Claim Missing Document
Check
Articles

EVALUASI KINERJA SIMPANG TIGA TAK BERSINYAL PASAR IBUH PAYAKUMBUH Riyaldi Rendra; Surya Eka Priana; Helga Yermadona
Ensiklopedia Research and Community Service Review Vol 2, No 3 (2023): Vol. 2 No. 3 Juni 2023
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/err.v2i3.1763

Abstract

Abstrack: The Payakumbuh signalless intersection is a busy traffic intersection due to the high volume of vehicles and high side friction caused by market activity. The Pasar Ibuh intersection connects four sub-districts so that many vehicles pass through the intersection which can cause traffic jams and even traffic accidents. This study aims to evaluate the performance of the signalless intersection of Pasar Ibuh Payakumbuh and find alternative solutions to the problems that occur at these intersections. The research method used is to calculate and observe the volume of traffic flow through recording and observing the location of the intersection to find out the geometry of the intersection and existing side barriers. This research concludes that the peak hour of traffic flow at the Pasar Ibuh Payakumbuh intersection occurs at 16:00 - 17:00 WIB. From the analysis results, the capacity value (C) is = 2824.557 smp/hour, traffic flow (Q) is = 2399 smp/hour, delay (D) is = 14.161 seconds/smp, and the degree of saturation value (DS) is = 0.85. Based on the value of the degree of saturation, the performance level of the intersection is not good. The alternative is to prohibit turning right for minor roads. So that the resulting analysis is a capacity value (C) of = 3172.826 smp/hour, traffic flow (Q) of = 2399 smp/hour, delay (D) of = 12.715 seconds/smp, and the degree of saturation (DS) = 0.76, based on the value of the degree of saturation, it can be concluded that the intersection performance is good.Keywords : Signalless Three-way Intersection, Side Barriers, Degree of Saturation, Intersection Performance, Performance Evaluation
PENERAPAN METODE BUILDING INFORMATION MODELLING PADA PERENCANAAN STRUKTUR GEDUNG DINAS SOSIAL KOTA BUKITTINGGI Nadia Ovtaniani; Surya Eka Priana; Zulhedi Zulhedi
Ensiklopedia Research and Community Service Review Vol 2, No 3 (2023): Vol. 2 No. 3 Juni 2023
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/err.v2i3.1764

Abstract

Abstrak: Building Information Modelling merupakan seperangkat teknologi, proses, kebijakan yang seluruh prosesnya berjalan secara kolaborasi dalam sebuah model digital. Seluruh informasi yang terdapat pada Building Information Modelling disimulasikan didalam proyek pembangunan ke dalam model 3 dimensi dan merupakan proses yang menghasilkan dan mengelola data-data bangunan dalam sirklus projeknya serta untuk mempermudah komponen-komponen yang ada pada bangunan dan cara pemeliharaan bangunan. Building Information Modelling memiliki manfaat yaitu hasil akurat atau sesuai dengan yang direncanakan. Metode penelitian ini adalah metode kualitatif yang merupakan metode penelitian yang bersifat deksriptif serta cenderung menggunakan analisis. Dalam penelitian kualitatif dasar teori sangat dimanfaatkan oleh peneliti agar proses penelitian lebih fokus dan sesuai dengan fakta yang ditemukan. Cara menggunakan aplikasi dari Building Information Modelling, aplikasi ini sangat memang sangat bermanfaat bagi dunia konstruksi. Semua jenjang Pendidikan yang berkaitan dengan dunia konstruksi pasti memberikan pengetahuan tentang Building Information Modelling menjadi mata kuliah sendiri. Pembelajaran yang diberikan Building Information Modelling ini berfokus pada aplikasi Bentley OpenBuilding Designer, aplikasi ini termasuk Building Information Modelling karena dapat mengakomodir seluruh aspek dalam perencanaan konstruksi. Pembahasan nantinya akan memuat unsur arsitektural, struktur, dan mekanikal sehingga menyebabkan tidak adanya tabrakan desain. Pemodelan yang dibutuhkan tidak membutuhkan waktu yang lama dan bisa dikerjakan oleh satu orang saja. Hasil pemodelan ini sangat akurat dan sesuai dengan yang direncanakan. Dengan melakukan pemodelan 3D menggunakan software OpenBuilding Designer pada perencanaan struktur Gedung Dinas Sosial Kota Bukittinggi kita dapat mengetahui bagaimana gambaran-gambaran dari pemodelan arsitektur yang meliputi dinding, pintu, dan jendela. Pemodelan struktur yang meliputi kolom, balok, dan plat lantai. Pemodelan mekanikal yang meliputi saluran udara bersih dan saluran udara kotor secara detail. Building Information Modelling memberikan informasi kepada penyedia jasa dan pengguna jasa sehingga memudahkan dalam pemeliharaan atau perawatn komponen bangunan. Tahapan pemodelan merupakan tahapan pertama yang merupakan tahapan Visualisasi yang belum lebih mendetail.Kata kunci : Building Information Modelling, OpenBuilding Designer, konstruksi, , arsitektur, struktur, mekanikal
PERENCANAAN PELINDUNG BANTARAN SUNGAI (REVETMENT) PADA SUNGAI ULU MASANG NAGARI GANGGO MUDIAK KECAMATAN BONJOL KABUPATEN PASAMAN Zenna Zenna; Surya Eka Priana; Ana Susanti Yusman
Ensiklopedia Research and Community Service Review Vol 2, No 3 (2023): Vol. 2 No. 3 Juni 2023
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/err.v2i3.1769

