ANALISIS PERBANDINGAN PRODUKTIVITAS PRODUKSI BETON READYMIX METODE WETMIX DAN DRYMIX Sunarto Suryanto; Sugiharti Sugiharti; fauzi Akbar Rahmawan
Prokons: Jurnal Teknik Sipil Vol. 13 No. 2 August 2019
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v13i2.192

Abstract

Terdapat dua metode produksi beton readymix yang digunakan saat ini yaitu wetmix dan drymix. Pencampuran wetmix merupakan metode pencampuran beton yang memiliki produktivitas yang lebih tinggi dibandingkan drymix. Tingginya produktivitas tipe wetmix dikarenakan pan pengaduk pada pencampuran wetmix memiliki putaran mixing yang lebih cepat dari pada tipe drymix sehingga durasi pengadukan lebih cepat. Adapun perbaikan yang dapat dilakukan untuk meningkatkan produktivitas produksi beton readymix adalah dengan merubah bentuk batching plant serta memperbesar kapasitas hooper agregat agar dapat mengurangi waktu tunggu alat lain pada operasi penggunaan loader, sebab produksi beton pada aktivitas produksi berasal dari penggunaan loader untuk transportasi agregat. 
Bimbingan Teknis Pengadaan Desain dan Rencana Anggaran Biaya TPQ Pasir Putih Kota Malang: Bimbingan Teknis Pengadaan Desain dan Rencana Anggaran Biaya TPQ Pasir Putih Kota Malang Sumardi; Fauzi Akbar Rahmawan; Indah Ria Riskiyah; Utami Retno Pudjowati
Jurnal Pengabdian Polinema Kepada Masyarakat Vol. 8 No. 2 (2021): Jurnal Pengabdian Polinema Kepada Masyarakat
Publisher : UPT Penelitian dan Pengabdian Kepada Masyarakat Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jppkm.v8i2.78

Abstract

Taman Pendidikan Al-quran (TPQ) Pasir Putih yang berlokasi di Jl. Pasir putih kota Malang merupakan salah satu fasilitas pendidikan nonformal untuk anak-anak yang memiliki peran penting bagi pengembangan pendidikan agama Islam bagi anak. Sebagai fasilitas pendidikan nonprofit yang dibiayai secara sukarela, maka perawatan dan pembangunan membutuhkan bantuan donatur atau masyarakat sekitar dalam prosesnya. Sehingga permasalahan yang dihadapi perlu mendapat perhatian bukan hanya dari pengelola, namun juga masyarakat.. Metode yang digunakan dalam pengabdian ini adalah dengan wawancara dan survey kondisi TPQ. Berdasarkan hasil survey dan wawancara,pengelola merasa perlu menambah beberapa fasilitas seperti banner tata cara solat dengan ukuran besar, pengecatan ruangan, mendesain interior ruangan yang lebih nyaman dan pengecatan fasilitas bermain. Seluruh fasilitas tersebut membutuhkan desain yang sesuai kebutuhan dengan estimasi anggaran agar dapat di ajukan kepada donatur jika akan di kerjakan. Berdasarkan hasil desain dan perhitungan didapat Rencana Anggaran Biaya sebesar Rp. 3.952.500
BIMBINGAN TEKNIS DAN REVITALISASI FASILITAS BERMAIN ANAK PADA KB & TK NADA KOTA MALANG Fauzi Akbar Rahmawan; Radhia Jatu Noviarsita Sakti; Utami Retno Pudjowati; Indah Ria Riskiyah; Novita Anggraini; Udi Subagyo
J-ABDI: Jurnal Pengabdian kepada Masyarakat Vol. 3 No. 6: Nopember 2023
Publisher : Bajang Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53625/jabdi.v3i6.6759

