cover
Contact Name
Dwi Muryanto
Contact Email
dwi.muryanto@unitomo.ac.id
Phone
-
Journal Mail Official
jurnalgestram@unitomo.ac.id
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil
ISSN : -     EISSN : 26157195     DOI : http://dx.doi.org/10.25139/jprs
Core Subject : Engineering,
Ge-STRAM journal published 2 (two) times a year in March and September. This journal presents scientific articles on the results of research, scientific studies, analysis and critical review of the problems closely related to the field of civil engineering. The manuscript will be received by the editor to be assessed for the feasibility and technical substance of its writing by Bestari Partners and the Board of Editors. The editorial board is authorized to accept or reject the submitted manuscript.
Articles 201 Documents
Analisis Kerusakan Jalan Menggunakan Metode PCI Dan Metode Bina Marga (Studi Kasus Jalan Ahmad Yani Kecamatan Kapas Kabupaten Bojonegoro) Santosa, Rudy; Sujatmiko, Bambang; Krisna, Fajar Aditya
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 4 No. 2: September 2021
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v4i2.4196

Abstract

Roads are an important infrastructure in transportation that can affect the progress of the economic, social, cultural, and political fields in a region. However, the planned age of the road is not in accordance with what is happening in the field. The purpose of this study was to assess the pavement condition of Jalan Ahmad Yani, Kapas District, Bojonegoro Regency. The method used in this study is a qualitative and quantitative method which refers to the PCI (Pavement Condition Index) method and the Bina Marga method. Jalan Ahmad Yani, Bojonegoro Regency, with a length of 2.6 km is divided into several segments with a size of 200 x 7.5 m per segment. Each segment is evaluated by measuring the dimensions, identifying the type and level of damage to obtain the PCI value and the Bina Marga value. The results showed that there were 6 types of damage, including Patching and Utility cut Patch damage of 29.20%, Potholes of 17.88%, Weathering and Raveling of 6 .20%, Polished Aggregate 6.57%, Meandering Crack 25.91%, and Alligator Cracks 14.23%. For the assessment of the condition of Jalan Ahmad Yani, Kapas Subdistrict, Bojonegoro Regency using the Bina Marga method and the PCI method, it turned out that the results were relatively similar, the PCI method resulted in a more detailed assessment with "GOOD" results by means of periodic handling, while the Bina Marga method resulted in an assessment which is better with the results of "Priority 7" where the way of handling these priorities is by means of routine maintenance. Therefore, it can be concluded that the road damage assessment method is recommended using the PCI method. Meanwhile, the types of maintenance that can be carried out to improve the service level of the road include adding additional layers, repairing and adding drainage, filling cracks with hot mix asphalt, and patching any damage to prevent it from spreading.
Alternatif Desain Struktur Gedung Rumah Sakit Royal 7 Lantai Surabaya Menggunakan Struktur Baja Dengan Analisis Autodesk Robot Rian Rivaldo Markus; Bantot Sutrisno
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.4755

Abstract

The need for facilities and infrastructure is very large, one of which is the health sector. And the availability of land in the city of Surabaya is getting less and less, this is the reason why building in the city of Surabaya is built multi-story as an example in the construction of the Royal Surabaya Hospital. The construction project of the Royal Surabaya Hospital building has a building area of ±1,920 m2, consisting of 6 floors and 1 roof. In this project, it was previously designed with a reinforced concrete structure and then redesigned using a WF steel structure. In the preparation of this final project, reviewing alternative steel structure designs using seismic provisions for steel buildings SNI 7860: 2020 and calculation of deviations using Autodesk Robot structure analysis with loading referring to SNI 1726: 2019. For design purposes, a nominal load should be taken based on the load set by the loading planning guidelines for houses and buildings PPIUG 1987. Based on the results of an alternative study of the structural design of Royal Surabaya Hospital using a profile steel structure, it can be concluded as follows: From the calculation of the material price of the steel beam-column structure of Rp.7,307,850,000 and the volume of the material price of the existing concrete beam-column structure rp.8,332,012,800, it can be concluded that the steel structure is more economical than the existing concrete structure with a price difference of Rp.651,500,000 and a percentage of 8%.
Pengaruh Jenis Tanah Terhadap Simpangan Lateral Gedung Beton Bertulang Dermawan Zebua; Leonardus Setia Budi Wibowo
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.4901