Abstract

Abstrak: Sungai Ulu Masang merupakan sungai yang berada di Kecamatan Bonjol Kabupaten Pasaman. Sungai memiliki manfaat yang sangat penting bagi kehidupan manusia. Dalam satu aliran sungai banyak kegunaan yang bisa di dapatkan oleh masyarakat sekitar. Beberapa kegunaan dan peran sungai bagi kehidupan manusia tersebut sudah seharusnya kita lestarikan dan merawat sungai sebaik-baiknya. Sungai Ulu Masang merupakan sungai yang ada di Nagari Ganggo Mudiak yang harus di buat dinding penahan tanah agar tidak terjadi gerusan tebing sungai. Apabila dinding sungai tidak di buat dinding penahan maka tanah akan terkikis oleh air sungai. metode dalam penelitian ini meliputi tempat penelitian dilakukan, data penelitian, alat dan bahan penelitian, prosedur penelitian, analisis data, dan diagram alur penelitian. Perhitungan curah hujan dilakukan dengan menggunakan metode gumbel. menghitung debit aliran. Analisa dan Perhitungan debit di sungai Ulu Masang dibagi menjadi 2 bagian yaitu debit normal (Qn) dan debit Maksimal (Qmax) Tingginya tulangan tebing, penggunaan bronjong ini untuk perkuatan dianggap aman yakni 10,75 9,25 tinggi muka air max. serta telah memenuhi kontrol terhadap guling 2,20 ≥ 1.5 (Aman) dan kontrol terhadap geser 1,58 ≥ 1.5 (Aman). Struktur pelindung tebing stabil dan aman dari dampak naiknya permukaan air sungai, sesuai dengan faktor keamanan yang dilihat. Bronjong kawat anyaman memiliki dimensi 80 x 100 mm. Dalam hal ini, bronjong dengan dimensi diberi kode C yakni 4 x 1x 1 (m) dan F yakni 4 x 1 x 0,5 (m).Sesuai dengan temuan penelitian mengenai perencanaan pelindung bantaran sungai (Revetment) di sungai Ulu Masang Nagari Ganggo Kecamatan Bonjol Kabupaten Pasaman maka dipergunakan Bronjong. Analisis hasil perhitungan bronjong Dimensi bronjong adalah 4 x 1 x 1 (m). Dan 4x1x0,5 (m) Kata Kunci : Sungai  Bronjong Revetmant Ganggo Mudiak, Gumbel.
ANALISIS KINERJA LALU LINTAS RUAS JALAN BIRUGO PUHUN AKIBAT OPERASIONAL PUSKESMAS TERATAI BIRUGO DATUAK BANDARO KOTA BUKITTINGGI Rahmad Septian; Surya Eka Priana; Zulhedi Zulhedi
Ensiklopedia Research and Community Service Review Vol 5, No 3 (2026): Vol. 5 No. 3 Juni 2026
Publisher : Ensiklopedia Research and Community Service Review

