cover
Contact Name
Muh Ikhsan Setiawan
Contact Email
ikhsan.setiawan@narotama.ac.id
Phone
-
Journal Mail Official
baridnizar84@gmail.com
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Proceeding of World Conference
ISSN : -     EISSN : 26561174     DOI : -
Proceeding of World Conference, is Publication of conference articles in the field of multidisciplinary sciences published by the World conference; aims to make it easier for readers and writers to access articles during time and make it easier to download and distribute.
Arjuna Subject : -
Articles 265 Documents
An Analysis Study Flood Improving The Capacity Reduction Long Storage And Bozem: ( A Case Study In One Of The Factories A Coffee At Sidoarjo Regency) Irfan Nur Rozzaq; Diah Ayu Restuti Wulandari
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.123

Abstract

. Industry is an important infrastructure in the city. At the location of the coffee factory in the village of Bringinbendo, Sidoarjo with an area of ??± 119,372 m², there is a lack of green open space and small dimensions so that it cannot accommodate the water discharge during high rainfall. The analysis data used is 10 years of rainfall data observations from the data Rain Station of Botokan, Sruni, Ketegan and Karangnongko. In this study the method used Log Pearson Type III method. So that the 5 year return rain discharge is 105.75 m³/sec. The existing channel capacity is 4040.42 m³ while the required volume is 4947.16 m³ with a flood discharge of 2,450 m³ / sec. Then it needs a long storage with a capacity of 2575 m³ and bozem with a capacity of 337.5 m³ so that it can accommodate the volume of water.
Relationship Product Quality And Price With Consumer Buying Interest In Ole-Ole Futsal Bung Tomo Surabaya Ahedi Syukro Sahudi; I Nyoman Sudapet; Hamzah Denny Subagyo
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.124

Abstract

This research was conducted with the aim of knowing the relationship between product quality and price with the interest of buying consumer Ole-Ole Futsal Bung Tomo. This type of research uses a quantitative approach. The sample in this study were 30 respondents taken by the snowball effect method. The data analysis technique in this study usedcorrelation test analysis Spearman rank. The calculation process was aided by theapplication program Statistical Package for the Social Sciences (IBM SPSS Statistics 20). The results of this study indicate that a correlation of 0.877 means that it is very strong and based on calculations, the product quality variable with consumer buying interest has a sig value of 0.000 <0.05, so Ho is rejected, the product quality is significantly associated with consumer buying interest. And the price variable shows that there is a correlation of 0.738 which means strong and based on calculations, the price variable with consumer buying interest has a sig value of 0.000 < 0.05 so Ho is rejected, then the price is significantly associated with consumer buying interest.
Capital Budgeting Analysis Of Investment Project Feasibility in PT Integra Indocabinet TBK Adetia Wardani; Wahyudiono Wahyudiono
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.125

Abstract

This research is a case study conducted in one of the property companies in Sidoarjo, East Java, namely PT Integra Indocabinet Tbk ,. Based on secondary data, PT Integra Indocabinet has increased sales and profits from 2014 - 2018. Therefore, the owners want to expand their expansion by adding new factory facilities so they can get more optimal profits and can increase exports abroad. The research aims to provide assistance in the form of suggestions for decision making between feasible or not worthy of the investment carried out. Based on the calculation, obtained an NPV value of 195,510,594,699 ? 0 which means it is feasible to run, an IRR of 22%> hurdle rate (10%) which means it is feasible to run; Payback Period is 4 years 3 months> 5 years which means it is feasible to be implemented; The Profitability Index is 1.98> 0, which means it's worth running. The results of the analysis show that using Capital Budgeting techniques can be seen that investment decisions for expansion are feasible.
Comparison Analysis Of Alternative Design And Budget Plan Using Steel Structure With Concrete Structure For Dormitory Of PMY Construction Project In Baucau, Timor-Leste Julystiana Tistogondo; Emilia Belo
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.126

