cover
Contact Name
Resista Vikaliana
Contact Email
resistav31@gmail.com
Phone
-
Journal Mail Official
logistikindonesiajournal@gmail.com
Editorial Address
-
Location
Kota adm. jakarta pusat,
Dki jakarta
INDONESIA
Jurnal Logistik Indonesia
ISSN : 25798952     EISSN : 26216442     DOI : -
Core Subject : Science, Social,
Jurnal Logistik Indonesia is one of the scientific publications published by Study Program of Logistics Management, Faculty of Social Science and Management Institut Ilmu Sosial dan Manajemen STIAMI. The purpose of the Journal is to support development logistic management theory and practice in Indonesia through the dissemination of research findings in the field. The journal covers fields such as Knowledge and People Management, Operations and Performance Management, Business Risk, Entrepreneurship, Strategic Business, Supply Chain Management and Decision Making and Strategic Negotiation.
Arjuna Subject : -
Articles 8 Documents
Search results for , issue "Vol. 7 No. 1: April 2023" : 8 Documents clear
Location Design of GIS-Based Temporary Evacuation Sites (TES) by Considering the COVID-19 Pandemic Situation: A Case Study in Padang City) Liperda, Rahmad Inca; Sukarno, Iwan; Yenda, Natasha Utami Syave
Jurnal Logistik Indonesia Vol. 7 No. 1: April 2023
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v7i1.3265

Abstract

Padang City is an area that is predicted to occur in the Mentawai Megathrust disaster. In dealing with these potential disasters, proper planning is needed to reduce the impact of disasters. The exact location of the Temporary Evacuation Sites (TES) will affect the safety level of the community. However, based on the current situation, the COVID-19 pandemic adds to the complexity of disaster management. Therefore, anticipatory steps are needed to prevent the spread of disease in the environment. This study aims to design a TES location-allocation to deal with the potential Mentawai Megathrust disaster in Padang City by adjust to physical distancing health protocols. Determination of the location-allocation in this study is using Network Analysis extension namely Maximum Capacitated Location Problem (MCLP) in Geographic Information Systems (GIS). In addition, this study uses an evacuation time scenario with an interval of 3-30 minutes consisting of two different scenarios involving the use of community response times to disasters. The location-allocation results consist of four results based on the scenario of evacuation time and the addition of Proposed TES. Based on the location-allocation results, with the addition of Proposed TES, the maximum number of people that can be accommodated is only around 34-39 percent in both evacuation scenarios. This shows that there is a need for further design related to both Existing TES and Proposed TES so that the percentage of the number of people who can be accommodated can increase.
Increasing Productivity Using Define, Measure, Analyze, Improve, Control (DMAIC) at PT. XYZ (a Case in Indonesian Company) Kurniawan, Adji Candra; Maula, Fiki Rohmatul; Rachmawati, Nur Layli
Jurnal Logistik Indonesia Vol. 7 No. 1: April 2023
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v7i1.3308

Abstract

The productivity level of PT. XYZ is still below the target, especially in the batch area. This condition is proved by the Overall Equipment Effectiveness (OEE) value is about 58% based on January and February data. Taking this into account, it is necessary to conduct further research to determine the causes. This study aims to increase productivity in the raw material warehouse and pre-batch areas. To solve this problem we use a six-sigma with DMAIC method because these methods can determine the root cause of the problem and provide appropriate recommendations for improvement systematically. The results show that the application of the kanban system in the pre-batch area and reuse of rack in the pre-batch area can increase the average OEE batch value from 58% to 64%. The increase in productivity tn the raw material warehouse and pre-batch area affects Adherence to Plan (ATP) value from 86% to 91,15%.
Analysis of Avtur/Jet A-1 stock resilience at XYZ Company Setiaji, Efraim Dandy Pandawa; Pratama, Ibnu Lukman
Jurnal Logistik Indonesia Vol. 7 No. 1: April 2023
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v7i1.2885