Abstract

TK Nada yang berlokasi di Jl. Selorejo Blok B Kec. Lowokwaru Kel. Lowokwaru Kota Malang merupakan taman pendidikan anak yang banyak menerima murid dari warga sekitar kampung Selorejo. Dengan semakin meningkatnya jumlah murid maka fasilitas bermain anak perlu ditingkatkan agar dapat mengimbangi banyaknya murid yang dari segi jumlah semakin meningkat. Selain itu fasilitas ruangan perlu dilakukan perbaikan agar dapat menunjang proses belajar mengajar yang nyaman antara murid dan guru. Estimasi Biaya untuk perbaikan fisik TK menjadi hal yang penting untuk memberikan informasi kebutuhan dana yang disiapkan agar perbaikan fisik dapat dilaksanakan. Selain itu kegiatan melukis dinding menjadi hal penting untuk dilakukan agar ruangan menjadi lebih menyenangkan bagi anak saat belajar, sebab TK akan melaksanakan akreditasi dan melukis menjadi kebutuhan mendesak yang diperlukan oleh pengelola agar memperoleh nilai yang baik. Selain itu bantuan berupa alat bermain juga diperlukan karena keterbatasan alat bermain yang dimiliki
PERANCANGAN DAN PEMASANGAN CLOSED CIRCUIT TELEVISION (CCTV) PADA JALAN UMUM DI DAERAH RW 15 KEL. LOWOKWARU Fauzi Akbar Rahmawan; Indah Ria Riskiyah; Sumardi, Sumardi; Kharisma Nur Cahyani; Deni Putra Arystianto
JURNAL PENGABDIAN MANDIRI Vol. 3 No. 9: September 2024
Publisher : Bajang Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53625/jpm.v3i9.8655

Abstract

Keamanan masyarakat adalah aspek krusial dalam pembangunan suatu daerah. Jalan umum dan lingkungan sekitarnya merupakan area yang rentan terhadap berbagai risiko keamanan, termasuk tindakan kriminal dan pelanggaran lainnya. Kelurahan Lowokwaru, khususnya di daerah Jalan Selorejo yang termasuk dalam kawasan RW 15, adalah wilayah yang padat hunian dengan aktivitas masyarakat yang tinggi. Dalam beberapa bulan terakhir, peningkatan kegiatan kriminal di sekitar lingkungan tersebut telah menjadi perhatian khusus. Oleh karena itu, diperlukan langkah-langkah proaktif untuk meningkatkan keamanan dan meminimalkan risiko kejahatan di wilayah ini. Pemasangan Closed Circuit Television (CCTV) di jalan umum telah terbukti sebagai metode efektif untuk meningkatkan keamanan. CCTV tidak hanya memberikan deterrensi terhadap aktivitas kriminal, tetapi juga berfungsi sebagai alat bukti yang berharga dalam menyelidiki dan menangani pelanggaran. perancangan dan pemasangan sistem CCTV di sejumlah titik strategis di jalan umum di RW 15 Kelurahan Lowokwaru akan membantu mengawasi gerak-gerik di area publik, memberikan rasa aman kepada warga, dan mendukung tindakan keamanan yang cepat dan tepat. Selain itu, dengan terpasangnya sistem ini, diharapkan akan mendorong partisipasi aktif warga dalam menjaga keamanan lingkungan mereka.
PERAWATAN DAN PENGECATAN ULANG PADA BANGUNAN POS JAGA KELURAHAN JATIMULYO KOTA MALANG Radhia Jatu Noviarsita Sakti; Fauzi Akbar Rahmawan; Utami Retno Pudjowati; Zulmy Faqihuddin Putera; Diah Lydianingtias
JURNAL PENGABDIAN MANDIRI Vol. 3 No. 9: September 2024
Publisher : Bajang Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53625/jpm.v3i9.8656

