cara Umum. Perencanaan pondasi tiang pancang memiliki beban rencana sebesar Qu 231 Ton. Dari perhitungan ketiga metode didapat hasil yang lebih efisien yaitu pada perhitungan dengaan metode mayerhoff yaitu sebesar 82,21. Jumlah tiang tunggal yang mendekati pada satu pile cap adalah 4 tiang, sehingga diperoleh dari rumus perhitungan Pall tiang kelompok 232,82 Ton. Dengan demikian dapat disimpulkan Pmaks < Pall 231 Ton < 232,82 Ton, yang artinya memenuhi syarat.
ANALISA PRODUKTIFITAS ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS SYARIAH DAN ILMU HUKUM IAIN TULUNGANGUNG Aprilia Kaprina; Sigit Winarto; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 1 (2018): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (268.4 KB) | DOI: 10.30737/jurmateks.v1i1.136

Abstract

Heavy equipment is an essential factor in large-scale construction projects. Heavy equipment used in civil engineering is a tool used to assist humans in carrying out development work, and the analysis of the productivity of heavy equipment is calculated so that its use is more efficient in terms of time and operational costs. This project functions as a building for lecture activities, and the land has a total building area of 22,983 m 2. The types of heavy equipment used for earthwork and structural work are excavators, dump trucks, and tower cranes. Based on the results of the calculation of the heavy equipment productivity analysis, which includes earthworks and tower crane work structures, it is obtained the results of research on heavy equipment that are precise, short time. It can be used so that all heavy equipment can work optimally. Of the several combinations, Combination III is the most effective and time-efficient in completing excavation, stockpiling, and tower crane work structures, namely 2 Excavator units, 4 Dumptruck, and 1 Tower Crane. The time needed to do this job is 251.52 hours, with a heavy equipment cost of IDR 276,422,572.00 and the amount of human resource analysis of IDR 9,555,249,830.00. Alat berat merupakan faktor penting di dalam proyek konstruksi berskala besar. Alat berat yang digunakan dalam ilmu teknik sipil adalah alat yang digunakan untuk membantu manusia dalam melakukan pekerjaan pembangunan dan diperhitungkan analisa produktifitas alat berat agar penggunaannya lebih efisiensi dari segi waktu dan biaya operasionalnya. Proyek ini berfungsi sebagai bangunan tempat untuk aktifitas perkuliahan dan tanah memiliki luas total bangunan sebesar 22.983 m 2 . Jenis alat berat yang digunakan untuk pekerjaan tanah dan pekerjaan struktur ialah Excavator, Dumptruck, dan Tower Crane. Berdasarkan hasil perhitungan analisa produktifitas alat berat yang meliputi pekerjaan pekerjaan tanah dan pekerjaan struktur kerja tower crane diperoleh hasil penelitian alat berat yang tepat, waktu yang singkat dan dapat digunakan agar seluruh alat berat dapat bekerja optimal. Dari beberapa kombinasi, di Kombinasi III yang paling efektif dan efisien waktu pelaksanaannya dalam menyelesaikan pekerjaan galian, timbunan dan pekerjaan struktur kerja tower crane yaitu 2 unit Excavator, 4 Dumptruck, dan 1 Tower Crane. Waktu yang dibutuhkan untuk melakukan pekerjaan tersebut adalah 251,52 jam dengan biaya alat berat sebesar Rp 276.422.572,00 dan jumlah analisa sumber daya manusia sebesar Rp 9.555.249.830,00.
PEMANFAATAN LIMBAH GYPSUM BOARD DAN BATU BATA MERAH UNTUK SUBSTITUSI SEMEN PADA PEMBUATAN BETON Didik Hadi Prayogo; Ahmad Ridwan; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (201.112 KB) | DOI: 10.30737/jurmateks.v2i2.542

Abstract

Concrete is one of the most vital building blocks, from columns, bricks, paving to roads made of concrete, so the use of concrete tends to be high. Concrete is often used as the main buffer in a building, so good quality is needed, but this is not accompanied by a declining quality of the material, so it requires innovation in the addition of new materials that can at least reduce the needs of the main material for making concrete, one of which is the utilization of Gypsum Board waste and red brick waste. The results of testing the concrete compressive strength test with the addition of Gypsum Board waste and red brick waste to cement obtained pretty good results. Concrete, which has the highest average compressive strength than normal concrete, has concrete with a mixture of red brick and gypsum waste of 10% each with a compressive strength of 250.56 kg / cm², and which has the lowest compressive strength have concrete with a mixture of red bricks and gypsum waste 15% each with a compressive strength of 195.56 kg / cm².Beton merupakan salah satu unsur penyusun bangunan paling vital mulai dari kolom,bata, paving hingga jalan terbuat dari beton sehingga penggunaan beton cenderung tinggi. Beton sering digunakan sebagai bahan penyangga utama pada suatu bangunan maka diperlukan kualitas yang baik, namun hal tersebut tidak di sertai dengan kualitas bahan yang kian menurun,makadiperlukan inovasi penambahan bahan baru yang setidaknya dapat mengurangi kebutuhan bahan utama pembuat beton, salah satunya pemanfaatan limbah Gypsum Board dan limbah batu bata merah Hasil dari pengetesan uji kuat tekan beton dengan penambahan limbah Gypsum Board dan limbah batu bata merah terhadap semen didapatkanhasil yang cukup bagus Beton yang memiliki nilai kuat tekan rata-rata paling tinggi selain beton normal di miliki beton dengan campuran batu bata merah dan limbah gypsum masing-masing 10% dengan nilai kuat tekan sebesar 250,56 Kg/cm²,dan yang memiliki nilai kuat tekan paling rendah di miliki beton dengan campuran batu bata merah dan limbah gypsum masing-masing 15% dengan nilai kuat tekan 195,56 Kg/cm².
MANAJEMEN REKAYASA LALU LINTAS PENGEMBANGAN WISATA KAMPUNG COKLAT Edi Hardi Suntoyo; Ahmad Ridwan; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (251.572 KB) | DOI: 10.30737/jurmateks.v2i1.389