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/err.v5i3.3819

Abstract

Birugo Puhun Road is a secondary collector road in Bukittinggi City with a width of approximately 6 meters and an effective lane width of about 4 meters. It experiences relatively heavy traffic volumes, especially during peak hours due to activities related to boarding houses, small shops, residential areas, and other surrounding land uses. The addition of a public facility, namely the Teratai Birugo Datuak Bandaro Community Health Centers, has the potential to increase traffic volume and side friction. Therefore, this study aims to analyze the traffic performance on this road segment as a result of the health center’s operation. The data used include both primary and secondary data, such as population, existing road conditions, traffic volume, and side friction. The analysis was conducted based on the Indonesian Road Capacity Guidelines (PKJI) 2023. The results indicate that the highest traffic volume is 309 passenger car units per hour (pcu/h), the highest side friction class is 103 events per hour, the road capacity is 1,220 pcu/h, and the degree of saturation is 0.25, with the level of service classified as category B. It can be concluded that the operation of the Teratai Birugo Datuak Bandaro Community Health Centers has not had a significant effect on the traffic performance of Birugo Puhun Road. However, field conditions, particularly during peak hours, show that traffic flow tends to approach unstable conditions due to the narrow road width and increasing side friction.Keywords: Traffic Volume, Side Friction Class, Capacity, Degree of Saturation
ANALISIS KAPASITAS RUANG PARKIR DI PUSKESMAS LUBUK SIKAPING Ilham Chalik; SURYA EKA PRIANA; FEBRIMEN HERISTA
Ensiklopedia Sosial Review Vol 5, No 3 (2023): Volume 5 No 3 Oktober 2023
Publisher : Ensiklopedia Social Review

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/esr.v5i3.2391

Abstract

Parking facilities are inseparable in driving life. Parking facilities are a matter of considerable concern, especially when visiting places that are densely packed with visitors such as public service centers, for example the Lubuk Attitudeing Health Center. Puskesmas usually have a busy schedule of visitors at certain hours every day so that problems occur such as the lack of availability of parking areas. To overcome this problem, it is necessary to identify the availability of parking areas at the Lubuk Attitudeing Health Center by analyzing the characteristics and level of parking services at the health center, the characteristics analyzed are parking volume, parking accumulation, parking index, parking turnover rate, usage rate and parking capacity. From the results of research conducted for 5 working days, (July 15-19 2023) from 08.00-13.00 WIB (Puskesmas operational hours) and data processing was carried out, it can be concluded that: the largest number of vehicles that entered was 4 cars on Tuesday under 08:00 WIB and 17 motorcycles on Tuesday at 08.00-09.00 WIB, the largest accumulation was 6 cars on Monday and 27 motorbikes on Wednesday, the largest volume of parking for cars was 5 vehicles on Monday and motorcycles namely 33 vehicles on Wednesday, and the capacity of the parking area at the Lubuk Attitudeing Health Center is 7 SRP for cars and 52 SRP for motorcycles.
PERENCANAAN JARINGAN IRIGASI D.I LUNDAR KECAMATAN PANTI - KABUPATEN PASAMAN Ronaldo Ronaldo; Surya Eka Priana; Ana Susanti Yusman
Ensiklopedia Sosial Review Vol 5, No 3 (2023): Volume 5 No 3 Oktober 2023
Publisher : Ensiklopedia Social Review

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/esr.v5i3.2374

Abstract

The Lundar area, Panti sub-district, Pasaman Regency, the majority of the people are farmers, but in that area there are still many plots of community rice fields where the flow is not sufficient, so there are still plots of rice fields that are not drained by water. The purpose of this research is to make it easier for farmers to manage their rice fields in order to get good yields for the farmers around them. The planning used is the planning of primary irrigation channels and secondary irrigation channels. The research method uses the haspers and gumbel calculation method. From the results of the calculation of the dimensions of the canal planning, the results of the calculation of the primary channel planning where the Q value of 7.17 m³/s is greater than the Qmax value of 5.28 m³/s and the planning of the secondary channel where the Q value is 5.57 m³/s is greater than the Qmax value of 5.28 m³/d. From the results of calculations using the gumbel method for R 5TH is 428 mm and the results of calculations using the haspers method with a Q value of 5.48 m³/s. The results of data analysis and calculations can be used as a reference for related agencies such as the Irrigation Service, or other agencies.
ANALISA PENERAPAN LEAN CONSTRUCTION DALAM PENGELOLAAN MATERIAL UNTUK MENGURANGI LIMBAH KONSTRUKSI PADA PROYEK PERUMAHAN Kevin Rahman Hakim; Surya Eka Priana; Masril Masril
Ensiklopedia Research and Community Service Review Vol 6, No 1 (2026): Vol. 6 No. 1 Oktober 2026
Publisher : LEMBAGA PENELITIAN DAN PENERBITAN HASIL PENELITIAN ENSIKLOPEDIA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/err.v6i1.4093