Abstract

AY Airport is an international airport that continues to operate every day. The need for aviation fuel or Avtur is always needed and not in small quantities. The condition of the Covid-19 pandemic, which requires X Company to meet fuel needs regardless of the circumstances, is a challenge for X Company. With current conditions that are always changing, an analysis of stock resilience was carried out at the Avtur storage tank facility in 2018-2022 to identify the coverage of days that Y Depot the regulations issued by BPH Migas and Pertamina Aviation. The results stated that stock resilience was at a good level during the pandemic with resilience above 9 days, and some stocks were declared critical in the pre-pandemic period.
Analysis of Spare Parts Inventory Control Using Economic Order Quantity (EOQ) Method at PT Astra International Tbk. Toyota Sales Operation AUTO2000 Bogor Siliwangi Noorzaman, Sandi; Kartikasari, Maya Andini; Abdi, Muhammad Danawan Esa
Jurnal Logistik Indonesia Vol. 7 No. 1: April 2023
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v7i1.3347

Abstract

Along with the development of the current technological era is developing very quickly, one of which is land transportation, especially four-wheeled vehicles. From year to year vehicle technology is increasingly advanced so that it attracts people to have use for transportation or goods transportation purposes. However, along with its use, the vehicle needs regular maintenance so that it is always in prime condition and safe when driving. Therefore, companies engaged in vehicle maintenance and repair services need to prepare for the availability of spareparts to meet the needs of their customers. The type of research used is descriptive research. The data used in this study consists of primary data and secondary data that are qualitative in nature related to spareparts inventory. By using the EOQ method the company can save the total cost of inventory for tmo syn 10w-40sn 1lt around 85% or Rp. 2,652,961, tmo syn 10w-40sn 4lt about 89% or Rp. 2,774,200, element sa oil filter around 95% or Rp. 2,904,527, pad kit disc brake fr around 90% or Rp. 1,631,944 and 34b19r hybrid battery around 88% or Rp. 1,202,923.
Probability Analysis for Waqf Fund as A Support Disaster Logistic Financing Faza, Iqbal; Sekarningtyas, Hikmah
Jurnal Logistik Indonesia Vol. 7 No. 1: April 2023
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v7i1.3116

Abstract

Waqf is one of the Islamic social institutions that is highly recommended in Islamic teachings to be used by a person as a means of channeling the sustenance given to him by Allah. Waqf is also one of the instruments to create justice and prosperity in the economic field. When the waqf has been fulfilled, there is a change in ownership from private to community ownership which is expected to be lasting and provide sustainable benefits.On the other hand, Indonesia also has major challenges in the field of disaster mitigation. With all its natural potential, Indonesia has enormous disaster risks. The risk will always be there forever. For this reason, it is necessary to have an instrument that can be used at any time in the entire disaster management process. This potential is in waqf funds. This research tries to explore the possibility of waqf funds to be used as a means of disaster management, especially in terms of financing the procurement of disaster logistics during emergency response, recovery, rehabilitation and reconstruction which requires very large costs.
Reduction in Damage of Goods Through Review on The Process of Shipping Goods in A Logistics Transportation Company Maulani, Syifa Fajar; Istiqomah, Farah; Safitri, Reny Eka; Mauluddin, Fikri Muhammad; Maldini, Muhammad Hilal; Nurzahran, Arkan
Jurnal Logistik Indonesia Vol. 7 No. 1: April 2023
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v7i1.3172

