Claim Missing Document
Check
Articles

Found 22 Documents
Search

Analysis of Steel Bridge Frame Reinforcement Using External Prestressing Method Due to Moving Loads Noor, Rusandi; Mustaqim, Muhammad; Mufassirin Liana, Ulwiyah Wahdah; Siregar, Adde Currie
JSE Journal of Science and Engineering Vol. 3 No. 2 (2025): Journal of Science and Engineering
Publisher : LPPI Universitas Muhammadiyah Kalimantan Timur (UMKT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30650/jse.v3i2.4062

Abstract

Bridge reinforcement with external prestressing method is a proven effective approach to overcome damage in strengthening bridge structures. This method uses the installation of prestressing cables outside the steel frame of the bridge to increase the strength and stability of the structure. The bridge structure is made with the guidelines of SNI 1725: 2016 standard steel frame of class A bridges, using IWF and H Beam steel, with a plate thickness of 20 mm with a span length of 60 meters, a width of 9.13 meters and a height of 6.3 meters. The structural analysis of this study uses the SAP2000 v22 software program. In this study, 3 prestressing cable tensions were compared on the reinforcement of the bridge frame with the external prestressing method. And a loading simulation was carried out which could provide a response in the form of strain due to moving loads and a bridge structure response that was reduced by approximately 50% from the deflection force on the steel frame reference bridge if given a moving load. Choosing a bridge that has the lowest settlement. The review point is determined for the comparison of deflection at point object 7 and joint object U3. The Type E cable-stayed bridge has the lowest results in percentage, about 46.68% for a speed of 40 km/h, 48.60% for a vehicle speed of 50 km/h and 49.91% for a vehicle speed of 60 km/h, indicating that this bridge has the best analysis performance among the cable-stayed bridges analyzed.
Peran Mahasiswa dalam Pelaksanaan Pengerjaan Sloof dan Balok pada Proyek Gedung Puskesmas Harapan Baru Wahyuni, Eka; Pratiwi, Dheka Shara; Agustina, Fitriyati; Liana, Ulwiyah Wahdah Mufassirin; Yatnikasari, Santi; Siregar, Adde Currie; Harris, Abdul; Pane, Ivindra
Jurnal Pengabdian Masyarakat Inovasi Indonesia Vol 3 No 3 (2025): JPMII - Juni 2025
Publisher : CV Firmos

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54082/jpmii.792

Abstract

Kegiatan pengabdian kepada masyarakat ini dilaksanakan dalam bentuk pendampingan teknis pada proyek pembangunan Gedung Puskesmas Harapan Baru di Samarinda, Kalimantan Timur, dengan fokus pada pekerjaan struktur Sloof dan balok. Mahasiswa Program Studi Teknik Sipil terlibat secara aktif sebagai peserta pengabdian dengan peran utama sebagai pengawas lapangan sekaligus pembelajar. Melalui pendekatan observasi partisipatif, mahasiswa mendampingi proses konstruksi mulai dari persiapan, pembesian, pemasangan bekisting, hingga pengecoran Sloof dan balok. Selain mengamati dan mencatat prosedur teknis, mahasiswa juga memantau penerapan aspek Keselamatan dan Kesehatan Kerja (K3) serta mendokumentasikan kendala teknis di lapangan. Hasil dari kegiatan ini menunjukkan adanya peningkatan pemahaman mahasiswa terhadap praktik konstruksi nyata, terutama terkait metode pelaksanaan dan kontrol mutu pekerjaan struktur. Di sisi lain, keberadaan mahasiswa turut membantu meningkatkan kesadaran pekerja terhadap pentingnya penggunaan alat pelindung diri (APD) secara konsisten. Program ini memberikan kontribusi ganda, yakni penguatan kompetensi mahasiswa di bidang teknik sipil terapan dan dukungan terhadap kelancaran serta kualitas pembangunan fasilitas kesehatan masyarakat.