Abstract

Material management is an important aspect of construction projects because it affects cost, quality, and project duration. Improper management can cause construction waste, including leftover materials, material damage, material loss, and rework. This study aims to identify waste material, analyze its causes, evaluate Lean Construction implementation, and formulate improvement efforts in the Amanah Residence Housing Project, Gadut, Agam Regency. This study used a descriptive qualitative method through observation, interviews, and documentation. Data were analyzed using waste identification, Fishbone Diagram analysis, and Lean Construction evaluation. The results showed that the dominant waste-causing factors were Man, Material, and Environment. The highest causes were lack of care, improper storage and material damage, and unfavorable weather. Lean Construction implementation reached 28.57%. Improvement efforts include better supervision, storage, distribution, coordination, and continuous improvement.Keywords: Lean Construction; Material Management; Waste Material; Fishbone Diagram; Housing Project
ANALISIS SALURAN PRIMER DAERAH IRIGASI D.I BANDAR PULAI LINTAS SEKTORAL KOTA BUKITTINGGI Masriki Masriki; Surya Eka Priana; Ana Susanti Yusman
Ensiklopedia Research and Community Service Review Vol 3, No 1 (2023): Vol. 3 No. 1 Oktober 2023
Publisher : LEMBAGA PENELITIAN DAN PENERBITAN HASIL PENELITIAN ENSIKLOPEDIA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/err.v3i1.2119

Abstract

Daerah Irigasi Bandar Pulai berada di lintas kota Bukittinggi, kecamatan Campago Guguak Bulek. Dearah irigasi ini dibawah wewenang UPTD Balai SDA BK Wilayah Utara, Dinas SDA BK Provinsi Sumatera Barat dengan  luas 95 Ha. Bendungnya bersifat teknis dengan kondisi rusak berat. Jaringan Irigasi Bandar Pulai ( BP ) terletak di Lintas Kota Bukittinggi, Kecamatan Campago Guguk Bulek. Pengaturan air yang masuk dari sungai ke jaringan irigasi tidak bisa di kontrol sesuai kebutuhan, sedangkan jaringan irigasinya sudah termasuk jaringan irigasi  teknis. Hal inilah salah satu penyebab kurangnya kinerja jaringan irigasi dan terganggunya fungsi layanan irigasi dan perlu direncanakan analisa pada saluran irigasi. Untuk pelaksanaan pembangunan saluran irigasi ini diperlukan perencanaan yang baik dan desain yang kuat. Metode yang dipakai dalam penelitian ini yaitu penelitian deskriptif kuantitatif, studi untuk mengetahui debit banjir rencana sungai Batang Tambuo. Dari hasil analisis pada daerah irigasi Bandar Pulai didapatkan debit pengambilan pada saluran primer yaitu sebesar 0,323 m³/dt. Untuk luas areal irigasi pada masa awal rencana saluran irigasi daerah irigasi Bandar Pulai sebesar 99,50 ha. Kata Kunci: Irigasi,  Daerah Irigasi, Dimensi saluran Irigasi 
ANALISIS RISIKO PELAKSANAAN PROYEK RENOVASI SDN 14 SIMPANG AMPEK SUNGAI PUA MENGGUNAKAN NVIVO Reza Azzahra; Surya Eka Priana; Ishak Ishak
Ensiklopedia of Journal Vol 9, No 1 (2026): Vol. 9 No. 1 Oktober 2026
Publisher : LEMBAGA PENELITIAN DAN PENERBITAN HASIL PENELITIAN ENSIKLOPEDIA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/eoj.v8i13.4089

Abstract

Renovation projects face uncertainty because existing building conditions may differ from initial plans, triggering scope changes and interconnected risks. This study aims to analyze risks in the renovation project of State Elementary School (SDN) 14 Simpang Ampek Sungai Pua and identify mitigation responses. A qualitative approach was employed through interviews with planners, supervisors, and lead foremen. Data were analyzed using NVivo 15 through coding, thematic grouping, and visualizations including Project Map, Mind Map, Hierarchy Chart, and Word Frequency Query. The findings identified six themes: schedule, cost, material, technical, and resource risks, and risk mitigation. Schedule-related risk was the dominant theme at 29%. The findings indicate that risks are interrelated and require mitigation through RAB evaluation, material control, local material use, stakeholder coordination, and design adjustments.Keywords: Risk Management; Renovation Project; Construction Risk; NVivo 15; Risk Mitigation