cover
Contact Name
Dwi Muryanto
Contact Email
dwi.muryanto@unitomo.ac.id
Phone
-
Journal Mail Official
jurnalgestram@unitomo.ac.id
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil
ISSN : -     EISSN : 26157195     DOI : http://dx.doi.org/10.25139/jprs
Core Subject : Engineering,
Ge-STRAM journal published 2 (two) times a year in March and September. This journal presents scientific articles on the results of research, scientific studies, analysis and critical review of the problems closely related to the field of civil engineering. The manuscript will be received by the editor to be assessed for the feasibility and technical substance of its writing by Bestari Partners and the Board of Editors. The editorial board is authorized to accept or reject the submitted manuscript.
Articles 201 Documents
Optimasi Mobilitas Urban Melalui Perencanaan Komprehensif Dan Pendanaan Kreatif Untuk Jaringan MRT Di Surabaya Kusuma Haratama; Christian Hadhinata; Endro Wibisono
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 1: March 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i1.7883

Abstract

Surabaya is one of the largest metropolitan cities in East Java where the density of activity increases due to daily movement from surrounding cities. Congestion in the city of Surabaya, especially during peak hours, reaches alarming levels with the impact of air pollution and significant financial losses. Therefore, planning and financing rail-based public transportation, especially the Surabaya Mass Rapid Transit (MRT), is a solution that can have a direct and indirect positive impact on society, with a focus on route planning. Surabaya MRT route planning was based on 10 principles of reliable and efficient public transportation route planning, while a literature review was used to explore the potential for creative funding for the provision of these facilities. The research results show that five routes are needed to realize the Surabaya MRT service system with one central hub and five supporting hubs. Creative funding involving the private sector is recommended so as not to burden the State Budget
Analysis of The Relationship of Rework and Inventory to Waste in The Ciputra Hospital Surabaya Project Felicia Tria Nuciferani; Mukharom Dwi Anggara; Siti Choiriyah; Devi I Permatasari
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i2.7998

Abstract

The problem of material waste in construction projects will be difficult to avoid as it goes along with construction waste. One of the unavoidable problems in a construction project is repeating work or reworking. Rework will also affect the emergence of waste. In a series of construction project activities, inventory is always required to anticipate needs in the ongoing construction project process. Without an inventory, a construction project will encounter the risk that one day it will not be able to meet its needs. This research aimed to determine the correlation between rework and inventory to waste at the Ciputra Hospital Surabaya construction project. It employed a quantitative method by collecting data through a questionnaire distributed to 30 respondents in the project environment. Data analysis involved multiple linear regression analyzes and the SPSS 25 software program. The results of the t-test showed that rework partially had a positive effect on waste with a t-count value of 8.528, while inventory also had a positive effect on waste with a t-count value of 8.661. Simultaneous test results indicated that rework and inventory had a significant effect on waste, with an F-count value of 37.442. Keywords: Waste; Rework; Inventory
Penggunaan Abu Tempurung Kelapa Dan Kapur Hidrolis Sebagai Bahan Pengganti Semen Pada Mortar Geopolimer Beni Rizky Alfarisi; Anita Intan Nura Diana
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i2.8661

Abstract

This research aims to find out how to use coconut shell ash and hydraulic lime as a substitute for cement in geopolymer mortar. Geopolymer mortar is a type of mortar that does not use cement at all. Geopolymer is the answer to replacing cement, because cement production has a bad impact, namely that it can damage the environment. CO2 emission gas is not only produced in the process of making cement, but CO2 emission gas is produced when it is used in concrete mixtures. This research method is by comparing precursors, the ratio of precursor to activator. The precursors used in this research were coconut shell ash and hydraulic lime, while the alkali activators used were Sodium Hydroxide (NaOH) and Sodium Silica (Na2SiO3). The use of variations in coconut shell ash precursor with hydraulic lime is 50:50, 60:40, 70:30. Alkali variation of NaOH activator with Na2SiO3 is 50:50, while variation of precursor with activator is 70:30 and 80:20. The treatment method used in this research was in the oven at 60°C and left at room temperature.
Analisis Kualitas Aspal Pertamina Dan Aspal PG 70 Berdasarkan Uji Penetrasi Menggunakan SNI 2456-2011 Wibisono, R Endro; Yuantika, Risma
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A road must meet the criteria of being safe and comfortable for its users. One type of road pavement that is commonly used in Indonesia is flexible road pavement, where the main material of flexible pavement is asphalt. In this study, Pertamina asphalt and PG 70 asphalt were used, where the aim of this research was to determine the quality of these two asphalts. The method used in this research is laboratory testing in accordance with the SNI 2456 - 2011 penetration test guidelines. After testing, the penetration value for asphalt penetration was 61, while PG 70 asphalt was 48, which means that Pertamina asphalt is more flexible than PG 70 asphalt. The stability of the second This asphalt is not much different, but the stability of PG 70 asphalt is higher, which indicates that this asphalt is suitable for use in traffic with medium or heavy vehicle intensity. In Indonesia, the use of Pertamina asphalt is more dominant than PG 70 asphalt because Pertamina asphalt is asphalt oil produced by PT. Pertamina. Meanwhile, PG 70 asphalt is still rarely used because this modified asphalt has problems with the mixture. The two asphalt test objects have slight differences in appearance and texture. Petamin asphalt has a dark black, shiny appearance and a more flexible texture. Meanwhile, PG 70 asphalt is dark black in color but is no more shiny than Pertamina asphalt, apart from that, PG 70 asphalt has a harder texture.
Model Sebaran Dan Pemetaan Pembangunan Infrastruktur Kabel Fiber Optik Bawah Tanah Dengan Pendekatan SIG Di Kota Surabaya M.Ferry Suryazain; Ronny Durrotun Nasihien; Julistyana Tistogondo
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i2.8681

