Search

Analisis Kolam Retensi Sebagai Sistem Pengelolaan Banjir (Studi Kasus: Saluran Pembuang Gelam, Kecamatan Pasar Kemis, Kabupaten Tangerang) Lingga, Faya Nabasa br.; Namara, Idi; Siregar, Chandra Afriade; G.R, Gandjar; Pratiwi, A. Andini Radisya; Hidayat, Reza Januar; Widyanto, Bambang Eko
English Vol 3 No 1 (2025): Volume 3 - Nomor 1 - Mei 2025
Publisher : Fakultas Teknik dan Teknologi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47970/jttt.v3i1.859

Abstract

Banjir merupakan salah satu bencana alam yang sering terjadi di Indonesia, termasuk di Kecamatan Pasar Kemis, Kabupaten Tangerang. Faktor utama penyebab banjir di wilayah ini adalah tingginya curah hujan, buruknya sistem drainase, serta meluapnya sungai yang melewati daerah tersebut, seperti Sungai Cirarab dan Saluran Pembuang Gelam. Untuk mengatasi permasalahan ini, diperlukan suatu sistem pengelolaan banjir yang efektif, salah satunya melalui pembangunan kolam retensi. Penelitian ini bertujuan untuk menganalisis kebutuhan volume kolam retensi sebagai sistem pengelolaan banjir di Kecamatan Pasar Kemis serta menentukan efektivitasnya dalam mereduksi debit banjir. Metode yang digunakan dalam penelitian ini adalah pendekatan kombinasi kuantitatif dan kualitatif. Analisis hidrologi dilakukan dengan menggunakan perangkat lunak Hydrognomon untuk memperoleh debit banjir rencana dengan metode HSS Snyder-Alexeyev. Selanjutnya, pemodelan hidrolika dilakukan dengan perangkat lunak HEC-RAS untuk menganalisis volume genangan serta efektivitas kolam retensi dalam mengurangi banjir. Hasil analisis menunjukkan bahwa debit banjir rencana di Saluran Pembuang Gelam untuk periode ulang 2 hingga 100 tahun berkisar antara 5,56 m³/det hingga 17,40 m³/det. Alternatif terbaik untuk volume kolam retensi yang dirancang adalah Alternatif 6, yaitu kolam dengan kapasitas 30.000 m³ serta dilengkapi dengan tiga pompa. Alternatif ini mampu mengurangi luas genangan dari 1.795,7 m² menjadi 831,8 m². Hasil pemodelan dengan HEC-RAS menunjukkan bahwa keberadaan kolam retensi dapat mengurangi volume banjir hingga 53,68%.
Pemahaman dan Kesiapan Insinyur Teknik Sipil dalam Green Infrastructure Saepurrahman, Dewa; Siregar, Chandra Afriade; Pratiwi, A. Andini Radisya; Zamani, Ahmad Fikri; Jainudin, E.; Satria, Eka; Rahayu, Ila; Lestari, Santi Dwi; Gustian, Arif; Iqbal, Rizky; Chalid, Abdul
TECHNO-SOCIO EKONOMIKA Vol 18 No 1 (2025): Jurnal Techno-Socio Ekonomika - April
Publisher : LPPM Universitas Sangga Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32897/techno.2025.18.1.4018

Abstract

Climate change, driven by rising greenhouse gas emissions, significantly impacts our planet. The construction sector, a major contributor to these emissions, demands a shift towards sustainable building practices. Green infrastructure (GI) offers a promising solution by integrating environmental principles into design and construction. This research investigates the understanding, challenges, and readiness of civil engineering graduates in implementing GI. Utilizing a survey-based approach with master's students at Sangga Buana University, the study analyzed the perceptions of students from different backgrounds: Civil Engineering, Other Engineering, and Non-Engineering. Results indicate that Civil Engineering students demonstrate a higher level of awareness and understanding of GI, influenced by their curriculum's focus on sustainable infrastructure development. However, challenges such as cost constraints and limited managerial support persist. Despite these challenges, civil engineering graduates exhibit a greater readiness to embrace and implement GI concepts.
ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK PERUMAHAN X MENGGUNAKAN METODE EARNED VALUE ANALYSIS (EVA) Presty, Riz Ronna Cintya; Soekiman, Anton; Pratiwi, A. Andini Radisya; Siregar, Chandra Afriade
JTERA (Jurnal Teknologi Rekayasa) Vol 10, No 1: Juni 2025
Publisher : Politeknik Sukabumi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31544/jtera.v10.i1.2025.183-192

Abstract

Sektor konstruksi perumahan sering menghadapi tantangan dalam pengelolaan biaya dan waktu, yang dapat berdampak signifikan pada keberhasilan proyek. Penelitian ini bertujuan menganalisis kinerja biaya dan waktu pada Proyek Perumahan X di Desa Padasuka, Kecamatan Maja, Kabupaten Lebak, Banten menggunakan metode Earned Value Analysis (EVA). EVA dipilih karena kemampuannya mengintegrasikan aspek biaya dan jadwal, memberikan gambaran komprehensif tentang status proyek. Penelitian berfokus pada pembangunan perumahan subsidi tipe 30/60 dengan nilai RAB Rp85.936.759 per unit dan durasi pelaksanaan 12 minggu. Data yang dianalisis meliputi Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), dan Actual Cost of Work Performed (ACWP). Hasil penelitian menunjukkan bahwa pada rumah tipe A1 dan A2, nilai Schedule Performance Index (SPI) menunjukkan keterlambatan di awal proyek (minggu 1-3) dan minggu ke-11, namun Cost Performance Index (CPI) konsisten di atas 1, menandakan efisiensi biaya. Proyeksi penyelesaian proyek melalui Estimate at Completion (EAC) sebesar Rp80.210.974 untuk kedua tipe rumah, lebih rendah dari anggaran, dan Estimate at Schedule (EAS) menunjukkan proyek akan selesai sesuai jadwal. Penelitian ini membuktikan bahwa metode EVA efektif dalam memberikan evaluasi komprehensif terhadap kinerja proyek perumahan.