Claim Missing Document
Check
Articles

Found 12 Documents
Search

PENINGKATAN INFRASTRUKTUR DRAINASE PURA PEJENENGAN DADIA TEBEN DAYANG, DESA SIBETAN, KECAMATAN BEBANDEM, KAB. KARANGASEM I Gusti Agung Gede Nodya Dharmastika; Putu Gede Suranata; Putri Ayu Devy Permata Sari
Jurnal Abdi Daya Vol. 5 No. 2 (2025): Jurnal Abdi Daya Vol.5 No.2 Tahun 2025
Publisher : Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/jad.5.2.2025.21-28

Abstract

This community service activity was carried out as an academic contribution to support the enhancement of development planning capacity at the village level. The program aimed to assist Desa Adat Sibetan, located in Bebandem District, Karangasem Regency, in preparing a Cost Budget Plan and a funding proposal for the construction of a Retaining Wall in the traditional cemetery area, which has a high risk of landslides. The main problems faced by the community partners were the limited technical capacity of village officials in preparing systematic planning documents and the lack of understanding of funding proposal mechanisms in accordance with government standards. The implementation method consisted of several structured stages, including initial coordination and need assessment with village officials, field observations and surveys, preparation of work item lists and volume calculations, material unit price surveys in the Karangasem region, and unit price analysis based on construction technical standards. These stages were followed by technical assistance and Focus Group Discussions (FGDs) to help village officials understand the principles of budget planning and the procedures for preparing funding proposals independently. A participatory approach was applied throughout the process to ensure effective knowledge transfer, capacity building, and active community involvement in decision-making. The results showed that the total cost estimation for the construction of the Retaining Wall at the Setra of Desa Adat Sibetan reached IDR 3,567,984,223.00. The cost estimation was prepared based on actual field survey data and the latest material price adjustments in Karangasem Regency, resulting in an accurate and accountable cost estimate that can serve as a valid basis for submitting funding proposals to local government agencies and development support institutions. Overall, this program successfully produced practical outputs in the form of an applicable RAB document and a complete proposal, while also enhancing the technical and administrative planning capacity of the Sibetan village officials in managing infrastructure development. Furthermore, this activity contributed to strengthening participatory-based governance, promoting transparency and accountability in village financial management, and aligning with the Sustainable Development Goals (SDGs), particularly in the areas of resilient infrastructure, sustainable development, and community empowerment partnerships.
Cost Analysis of Project Planning for the G2 Building Structure Construction at Warmadewa University Using the Building Information Modeling (BIM) Method Nodya Dharmastika; Ida Ayu Cri Vinantya Laksmi; Made Mas Surya Wiguna; Putu Gede Suranata
Jurnal Rekayasa Teknik Sipil dan Lingkungan - CENTECH Vol. 6 No. 1 (2025): Jurnal Rekayasa Teknik Sipil dan Lingkungan, April 2025, ISSN 2722-0230 (Online
Publisher : UKI Press

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Cost planning is a crucial aspect of construction project execution to ensure budget efficiency and project success. This study aims to analyze the cost planning for the construction of the G2 Building structure at Warmadewa University using the Building Information Modeling (BIM) method. BIM is employed as the primary tool to generate a 3D model integrated with accurate and efficient cost estimation (quantity take-off). The study begins by collecting initial project design data, technical specifications, and a conventional budget plan (BOQ). Subsequently, this data is implemented in BIM software to create a 3D model of the building structure. This model is used to conduct quantity analysis and cost estimation based on the work volume automatically generated by BIM. The results show that the BIM method produces a cost planning estimate of IDR 13,622,950,957, while the conventional method estimates IDR 14,648,621,255, resulting in a difference of IDR 1,025,670,298 or 7%. Keywords: Building Information Modeling (BIM); cost planning; cost estimation