Abstract

Re-design steel structure with concrete structure for dormitory of PMY Baucau building with floor plan size , consisting of the 2 floors with high aimed to: 1.) to Design the dimension of the upper concrete structure such as column, beam and plate with Preliminary design, 2.) to Calculate the gravity and seismic plan load that works for the building, 3.) to determine the formation of beam and column reinforcement from the analysis result by using the Frame System of Specific Moment Beares (SRPMK). The structure analysis was conducted using the SAP2000.V14, 4.) to Comparing Budget Plan between upper steel structure and upper concrete structure to discover economic value between those two upper structures. Calculation of concrete structure refers to SNI 2847-2013 , calculation of equivalent static earthquake refers to SNI 1726-2012 and calculation of Budget plan for labour and material prices from Timor-Leste. Final calculation of dimension for the concrete structure from preliminary design are : Beam and , Column and Plate for ground and first floor. And the final cost estimation for concrete structure around and steel structure around , those two structure show that concrete structure is economical than steel structure.
The Impact Of Lifestyle, Brand Awareness, Product Quality, On Purchasing Decisions And Repurchase Intention Julianti Fernanda Pasaribu; Santirianingrum Soebandhi; Joko Suyono; Damarsari Ratnasahara Elisabeth
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.127

Abstract

A large number of Indonesian people who live a healthy lifestyle makes organic agricultural products increasingly in demand because they have the best quality and health. Indonesia is a country that has a large population and is one of the countries that has an area of ??organic farming. Business people see the existence of organic food business opportunities to present products that are in line with market desires and stick to the hearts of consumers. Therefore, this study was prepared to analyze the impact of Lifestyle, Brand Awareness, and Product Quality on Purchasing Decisions and Repurchase Intention. This research is a quantitative research with a survey approach that uses a questionnaire of 100 respondents from consumers who buy organic products at the Surabaya Supermarket. The analysis technique used to prove the hypothesis is Partial Least Square (PLS). These results indicate that Lifestyle, Brand Awareness, Product Quality have a significant effect on Purchasing Decisions, and Purchasing Decisions have a significant effect on Repurchase Intention.
Analysis Of Toll Gate Traffic Delay Time Using E-Toll System On Waru-Juanda Toll Road Rhyans Harkanas Anugerah Wicaksana; Sri Wiwoho Mudjanarko
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.128

Abstract

Currently the traffic on the highway is getting crowded, because it filled with so many four-wheeled vehicles. To reduce congestion at the highway then be made to the motorway. But the government's efforts to maximize the use of toll roads to minimize congestion in fact, has not run optimally for payments using the system to pay cash (cash) is less effective. In 2017 PT. Margatama image Surabaya implement E-Toll at the toll booth Waru - Juanda. To find out how the effectiveness of the use of E-Toll system was conducted research to analyze traffic toll gate delay time with the e-toll system on toll roads hibiscus - juanda. Collecting data in this study conducted on Friday at 4:00 p.m. to 20:00 pm and is located at the toll gate Menanggal. The variables used were manual payment system / cash and payment systems using E-toll by noting the number of vehicles entering the toll gate along with the time needed to conduct transactions at toll booths. From the research conducted, the average time delay that is required at the time for using the E-Toll Card was 13.6 seconds / transaction so that they result in queues at toll gates. From these results it can be concluded that the use of E-Toll card is still not effective in reducing congestion at toll booths. The average time delay that is required at the time for using the E-Toll Card was 13.6 seconds / transaction so that they result in queues at toll gates. From these results it can be concluded that the use of E-Toll card is still not effective in reducing congestion at toll booths. The average time delay that is required at the time for using the E-Toll Card was 13.6 seconds / transaction so that they result in queues at toll gates. From these results it can be concluded that the use of E-Toll card is still not effective in reducing congestion at toll booths.
Flood Control On Secondary Sub Catchment Cerme Kidul In Drainage Systems Of Primary Canal Cerme Kidul kec. Cerme kab. Gresik Muhammad Rangga Setya; Adi Prawito
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.129

Abstract

Cerme District is located in South Gresik area which has an area of 71.73 km2. This area is located above the height of ± 4m sea level. While the slopes of the Cerme District are in the range 0-2% with a slope to the north. The land-use plan map of Cerme sub-district should be designated as an industrial area and residential area which is still inundated at several points. One of these puddles is in the left-hand cerme drainage system, especially in the secondary sub-catchment cerme kidul. The inundation height is between 20-30cm with inundation ± 2-4 hours. This final project can find out the results of the planned debit calculation using existing land use and land use plans, the difference in the calculation of the debit reaches 60%. While the calculation of canal capacity using planned land use can be known that 2 "safe" and 8 channel segments "need normalization".
Risk Management Of EPC (Engineering Procurement Construction) “Siberut Agregated Biomass Gasification Power Plant” Project in Civil Engineering Design Stage Erma Damayanti; Ronny Durrotun Nasihien
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.130