Abstract

Pada era industrialisasi modern seperti saat ini perusahaan jasa pengiriman barang sangat memerlukan proses yang efektif dalam rangkaian aktivitasnya untuk memperlancar pendistribusian barang. perusahaan jasa pengiriman barang diharuskan untuk lebih memperhatikan aspek-aspek seperti kualitas, biaya dan juga waktu. Dalam suatu perusahaan logistik adanya kerusakan barang merupakan hal yang sangat mungkin terjadi. Seperti halnya yang terjadi di PT XYZ. Jika kerusakan tersebut di kemudian hari berkemungkinan akan terjadi maka hal itu dapat menyebabkan penurunan kualitas pelayanan perusahaan yang bisa mengakibatkan kerugian bahkan kehilangan pelanggan. Untuk itu dilakukan upaya dalam meminimalisir kerusakan barang saat pengiriman. Berlandaskan uraian-uraian tersebut adanya penelitian ini bertujuan untuk mengetahui bagaimana alur pengiriman dalam PT XYZ dan bagaimana upaya ataupun cara mereduksi kerusakan barang pada pengiriman di PT XYZ. Penelitian ini menggunakan metode penelitian kualitatif deskriptif dengan pendekatan studi kasus. Hasil penelitian menunjukkan bahwa dalam mereduksi kerusakan barang dalam proses pengiriman barang pada PT. XYZ dapat diminimalisir dengan tersedianya perangkat dan sistem terintegrasi berupa Driver Management System (DMS), Transportation Management System (TMS), Fleet Management System (FMS) serta adanya sistem ODDO, yaitu sebuah sistem ERP (Enterprise Resource Planning) yang membantu mereka mengatur operasi rantai pasokan, perawatan, dan proses akuntansi. Selain dari hal tersebut, perusahaan transportasi logistik dengan customernya terlebih dahulu membuat perjanjian kesepakatan kerjasama bisnis sebagai antisipasi jika nantinya ada sesuatu yang merugikan kedua belah pihak. Adapun rekomendasi yang peneliti sarankan untuk perusahaan yaitu melakukan pemasangan bantalan (dunnage) agar barang tidak bergeser ketika dalam perjalanan.
Application of Analytical Hierarchy Method in Selection of Raw Material Suppliers at PT Integrated Services Claims Setiawan, Endra; Irwansyah, Irwansyah
Jurnal Logistik Indonesia Vol. 7 No. 1: April 2023
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v7i1.3684

Abstract

Raw material prices are an important concern for companies in creating cost efficiencies. Price is one of the purchasing considerations, prices that are too low make buyers doubt the quality of goods to make purchases and vice versa, prices that are too expensive make buyers switch to other vendors. PT. Klaai Integrated Services is a company engaged in the catering industry that serves several large companies in Bekasi Regency such as PT. Unilever Indonesia, PT. Astra Honda Motor, PT. Suzuki Indomobil Motor, PT. Kalbe Farma, Tbk, PT. Yasulor Indonesia and others. PT. Integrated Services Claims are very selective in vendor selection. The high frequency of changing vendors every month was allegedly influenced by price differences between several vendors, so the company took the initiative to switch to vendors with more competitive prices. This study aims to determine the priority order of criteria and suppliers to be selected for purchasing raw materials at PT Klaai Jasa Terkomunikasi. This research is a descriptive research with the method approach used, namely descriptive qualitative and quantitative research. Data collection was carried out by observing, interviewing and distributing questionnaires by means of data analysis using the AHP approach. The results of this study indicate that the most influential criteria in the selection of wood suppliers at PT Klaai Jasa TerIntegrated are quality criteria with a weight of 0.486, while for the second priority, namely price criteria with a weight of 0.371, and delivery accuracy is the third priority with a weight of 0.143.
Application of the Six Sigma Method to Overcome Stock Warehouse Difference at PT United Tractors Ramanta, Dhimi Yoga; Hidayat, Yusup Rachmat
Jurnal Logistik Indonesia Vol. 7 No. 1: April 2023
Publisher : Institut Ilmu Sosial dan Manajemen Stiami

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31334/logistik.v7i1.3454

Abstract

PT. United Tractors has a warehouse to support its business activities, storing goods in the warehouse. Problems that often occur in warehouses are stock differences and actual goods not matching the system. The aim of this research is to find the cause of the problem and overcome it. Six Sigma method with DMAIC (Define, Measure, Analyse, Improve, Control, and Evaluation) stages Used to overcome warehouse stock discrepancy problems. The subject of this research is a case study at PT. United Tractors East Jakarta. The dependent variable in this research is the Six Sigma method, and the independent variable is the difference in warehouse stock. The data used in the research are field studies and observations carried out in the PT warehouse. United Tractors East Jakarta The results of this research use the Six Sigma method to determine inventory control over stock discrepancy problems by going through stages. obtained results of 4 causes of stock discrepancy problems; the measurement stage looked for the highest percentage of values causing stock problems; from the high percentage results, the factors causing stock discrepancy problems were analysed; proposals for improvements were made that could have a good impact; and a monitoring stage was made of the factors causing stock discrepancy problems.

Page 1 of 1 | Total Record : 8