Abstract

As has happened in various cases of earthquakes, the impact caused by each earthquake event varies, because the earthquake shaking that occurs on the ground is not only influenced by the distance and strength of the earthquake, but also by local soil conditions which are related to the amplification phenomenon. earthquake waves are influenced by the type and thickness of the soil/sediment layer above the bedrock. Reinforced concrete storey buildings are designed to withstand both vertical and horizontal loads. The taller the building, the greater the lateral load that will be received by the building structure. In the design of earthquake-resistant structures, the inelastic behavior of the structure is highly expected for the occurrence of earthquake energy dispersion during both moderate and strong earthquakes. In earthquake-prone countries such as Indonesia, it is required to comply with applicable national standards and the structure can still function and be safe from earthquakes affected by the earthquake. The purpose of this study was to determine how much influence the type of soil has on the lateral displacement of a 10-story reinforced concrete building using shear walls in accordance with earthquake building regulations (SNI 1726, 2019) and loading (SNI 1727, 2020). The results obtained that soft soil types have the largest deviation value with a value of 91,831 mm and hard rock soil types have the smallest deviation value with a value of 44,114 mm.
Analisis Kebutuhan Luas Apron dan Terminal Penumpang Bandara Internasional Lombok untuk Menunjang Kegiatan Pariwisata serta Kawasan Ekonomi Khusus (KEK) Adita Utami; Muhammad Tjipta Rafie Rahmanditya
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.4945

Abstract

This study discusses the needs of passenger terminals and aprons at Lombok International Airport in the next 10 years, namely 2032 taking into account the conditions of the covid-19 pandemic with the aim of predicting the needs of passenger terminals and aprons of Lombok International Airport with the potential for tourism and Special Economic Zones. The method used is a combination of time series and econometric analysis to perform forecasting. This study was conducted using 2 scenarios in the analysis of the calculation of apron needs. The results of this study are in the form of the capacity of the existing apron able to serve peak hour conditions with 24 operations / hour. Based on forecasting in 2032, it is predicted that there will be 42,236 aircraft movements with a peak hour volume of 27 operations /hour and there will be 4,688,824 passengers with a peak hour volume of 1,904 people. then, there will be an expansion of the apron area for scenario 1 of 552 m2 with 17 parking stands and scenario 2 of 26,514 m2 with 23 parking stands and expansion of the passenger terminal facility area.
Analisa Tingkat Kepuasan Penumpang Terhadap Pelayanan Kereta Api Kelas Eksekutif Bima di Stasiun Gubeng Pada Saat Penerapan New Normal Aulia Syavila; Nugroho Utomo
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.5004

Abstract

The entry of the Covid-19 virus in early 2020 in Indonesia has changed the order of people's lives. One of the sectors affected by the Covid-19 outbreak is rail transportation. The existence of the Covid-19 virus has resulted in a decrease in the number of train passengers at Gubeng Station. One of the trains that is ready to be operated again by implementing the Covid-19 prevention protocol in the implementation of the New Normal is the Bima Executive Train. Bima Executive Train is an executive class train with a relation of Surabaya Gubeng Station - Gambir Station. In this study, an analysis will be carried out using the Importance Performance Analysis (IPA) method. This research is a type of descriptive-quantitative research. The population of this study was passengers who used the services of the Bima Executive Train at Gubeng Station. Based on the results of data processing and analysis, the value of the level of conformity between the performance value and expectations at the time of the implementation of the New Normal at Gubeng Station and at the Bima Executive Train was as follows: at Gubeng Station, the largest level of conformity value was 97.56%, namely speed and accuracy in the train departure schedule. Meanwhile, in the Bima Executive Railway, the largest level of conformity value is 98.19%, namely the accuracy of officers in providing information related to train travel disturbances. The average value of the service attributes that describe the level of passenger satisfaction at Gubeng Station, in general reflects the level of satisfaction or excellent quality of service. This is evident from the 25 service attributes that have a value of 4.09, namely "satisfactory". Meanwhile, in the Bima Executive Train, in general, it reflects a very good level of satisfaction or quality of service. This is evident from the 20 service attributes that have a value of 4.14, namely "satisfactory".
Studi Pemilihan Moda Transportasi Kereta Api Ekonomi Lokal Kertosono Dan Kereta Api Dhoho (Rute Surabaya – Kertosono) Leny Jely Anggraini; Nugroho Utomo
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.5007