Abstract

Surabaya City has an area of 33,306.30 Hectares and is divided into 31 sub-districts 154 villages and other government work units, known as SKPD (Satuan Kerja Perangkat Daerah). Regional devices provide services to the community, in order to support this, an internet network and supporting devices are needed which are connected to the network infrastructure between SKPD or public areas. This network infrastructure is managed and built by DINKOMINFO (Dinas Komunikasi dan Informatika) Surabaya City. The Surabaya City Government until 2022, has a total length of fiber optic cable installed in Surabaya reaching 285,932.74 meters as well as thousands of supporting devices such as CCTV and network device boxes. However, manual mapping and data collection methods have limitations in efficiency and accuracy. For this reason, a digital map using Geographic Information System (GIS) with ArcGIS application is required. Digital mapping enables more detailed and accurate geographic data collection, storage and analysis. Genteng sub-district will be the object of research because it has the highest density of fiber optic lines, with a total of 119 cable lines with a length of 21,383.7 meters or 21.4 kilometers, 74 access points, 31 handhole points and 127 CCTV points. This research produces a distribution map with the nearest neighbor method including an access point distribution map with a value of 1.0 which means a random distribution model, a handhole distribution map with a value of 1.6 uniform distribution models and, a CCTV point distribution map with a value of 0.7 group distribution models. The results of this research are expected to help in understanding the importance of digital map creation in network infrastructure development.
Efektivitas Zona Selamat Sekolah di Jalan Taman Siswa, Sekaran, Kecamatan Gunungpati, Kota Semarang Sholahudin, Farhan Sholahudin; Bambang Haryadi; Sigit Arya Panuntun; Alia Safira, Reishya; Aviv Setiawan; Rohadatu Resty Auzia
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The installation of School Safe Zones on Taman Siswa Street is considered suboptimal, given that many road users still travel at high speeds and pedestrians, especially students, teachers, and the surrounding community, have not utilized the School Safe Zones facilities. The purpose of this study is to determine the effectiveness of School Safe Zones on Taman Siswa Street, particularly in the school areas of SD N Sekaran 1, SD N Sekaran 2, and MI Roudlotul Huda. The urgency of this research is to evaluate the installation of School Safe Zones on Taman Siswa Street, especially in the school areas of SD N Sekaran 1, SD N Sekaran 2, and MI Roudlotul Huda. The approach taken includes surveys of vehicle speed, pedestrian behavior, drop-off behavior, and road equipment facilities. The results of this study are expected to benefit road users, particularly pedestrians in the school areas, by enhancing safety and security when walking and crossing the street. Based on the analysis results, it can be concluded that the effectiveness at School Safe Zones locations is still inadequate, as many students are crossing improperly, and the behavior of escorts is also not ideal. Additionally, road users are still driving at high speeds despite the presence of School Safe Zones signage.
Analisis Pengembangan Kawasan Pesisir Sebagai Zona Konservasi Mangrove Wonorejo Surabaya Suning, Suning; Dwika Aditya Ananta
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i2.8717