Abstract

Pos Jaga yang berada di Jl. Simbar Menjangan Kel. Lowokwaru Kec. Lowokwaru Kota Malang merupakan fasilitas keamanan yang dimiliki warga sekitar. Pos Jaga ini memerlukan pemeliharaan pada bagian dinding, kusen dan genteng karena banyak cat yang terkelupas serta noda. Pada bagian dinding bawah terdapat batu alam yang sudah kusam. Sehingga diperlukan pengecatan ulang dan coating batu alam pada bagian dinding pos jaga serta perhitungan biaya untuk dapat menyelesaikan proses pemeliharaan pos jaga agar dapat dimanfaatkan secara maksimal oleh warga sekitar.
Studi Eksperimental Lendutan Pelat lantai Menggunakan Bata Hebel dengan Perkuatan Besi Siku Deni Putra Arystianto; Fauzi Akbar Rahmawan; Kharisma Nur Cahyani; Harsalim Aimunandar Jayaputra
Jurnal Serambi Engineering Vol. 9 No. 4 (2024): Oktober 2024
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research examines the deflection behavior of floor slabs using Hebel blocks as the main material, reinforced with angle iron. The aim of this study is to understand how angle iron reinforcement can enhance the flexural capacity and stiffness of floor slabs made of Hebel blocks. The methodology involved experimental testing of 200 cm x 200 cm floor slabs using Hebel blocks measuring 20 cm x 60 cm x 7.5 cm and 5/5 angle iron reinforcement, with test loads applied through a water tank up to 250 kg/m². Deflection was measured using dial gauges at three different points: at both supports and the mid-span of the slab. The results of the study showed that the use of angle iron significantly improved the slab's stiffness and load-bearing capacity, with a uniform distribution of deflection. The largest deflection occurred at the mid-span, with an average dial 2 reading of 3.284 mm and a maximum deflection of 5.25 mm. Meanwhile, deflection at the supports showed average readings of 2.958 mm on dial 1 and 2.0978 mm on dial 3. This indicates that the deflection at the mid-span experienced the maximum load and deflection. The deflection at the supports, as measured by dials 1 and 3, was relatively symmetrical. The allowable deflection calculated based on SNI 2847-2019 is 11.11 mm or 16.67 mm, indicating that the slab deflection remains within safe limits.
SIMULASI OPERASI PRODUKSI BETON READYMIX MENGGUNAKAN CYCLONE rahmawan, fauzi akbar
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 4 No. 1 (2023): MARET 2023
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Simulasi produktivitas batchingplant dengan metode simulasi cyclone adalah suatu teknik yang digunakan untuk memprediksi kinerja sebuah batchingplant dengan memodelkan prosesnya dalam bentuk simulasi. Metode simulasi cyclone ini memanfaatkan prinsip pergerakan sumberdaya dalam sebuah cyclone untuk merepresentasikan aliran material di dalam batchingplant. Dalam simulasi ini, faktor-faktor seperti waktu siklus, kapasitas alat, dan penggunaan bahan baku dapat dimasukkan sebagai parameter untuk memprediksi kinerja batchingplant. Hasil simulasi ini dapat membantu pengelola batchingplant untuk mengevaluasi kinerja dan mengidentifikasi area-area yang dapat ditingkatkan untuk meningkatkan produktivitas. Misalnya, simulasi dapat menunjukkan area yang membutuhkan pengoptimalan, seperti proses pencampuran atau pengaturan ulang aliran material. Dalam beberapa kasus, simulasi dapat membantu pengelola batchingplant mengidentifikasi masalah yang tidak terlihat sebelumnya, seperti kemacetan/waktu tunggu atau penumpukan material yang dapat mempengaruhi waktu siklus dan produktivitas . Dari hasil simulasi produktivitas batchingplant dengan metode simulasi cyclone ini didapat nilai produktivitas sebesar 57 m3/ jam.
PROTOTIPE STRUKTUR ATAP PADA BANGUNAN GEDUNG SEKOLAH SD DAN SMP DI KOTA PASURUAN Suhariyanto, Suhariyanto; Arystianto, Deni Putra; Rahmawan, Fauzi Akbar; Suryadi, Akhmad
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 4 No. 4 (2023): DESEMBER 2023
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Di kota Pasuruan telah terjadi kurang lebih 3 (tiga) kali runtuhnya struktur atap bangunan gedung sekolah secara tiba-tiba yaitu sekitar tahun 2008, 2016 dan terakhir tahun 2019, dimana pada tahun 2019 tersebut menelan korban jiwa. Berdasarkan Studi Identifikasi Kerusakan Bangunan Sekolah SD dan SMP di Kota Pasuruan tahun 2022 diketahui sebagian besar kerusakan bangunan gedung sekolah terjadi pada struktur atap. Berdasarkan permasalahan tersebut di atas maka perlu dilakukan penelitian untuk mendapatkan prototipe struktur atap bangunan gedung sekolah di kota Pasuruan. Tujuan penelitian adalah untuk untuk mendapatkan prototipe struktur atap bangunan gedung sekolah yang memenuhi standar keamanan dan mudah dilaksanakan. Hasil penelitian adalah bahwa prototipe struktur atap bangunan gedung sekolah yang memenuhi standar keamanan dan mudah dilaksanakan adalah struktur kuda-kuda baja H150x150x7. Prototipe memiliki kelebihan antara lain memiliki kemungkinan kesalahan pelaksanaan yang relatif kecil, mudah dilaksanakan, awet dan waktu pelaksanaan yang relatif cepat
RENCANA KESELAMATAN KONSTRUKSI PROYEK JALAN TOL JAKARTA - CIKAMPEK II SELATAN PAKET 3 Ibrahim, Ajid; Sumardi, Sumardi; Rahmawan, Fauzi Akbar
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 4 (2024): EDISI DESEMBER
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i4.5710