Abstract

Responding to the development of the brown village tourist area in Golodok Blorok Kademnagan Blitar, it will cause seizures that have an impact on decreasing the performance of roads and intersections around the area, and cause a high level of accidents. can minimize the decline in the performance of roads and intersections and reduce or minimize the occurrence of accidents of visitors to the brown village area, and can provide solutions to traffic problems that occur due to the development of brown village tourism. The method used in this research is based on the Indonesian Road Capacity Manual (MKJI 1997) and other related regulations. This reliable step begins with conducting a traffic survey in the area that has been determined and asks for data on the number of visitors and the number of vehicles parked for 1 year to the manager of the Brown Village tourist area which then estimates the trip generation and sets the andalalin classification. After that, analyze the traffic performance on existing conditions and analyze the conditions of traffic management without and with regional development, as well as develop alternative improvements to the impact of traffic due to the development of the brown village tourist area.Menyikapi berkembangnya kawasan wisata kampung coklat di jl Golodok Blorok Kademnagan Blitar , akan menimbulkan bangkitan yang berdampak pada penurunan kinerja ruas jalan dan simpang di sekitar kawasan tersebut, serta menimbulkan tingkat kecelakaan yang tinggi, Untuk itu perlu di lakukan Analisis Dampak Lalu Lintas (Andalalin) agar dapat meminimalisir penurunan kinerja ruas jalan dan simpangdanmengurangiatauminimalisirterjadinyakecelakaanpengunjungkawasan kampong coklat, serta dapat memberikan solusi pemecahan masalah lalu lintas yang terjadi akibat pengembangan wisata kampung coklat. Metode yang digunakan pada penelitia ini didasarkan pada Manual Kapasitas Jalan Indonesia (MKJI 1997) dan peraturan terkait lainya.Tahapan andalalin ini diawali dengan melakukan survei lalu lintas di area yang sudah di tentukan dan meminta data jumlah pengunjung serta jumlah kendaraan yang parkir selama 1 tahun kepada pengelola Kawasan wisata kampong coklat yang selanjutnya memperkirakan bangkitan perjalanan dan menetapkan klasifikasi andalalin. Setelah itu , menganalisa kinerja lalu lintas pada kondisi eksisting dan menganalisa pada kondisi manajemen  lalu lintas tanpa dan dengan pengembangan kawasan , serta menyusun alternatif perbaikan terhadap dampak lalu lintas akibat pengembangan kawasan wisata kampung coklat tersebut.
ANALISIS KINERJA LALU LINTAS DI JALAN SEKITAR HYPERMART JL.VETERAN,PENANGGUNGAN, KLOJEN, MALANG Savira Anggraeni; Yosef Cahyo Setianto Poernomo; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (228.798 KB) | DOI: 10.30737/jurmateks.v2i2.526

Abstract

This research was conducted to determine the peak traffic volume, road capacity, degree of saturation, analyze traffic performance, find out the prediction of the next 5 years, and to evaluate the traffic performance around the Hypermart shopping center that occurs in the real situation. The method used is by library research, looking for references from previous research and direct observation. The peak traffic volume is 1469 SMP / hour for the first location and 1104.4 SMP / hour for the second location. The capacity of the road section is 4699.73 SMP / hour. For the analysis of the degree of saturation of the first location of 0.31 SMP / hour and 0.23 SMP / hour in the second location. For the next 5 years prediction in that region, it is predicted to increase by 8.93% so that the volume of vehicles will rise to 2124.76 SMP / hour, and for the degree of saturation of 0.45, which means that the traffic service in this region is included in class C in 2024.Penelitian ini dilaksanakan untuk mengetahui volume puncak lalu lintas, kapasitas jalan,derajat kejenuhan,  menganalisis kinerja lalu lintas, mengetahui prediksi 5 tahun ke depan serta untuk mengevaluasi kinerja lalu lintas di sekitar pusat perbelanjaan Hypermart yang terjadi disituasi rill. Metode yang digunakan adalah dengan cara studi pustaka, mencari referensi dari penelitian terdahulu serta melakukan observasi langsung. Volume puncak lalu lintas didapatkan nilai 1469 smp/jam untuk lokasi pertama dan 1104.4 smp/jam untuk lokasi kedua.Kapasitas ruas jalan sebesar 4699.73 smp/jam.Untuk analisa derajat kejenuhan lokasi pertama sebesar 0.31 smp/jam dan 0.23 smp/jam pada lokasi kedua.Untuk prediksi 5 tahun kedepan pada wilayah tersebut diprediksi akan mengalami kenaikan sebesar 8.93% sehingga volume kendaraan akan naik menjadi 2124.76 smp/jam, dan untuk nilai derajat kejenuhan sebesar 0.45 yang artinya pelayanan lalu lintas wilayah ini termasuk ke dalam kelas C pada tahun 2024.