Abstract

In Indonesia, services in the transportation sector are one of the things that must be considered. Transportation services and regulations will change over time. One example of proof of service changes, especially in this pandemic era, can be shown by PT. Indonesian Railways, which has implemented all trains using AC facilities, has restricted visitors from entering stations, implemented health protocols, and brought order to street vendors. From these changes, each mode of transportation, especially the local Economy Train Kertosono and Dhoho Train, has different characteristics in terms of travel time, fares, departure times, and others. Travelers will always have their own choice of transportation mode. To find out the probability value of the selected transportation mode, it is necessary to conduct a survey of the factors that will be reviewed by travelers who use the Kertosono Local Economy Railway and Dhoho Railway to Surabaya – Kertosono transportation modes by distributing questionnaires and using the Stated Preference method. Based on the results of research regarding the selection of transportation modes between the Kertosono Local Economy Train and the Dhoho Train which were analyzed using the Microsoft Excel program, significant results were obtained on the magnitude of the probability value of choosing a mode of transportation based on the difference in ticket prices of Rp. 2,000,- then the probability value of PKAD is 0.63 and the probability value of PKAE is 0.37. While the value of the probability of choosing a transportation mode based on the difference in travel time is -7, the probability value of PKAD is 0.65 and the probability value of PKAE is 0.35.
Perbandingan Karakteristik Marshall Aspal Karet (Natural Rubber Modified Asphalt) Dan Aspal Penetrasi 60/70 Pada Campuran Asphalt Concrete - Wearing Course (AC-WC) Menggunakan Aggregat Lokal Madura Taurina Jemmy Irwanto; Nurul Lia Suryani; Sendika Renaldi
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.5168

Abstract

Road damage in Indonesia is generally caused by excessive loading. One type of hot asphalt that receives the load directly from the vehicle is AC-WC (Asphalt Concrete - Wearing Course), ACWC. to hot mix asphalt and to reduce production costs and asphalt layer strength. natural rubber asphalt mixture for road asphalt can increase asphalt pavement in terms of service life and resistance to grooves, asphalt has a better pavement level, is not easy to leave wheel tracks when asphalt is wet, and has higher durability than ordinary asphalt. This will determine the longevity of the pavement. Based on this explanation, the use of local materials is expected to reduce production costs and reduce the traffic load of the road network that has been passed to transport materials from outside the island of Madura. In this further research, we will study the comparison of the use of Natural Rubber Modified Asphalt and 60/70 penetration asphalt using Madura local aggregates against the AC-WC hot asphalt mixture, which is expected to produce hot asphalt mixtures made from local and natural materials so that they have strength. the good one. From the test results on all types of mixtures, the optimal mixture was obtained at 4.9% asphalt content with the highest stability value of 1040 kg with a VIM value of 4.43%, VMA 15.91%, VFB 72.12%, MQ 300Kg/mm, and the density value is 2.252 gr/cc.
Analisis Consumable Dan Biaya “Manual Cutting Oxy-Lpg” Pelat Kapal Dengan Variasi Posisi Pemotongan Bagus Aditya; Tri Agung Kristiyono; Intan Baroroh
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.5193