Abstract

Pembangunan konstruksi saat ini sering kali dihadapkan dengan bahaya yang kerap terjadi selama pelaksanaan proyek, yang dapat membahayakan keselamatan dalam proyek konstruksi tersebut. Hal inilah yang menjadi alasan betapa pentingnya rencana keselamatan konstruksi yang baik sebagai upaya pencegahan kecelakaan kerja. Proyek Jalan Tol Jakarta Cikampek II Selatan Paket 3 ini terletak di Kabupaten Karawang dan Kabupaten Bekasi yang memiliki total panjang 31,25 km. Tujuan penelitian ini adalah mengetahui rencana Sistem Manajemen Kesehatan dan Keselamatan Kerja (SMK3), Mengidentifikasi Bahaya, Risiko, Pengendalian Risiko dan Peluang (IBPRP), rencana tindakan dan rencana biaya anggaran rencana keselamatan konstruksi. Metode yang digunakan dilakukan dengan cara menyusun, membahas dan mengelola data-data dilanjutkan studi kepustakaan yang digunakan sebagai acuan dan data pendukung dan peraturan perundang-undangan yang berlaku sebagai acuan perencanaan keselamatan konstruksi. Hasil dari perencanaan rencana keselamatan konstruksi memuat 6 komponen yang harus dilaksanakan diantaranyam kebijakan, struktur organisasi, perencanaan K3, pelaksanaan K3, pemantauan dan evaluasi K3 serta peninjauan dan peningkatan K3. Hasil Identifikasi Bahaya, Risiko, Pengendalian Risiko dan Peluang (IBPRP) didapatkan 1 pekerjaan risiko kecil, 64 pekerjaan risiko sedang dan 1 pekerjaan risiko besar. Rencana tindakan dilakukan dengan membuat sasaran dan program khusus memuat dari tabel IBPRP dengan pekerjaan yang memiliki skala tingkat risiko sedang dan besar. Hasil rencana anggaran biaya K3 didapat nilai sebesar Rp. 15,134,715,663, dimana menghasilkan presentase biaya terhadap nilai kontrak sebesar 0,3%.
EVALUASI PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK APARTEMEN WESTOWN VIEW SURABAYA Firdaus, Dhiva Rizky; Setiono, Joko; Rahmawan, Fauzi Akbar
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 4 (2024): EDISI DESEMBER
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i4.5726

Abstract

Proyek Pembangunan Apartemen Westown View Surabaya memiliki luas bangunan 50.885 m2 dan terdiri dari 45 lantai. Luas dan tingginya area kerja membuat risiko pekerjaan proyek yang cukup tinggi sehingga dibahas tentang Evaluasi Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Pada Proyek Apartemen Westown View Surabaya dengan tujuan untuk mengetahui sebarapa baik penerapan SMK3 pada proyek Pembangunan Apartemen Westown View Surabaya.Metode yang digunakan yaitu penyebaran kuesioner kepada pihak yang terlibat dalam proyek lalu diolah menggunakan software SPSS 2024 dan metode scoring untuk mengetahui seberapa besar presentase penerapan SMK3. Untuk identifikasi bahaya yang terjadi berdasarkan JSA pendekatan HIRARC. Untuk pembahasan hambatan dan solusi yang terjadi berdasarkan observasi dan kondisi di lapangan. Mendesain jalur evakuasi berupa layout menggunakan software Autocad 2020 dan Photoshop. Untuk Rencana Anggaran Biaya menggunakan standart acuan SE Menteri PUPR Nomor 11 Tahun 2019.Berdasarkan hasil penelitian, penerapan SMK3 di proyek berdasarkan penilaian 42 responden didapat nilai sebesar 83,79% menunjukkan bahwa penerapan SMK3 dilakukan dengan sangat baik. Hasil identifikasi metode HIRARC pada proyek ini menempati tingkat risiko rendah. Hambatan yang mempengaruhi penerapan SMK3 pada proyek ini adalah dari pihak yang terlibat dalam proyek, lingkungan kerja, dan sarana prasarana. Disusun jalur evakuasi dengan tujuan untuk mencegah terjadinya insiden atau hal-hal yang tidak diinginkan pada proyek ini. Rencana Anggaran Biaya K3 sebesar Rp. 2.160.099.960,00.