Claim Missing Document
Check
Articles

Found 25 Documents
Search

Peningkatan Produktivitas Kinerja pada Universitas XYZ Menggunakan Metode Marvin E Mundel Susiati, Devi; Pradana, Franky Rangga
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 1 (2024): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i1.23602

Abstract

The development of the world of education requires university institutions to continue to increase innovation and productivity so that they can be highly competitive. Factors that are very influential in improving the quality of the University are lecturers and students. For this reason, XYZ University must be able to adapt to technological developments so that it can respond quickly to global market needs. With this phenomenon, XYZ University, especially the Faculty of Engineering, needs skilled workers in the engineering field so as to produce graduates who have relevant abilities and skills. The current vision of the Faculty of Engineering is "To become a superior and competitive engineering faculty in the Southeast Asia region by 2035". To realize this vision, Engineering is required to always improve the quality of the education process, research and community service accompanied by efforts to increase its relevance in the context of global competition. In the future, FT-XYZ is expected to be able to have quality that is on par with engineering faculties from leading universities in Southeast Asia in terms of the quality of the learning process and graduates, research and community service, so that it can raise the honor and dignity of the Indonesian nation. The steps taken are to increase the productivity of workforce performance. Therefore, the Marvin E Mundel method was used to analyze performance productivity, factors that experienced increases or decreases. The results of these calculations show that the alternative chosen with the highest productivity increase value is alternative 3, namely by increasing input slightly and increasing output more. The value obtained based on alternative 3 is 256.38%, with a drastic increase of 156.38% from the initial productivity. 
Analisis Risiko Bahaya Kesehatan dan Keselamatan kerja (K3) Pengelasan dengan Metode Fishbone Diagram dan Job Safety Analisis (JSA) Cahyono, Manggi Dwi; Susiati, Devi
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 1 (2024): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i1.24073

Abstract

Occupational Safety and Health (K3) are activities that ensure the creation of safe working conditions, avoiding physical and mental disorders. The aim of this research is to determine the risk of severity of welding workers who do not use Personal Protective Equipment (PPE). This research uses 2 methods, the fishbone diagram method and job safety analysis. The survey technique was carried out by taking a sample of 15 welding worker respondents in the company. The results of this research are that welding workers experience a very high level of risk to Occupational Health and Safety due to the lack of Personal Protective Equipment (PPE) used. So companies must provide, comply with and prioritize (K3) welding. The company must also facilitate and require all workers to use safety equipment such as welding Personal Protective Equipment (PPE) that meets the Indonesian National Standard (SNI).
Analisis penilaian postur kerja dengan Metode Ovako Work Posture Analysis System pada karyawan PT. ABC Susiati, Devi; Kharismadani, Ayu; Cahyono, Manggi Dwi
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 4 (2024): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i4.39845

Abstract

PT. ABC is a company engaged in milling wheat into the largest flour in Indonesia. Every day the company has to produce as much as 6.500 tons/day of wheat flour to meet consumer needs. Therefore, employees must be able to work quickly and productively. The company has 11 Mill AB employees, not including millers. Many employees experience complaints and even injuries when carrying out activities on the production floor, starting from the screeningman, rollman, and shiftman. Given these problems, researchers used the Nordic Body Map Questionnaire in collecting primary data. Mill AB's employees have the most complaints about their backs because when working, employees often slouch. Furthermore, the data was processed using the OWAS method approach where the most complaints were in category 2, namely this attitude has the potential to cause damage to the musculoskeletal system. However, there is also a work attitude that is in category 3 where this attitude is also dangerous for musculoskeletal system disorders so work postures result in a very significant effect of tension.
Analisa Perencanaan Metode Joint Economic Order Quantity (JEOQ) Pada Persediaan Bahan Baku di UD. Fajar Arya, Dimas; Nurmawati, Nurmawati; Susiati, Devi
Industrial & System Engineering Journals (ISEJOU) Vol. 2 No. 1 (2023): ISEJOU, Vol 2, No.1 Desember 2023
Publisher : Universitas Katolik Darma Cendika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37477/isejou.v2i1.500

Abstract

Model JEOQ mensyaratkan bahwa biaya pemesanan, biaya pembelian beras per ton berdasarkan jenis atau grade beras, dan biaya penyimpanan beras di gudang beras harus dipertimbangkan sebelum model dapat digunakan. Pendekatan JEOQ tanpa memperhitungkan variasi siklus produksi beras merupakan pendekatan yang akan digunakan sebagai dasar penelitian ini. Teknik JEOQ yang tidak memperhitungkan perubahan siklus produksi beras menjadi fokus utama pendekatan pertama, sedangkan pendekatan JEOQ yang memperhitungkan perbedaan siklus produksi beras menjadi fokus utama pendekatan kedua. Pembuatan beras Bulog dan beras anim ha akan menggunakan berbagai bahan baku yang berbeda, antara lain beras mapan 05, ir 48, inpari 32, dan ciherang. Tingkat perputaran persediaan beras dan beras yang relatif tinggi bahkan dapat mempermudah pemenuhan kebutuhan bulanan akan sumber daya keuangan untuk membeli beras karena kemungkinan besar akan tersedia beras. Guna meningkatkan pengendalian produksi beras dan meningkatkan kesesuaian penerapan JEOQ, perusahaan harus mencantumkan ketentuan dalam kontrak kerjanya dengan pemasok beras yang menentukan waktu antar pesanan dan lead time beras yang lebih tepat.
Perancangan Jaringan Distribusi Sepatu yang Efisien dengan Pendekatan Center of Gravity dan Saving Matrix Susiati, Devi; Nurmawati, Nurmawati
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 1 (2026): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i1.54707

Abstract

PT. MEC is a shoe company in Mojokerto, East Java. This company markets its products throughout Indonesia. To meet the demand for these products promptly, a new central distribution warehouse location was required. It is intended that companies can compete and survive with imported products and other local brand products. Products that reach the hands of consumers at the right time will win the market. This study aims to determine the location of warehouses that are efficient and effective in product marketing channels and minimize transportation costs by using the center of gravity and saving matrix methods. The processed data is primary data that focuses on 13 marketing area cities, especially on the island of Java. The calculation results are obtained using the center of gravity method, the new warehouse is located in Bantul, Yogyakarta with coordinate points (- 7.977838; 110.367226) and more optimal transportation costs of 47%. Furthermore, the data is processed using the saving matrix method, the distribution route is divided into 6 with a total distance traveled of 687.19 km.