Abstract

The Construction of EPC (Engineering, Procurement, Construction) Siberut Aggregated Biomass Gasification Power Plant is the first power plant project in Indonesia that uses bamboo as fuel to produce electricity. Judging from the complexity of the project, it is necessary to carry out risk management for the identification and detailed analysis of the risks or uncertainties that occur in the project, especially the design engineering stage. This study uses interview methods and surveys that are implemented in the google form questionnaire to make it easier for respondents to assess risks provided. Risk assessment uses a Likert scale to determine the level of probability and impact. Next step is risk mapping to determine mitigation efforts. There are 15 independent risk variables and 1 variable risk binders obtained from interviews and literature studies. It is known that 6.67% of the risk is included in the criteria of low risk (minor risk), 73.33% of the risk is included in the criteria of moderate risk (high risk), and 20% of the risk is included in the criteria of high risk (extreme risk). From the data projected onto the risk treatment table so that the results of 6.67% risk are acceptable (acceptable), 20.00% risk is unacceptable, 73.33% undesirable risk. Risk mitigation for 16 identified risks comes from detailed specification issues, incompatibility and implementation of drawing, and multitasking engineering resources. Most risk ownership is directed to the implementing contractor, but not limited to the owner, subcontractor, planning consultant, and supervisory consultant.
Planning Of Wastewater Treatment Plant (WWTP) Analysis: (Case Study in Condominium Pasir Putih View Hotel - Situbondo) Putri Ermadani; F Rooslan Edy Santosa
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.131

Abstract

Increasing population and household growth cause the need for housing to shift to urban areas and develop into multi-story housing such as condominiums, apartments and so on as a result of urbanization. Pasir Putih View Condominium Hotel - Situbondo (Condotel) is one of the real indicators of the economic, social and cultural progress of the people in a region. The construction of the Condominium Hotel (Condotel) project requires careful planning in terms of structure, architecture, and also mechanical electrical plumbing. Building planning, especially on mechanical electrical plumbing (MEP) must be adjusted to the number of guests or people who are in the condotel area. One of them is planning the Waste Water Treatment Plant (WWTP) which will be recycled and used for one of the condotel requirements. This WWTP plan starts with determining the total clean water requirements and the total flushing needs needed. The method of data analysis is done by calculating the total water discharge planning needed and the results from the dimensions of the WWTP space needed. The results obtained are in the form of the calculated discharge volume and WWTP space data which is accompanied by shop drawing images in which a comparison of the old design with the new WWTP design. The discharge volume of the total clean water requirement obtained from the calculation is 179.04 m3. The calculation for the dimensions of the WWTP space needed is 13.5mx5mx4m. From the type of WWTP, the time to treat wastewater into environmentally-friendly (non-consumption) water can be 50% faster. WWTP type planning is done to produce more efficient planning of the WWTP that had been planned by the previous consultant while not ignoring security factors
Analysis Of Comparison Of Cost And Time Implementation Of Road Projects Using Methods Time Cost Trade Off: (Case Study : Napoleon Road “Rumah Apung” Bangsring Village, Wongsorejo District, Banyuwangi Regency) Suciati Puji Rahayu; M ikhsan Setiawan
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.132

Abstract

Maintenance project Napoleon road “Rumah Apung” in bangsring village of Wongsorejo subdistrict Banyuwangi. In the implementation of this project there were delays in some jobs, namely ordinary excavation, pavement exavation is paved without cold milling machine, and fc’ 25 Mpa quality concrete. So that it can affect other activities. One way to anticipate delays is by accelerating using the Time Cost Trade Off method, through alternative hours of work (overtime) for 3 hours on the first 3 days of work and the addition of labor for the first 3 days of work commenced. The result of the analysis of the two alternatives in this study obtained results for ordinary excavations with the addition of working hours (overtime) for 3 hours in the first three days of work started to obtain project cost efficiency of Rp. 5.537.232,- from the normal cost of Rp. 6.523.171,20,- compared to the addition of labor. Whereas paved pavement excavations without cold milling machines have a 9 day efficiency period from the normal duration of 12 working days and a cost efficiency of Rp. 2.412.000,- from the normal cost of Rp. 3.216.000,- compared to the additional hours of overtime work. For fc’ 25 Mpa quality concrete work, efficiency at normal project costs and time is 12 working days with normal costs Rp. 3.040.950,816,- in addition to working hours (overtime).

Page 8 of 27 | Total Record : 265