Claim Missing Document
Check
Articles

Found 13 Documents
Search

Rancang Bangun Alat Penumbuk Adonan Guna Meningkatkan Efisiensi Produksi Dan Higienis Pada Produk Biskuit Dengan Pendekatan Ergonomi Dan Kelayakan Investasi Armadani, Handhika Mahindra; Purnama, Jaka; Yuwono, Istantyo
Industrika : Jurnal Ilmiah Teknik Industri Vol. 9 No. 1 (2025): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/indstrk.v9i1.1940

Abstract

  UMKM Banjar Biscuit "Bu Min" in Sumber Nongko Village, Jombang Regency produces traditional snacks made from sticky rice using manual methods, especially at the dough-pounding stage. This manual process causes physical fatigue in workers, affects production efficiency, and threatens product hygiene. With increasing market demand, UMKM faces major challenges in meeting consumer needs. To overcome this problem, an ergonomic dough-pounding tool was designed with dimensions of 140 cm high, 50 cm wide, 50 cm long, and a mortar diameter of 30 cm. This tool successfully reduced the Work Heart Rate (WHR) of workers from 118-149 to 93-124 beats/minute, indicating a significant reduction in cardiovascular load. In addition to increasing production efficiency, this tool maintains product hygiene and reduces the risk of worker injury. From a financial perspective, the cost of making the tool of Rp 5,306,000 has proven to be economical with an IRR of 5.26% per month (51.2% per year), a Profitability Index of 6.04, a positive NPV, and a Payback Period of only 2 months. This innovation helps MSMEs improve the quality and quantity of production while strengthening competitiveness in a competitive market. Keywords: Anthropometry, Cardiovascular Load, Engineering Economics
Rencana Keputusan Investasi Truk dengan Metode Capital Budgeting untuk Efisiensi Biaya Operasional: Studi Kasus PT. XYZ Dafa Rabbani, Raihan; Herlina, Herlina; Yuwono, Istantyo
JURNAL SURYA TEKNIKA Vol. 12 No. 1 (2025): JURNAL SURYA TEKNIKA
Publisher : Fakultas Teknik UMRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37859/jst.v12i1.9365

Abstract

PT. XYZ has problems in supplying large amounts of activated carbon to large companies; so far the company still relies on third-party expedition services to rent trailer trucks for its deliveries. To address this issue, we conducted an investment feasibility analysis using the capital budgeting method for truck procurement. The results of the analysis show that investment in the UD Quester GDE280 Euro 5 truck is feasible. The payback period (PP) was recorded at 3.91 months, the net present value (NPV) was Rp9,581,482,520, and the internal rate of return (IRR) reached 40.66%, far exceeding the minimum attractive rate of return (MARR) of 8.53%. The Profitability Index (PI) was also positive at 13.28%, and operational cost efficiency showed potential savings of 33.31%. Based on these indicators, the investment in truck procurement is not only financially feasible but also able to significantly increase the company's operational efficiency.
Pengukuran Waktu Kerja untuk Menentukan Jumlah Tenaga Kerja Optimal pada Pembuatan Neon Box: Studi Kasus: CV. Wibisono Kreatif Media Yunizar Arfiansyah, Muhammad; Herlina, Herlina; Yuwono, Istantyo
JURNAL SURYA TEKNIKA Vol. 12 No. 1 (2025): JURNAL SURYA TEKNIKA
Publisher : Fakultas Teknik UMRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37859/jst.v12i1.9366

Abstract

CV Wibisono Kreatif Media is a company engaged in the advertising industry (media advertising), construction, and general printing. CV. Wibisono Kreatif Media produces various products, ranging from neon boxes, flexible neon, embossed letters, sign boards, pylon totems, banner printing, sticker printing, and many more. CV Wibisono Kreatif Media also serves shipping and installation to all regions in Indonesia. The problem that arose was the production of CV Wibisono Kreatif Media neon boxes that did not meet the production target. Using the Time Study and Workload Analysis approach, the results showed the need for an efficient number of workers, which is only 5 workers; there will be 1 worker for the cutting operator, the number of workers for the lamp installation operator decreased from 2 to 1, the assembly operator for the neon box also reduced from 2 workers to 1 worker, then the framework making operator decreased from 2 workers to 1 worker, and finally, the sticker installation and finishing operator remains at 1 worker.