Abstract

The Wonorejo Surabaya Mangrove Forest is located on the coast of Rungkut District and has an area of ​​36.9 Ha. The potential can be developed as a tourism-based ecosystem. The potential and existing problems are empirically related to the provision of public facilities, the need to rejuvenate tourist facilities, the need for tourism development, and the need to improve water environmental management. The aim of this research is to determine the existing conditions and the strategy for developing the Wonorejo Mangrove coast as a conservation zone. The research method used is descriptive qualitative with photo mapping techniques and SWOT analysis. The research results show that the existing condition of the Wonorejo Mangrove coast has a built-up land use of 14% and non-built land use of 86%. There are circulation facilities for two-wheeled and four-wheeled vehicles as one of the facilities for visitors. Availability of green open space in the form of playgrounds and other green open space spots such as parking areas for both two-wheeled and four-wheeled vehicles. The characteristics of existing buildings include roof shape, building texture and paint color. The tourist support facilities that are available are boat rides, playgrounds, toilets, entrance counters, culinary centers, information centers and research facilities on mangroves. Physically, the pedestrian path has a paving construction with a width of 4 m and a length of 18 m, as well as a jogging track area with a wooden construction with a width of 2 m and a length of 1,217 m. Signage is in the form of directional signs, directional signs and warning boards, as well as existing conservation in the form of mangrove and boesem areas. Policy implementation that can be carried out is the need to develop mangrove conservation and rehabilitation activities as tourism and research programs, repair and maintenance of supporting facilities, signage, pedestrian paths, enforce laws and regulations related to conservation areas, develop synergistic and sustainable waste management with industries such as PT. Unilever and parties who care about mangrove and environmental issues in order to maintain the sustainability of the Wonorejo Mangrove.
Pemodelan 3D Tekla Structure Pada Konstruksi Baja Project Warehouse Finish Good Dalam Proses BIM (Building Information Modeling) prasdiansyah, David; Ronny Durrotun Nasihien; Julistyana Tistogondo
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i2.8739

Abstract

The construction of the warehouse finish good uses steel construction, for accuracy and acceleration in fabrication of steel requires accuracy in the section of steel pieces, connections, accessories and bolt hole point spacing. Based on reviews in the field, all project parties need 3d results and building planning, which can estimate problems and determine what methods will be used in the implementation in the field. In this Warehouse Finish Good project, development planning uses 2 BIM-based software for steel structures using the Tekla Structure program and for planning earthquake-resistant steel buildings using the SAP 2000 program. The purpose of this research is to study BIM (Building Information Modeling) based technology with the Tekla structure implementation method, the results obtained from the implementation can be 3d modeling and can find out the material requirements that will be used where BIM (Building Information Modeling) is very useful for the field implementation process and can also be a discussion material for all project-related teams to determine the work methods to be used.
Analisis Kepuasan Penyedia Terhadap Penerapan Prinsip Efisien, Efektif, Transparan, dan Terbuka Pada Pengadaan Konstruksi Pemerintah di Kabupaten Manggarai Sandi, Patrisius Valdoni; Kaur, Ewaldus Onesiaus; Handayani, Lulu
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i2.8742

Abstract

Supplier satisfaction in Public Procurement (PBJP) can significantly impact project execution quality, efficiency and productivity, reputation and long-term relationships, innovation, and risk management. This is especially important in Manggarai Regency, where construction projects often focus on accessibility and connectivity. Therefore, an analysis of supplier satisfaction with the application of efficient, effective, transparent, and open principles in government construction procurement is needed to determine priority improvements for the existing indicators within these principles. The results of the suitability level analysis (Tki) show a suitability value of 96.79% between performance and importance in applying efficient, effective, transparent, and open principles, indicating that the service quality provided is lacking or does not meet what is considered important by the suppliers, or in other words, it is not yet satisfactory. A satisfaction analysis using the Customer Satisfaction Index (CSI) method yielded a CSI value of 61.917%, which falls within the range of 66%-80.99%, indicating that respondents are generally satisfied with the application of these principles in government construction procurement in Manggarai Regency.
Overview Of RAMS Analysis and ITS Implementation in Railway Vehicles Muhamad Abdurrochman; Rachman Setiawan; Vani Virdyawan
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 7 No. 2: September 2024
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v7i2.8751

Abstract

Reliability, availability, maintainability, and safety (RAMS) analysis, as a tool to ensure performance, safety, and cost-effectiveness throughout the system’s life cycle, has been widely applied in various industries, including the railway industry, specifically railway vehicles. This article provides an overview of various studies exploring the implementation of RAMS analysis in railway vehicles. This literature review consists of an introduction, method, RAMS analysis, results and discussion, and conclusion. Several studies on the implementation of RAMS analysis in railway vehicles are presented and explained, and key points from each study are discussed to provide a comprehensive overview of the implementation of RAMS analysis in railway vehicles. In general, the benefits of the implementation of RAMS analysis are enhanced performance (reliability, availability, and maintainability), safety, and cost-effectiveness of railway vehicles throughout their life cycle. However, many studies only focus on one or a few aspects of performance, safety, or cost-effectiveness without comprehensive discussions of all these aspects. Additionally, many studies only concentrate on the operational phase, including maintenance and repair, without a complete discussion of the entire life cycle from concept to disposal stage.