Abstract

Manual Cutting is part of the process in ship building and ship repair. Oxy-LPG gas is widely used in the process of cutting plates with manually or automatically method. In the process cutting of plates in ship repair, the cutting position are Down Hand, Vertical and Overhead in cause the gas consumable and cutting duration proces are still not widely known numerically. In improving the data, a survey and initial study are needed as a support, so to obtain standard data for manual plate cutting numerically, plate cutting experiments are carried out in several variations in position and plate thickness variations. The results of the equation in manual plate cutting Downhand obtained Y=43,667x-43 (Duration), Y=0.0875x-0.2833 (O2) and Y=0.051x-0.0922 (Lpg). Vertical Y=34,667x-9,333 (Duration), Y=0,1042x-0.3778 (O2) and Y=0,0608x+0,1033 (Lpg) while Overhead Y=33.667x+28,111 (Duration), 0, 0792x+0.0922 (O2) and Y=0.1008x-0.2433 (Lpg). For the cost analysis, it was found that the cost increase was 8.49% based on the function of the increase in plate thickness. If it is based on the position function, the average cost increase is 10.55%.
Analisis NRW pada Perumda Air Minum Tirta Mangutama Kabupaten Badung I Wayan Adi Sudiatmika
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.5296

Abstract

The percentage of Non-Revenue Water (NRW) at PAM Tirta Mangutama from 2016–2021 is far above the maximum tolerance of 20% and even tends to increase every year. The increasing percentage of NRW causes the performance of PAM Tirta Mangutama to decline. The increase in the percentage of NRW causes a decrease in water pressure at the customer, discontinuity of service to customers, low service coverage, and lower income for PAM Tirta Mangutama. For this reason, research was carried out using the administrative product compilation method and descriptive analysis was carried out. The study was carried out in order to identify the causes of the high percentage of NRW and to provide recommendations for policies and appropriate strategies for PAM Tirta Mangutama Badung Regency in order to control the high level of water loss. In 2020 and 2021, the cost of water with real NRW will be higher than the cost of water in effect at that time, so that in 2020 and 2021 PAM Tirta Mangutama cannot meet the full cost (unfull cost recovery). Based on the water balance in 2021, non-physical and physical water losses are far greater than water losses based on unbilled official consumption. Efforts to suppress the high percentage of NRW require strategic steps that are grouped into 3 programs, namely: short-term, medium-term, and long-term programs.
Pemanfaatan Limbah Pecahan Keramik Dan Kapur Sebagai Bahan Pengganti Sebagian Semen Pada Produksi Paving Blok Ditinjau Dari Nilai Kuat Tekan Dan Penyerapan Air Aldi Setiawan; Mohammad Saifuddin; Ragil Arman Maulana
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 6 No. 1: March 2023
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v6i1.5680

Abstract

Along with the rapid development of neighborhood and residential roads in Pamekasan, it has an impact on increasing the use of paving bloks for roads and residential yards. With the large number of needs, it has an impact on the need for paving blok materials, namely cement and aggregate, so a substitute material is needed to reduce dependence on the use of the main material. One of the substitute materials that can be used is the utilization of ceramic and lime waste which has not been used so far. The use of crushed ceramic shards and lime as a partial replacement of cement is expected to have an effect on the compressive strength of paving bloks. Utilization of ceramic and lime shard waste is expected to provide the latest innovations in the world of construction going forward. In this test, it is planned to pave a rectangular blok measuring 21x10.5x6 cm, and tested at the age of 7 days and 28 days on each variation of the mixture. %, and 25% replacement of cement with ceramics and lime. From the results of testing the chemical content of ceramics, it was found that the lime (CaO) content was 5.95% and the chemical content of the lime was found to have a lime (CaO) content of 50.84%. The results of the compressive test for each variation resulted in an increase in compressive strength from each variation. The greatest addition of compressive strength was found in the 20% variation with the resulting compressive strength of 30.35 Mpa at the age of 7 days, and 31.18 Mpa at the age of 28 days.