cover
Contact Name
Aris Fiatno
Contact Email
abi.fiat@gmail.com
Phone
+6282113270340
Journal Mail Official
teknikindustri@universitaspahlawan.ac.id
Editorial Address
Jl. Tuanku Tambusai No. 23 Bangkinang Kampar, Riau » Tel / fax : (0762) 216 77 / (0762) 216 77
Location
Kab. kampar,
Riau
INDONESIA
Jurnal Teknik Industri Terintegrasi (JUTIN)
ISSN : 26208962     EISSN : 26208962     DOI : 10.31004jutin
Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses manufaktur, kegagalan dan rekayasa material, perawatan berbasis keandalan, keselamatan kerja, perancangan sistem kerja dan ergonomi, pengendalian dan penjaminan mutu, tata letak fasilitas, penelitian operasional, kewirausahaan dan pengembangan bisnis
Arjuna Subject : -
Articles 1,048 Documents
System pengendalian intern instansi pemerintah terhadap pengelolaan keuangan di kantor Baitul Mal di Kota Lhoksumawe Mulyana, Putri; Ropiah, Ropiah; Uswaturrahmi, Uswaturrahmi; Zulkarnaian, Teuku
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40259

Abstract

This study aims to evaluate the internal control system in government agencies in increasing the transparency of financial management at the Baitul Mal Office of Lhokseumawe City. As an institution that manages zakat, infaq, and alms, Baitul Mal plays a strategic role in distributing public funds in a targeted manner. However, challenges in implementing transparency and accountability raise doubts among the public. This research uses literature study method by collecting and analyzing secondary data from various similar studies that have been conducted related to zakat management and internal control system implementation in other zakat institutions. The analysis shows that Baitul Mal has implemented several principles of Good Corporate Governance (GCG), namely transparency, accountability, and responsibility. This implementation has a positive impact on the interest of muzakki to pay zakat. However, there are still constraints in the information system and budget limitations, which hinder the optimization of financial management. The principle of independence has not been fully implemented as Baitul Mal relies on cooperation with the government and third parties in the construction of dhuafa houses.
Hilirisasi kelapa membangun ekosistem berkelanjutan untuk pertumbuhan ekonomi Arbin, Alfiandi; Mohi, Sarahwati; Tansala, Gabriela Stefany; Haluti, Islamiyati Jahada
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40260

Abstract

The purpose of this study is to explore the potential of coconut downstreaming in improving the local economy and creating a sustainable ecosystem. The findings show that coconut downstreaming can increase the added value of products, with export value increasing by 15% in the last five years, thanks to growing global demand. The process of processing coconuts into various products, such as coconut oil, fiber, and processed foods, not only increases farmers' income but also creates new jobs. Recommendations from this study include the need for government support in policy and infrastructure, as well as increased collaboration between farmers, industry, and research institutions with these steps, coconut downstreaming has the potential to become a major pillar in sustainable economic development in Indonesia, while maintaining environmental and social sustainability.
Efektivitas pengelolaan penganggaran keuangan daerah terhadap kesejahteran masyarakat di Kota Lhokseumawe Rahmayati, Cut Aneza; Mahira, Tanasa; Raihan, Nur; Aliffadhila, Muhammad; Zulkarnain, Teuku
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40264

Abstract

This study aims to determine the effect of the Village Fund Allocation (ADD) on community welfare in Simpang Empat Village, Lhokseumawe City, Aceh. Village funds are part of the equalization funds used to support development, community empowerment, and improve village welfare. This study also aims to evaluate the effectiveness of village fund management in improving the quality of life of the community through transparent and accountable financial management. The research methods used are qualitative research methods, interviews, and field observations. The results show that the allocation of village funds has had a positive impact on infrastructure development, local economic development, and improved access to education and health. However, there are several obstacles in its implementation, such as limited human resources (HR) and inadequate infrastructure. In addition, the management of natural resources in the village is still not optimal. Therefore, it is necessary to increase the transparency of village fund management and more effective natural resource management to achieve more equitable community welfare.
Analisis tingkat kepuasan pelanggan terhadap kualitas pelayanan di mall x dengan metode Customer Satisfaction Index (CSI) (Studi kasus: PT. XYZ) Sari, Puspita; Zamzani, Muhamad Imron
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40266

Abstract

This study analyzes customer satisfaction in a mall by involving 100 respondents selected using Slovin's formula with a 10% margin of error. Data were collected through questionnaires that had been tested for validity and reliability, where the calculated r-value was greater than the critical r-value (0.195) and Cronbach's Alpha exceeded 0.60. Customer satisfaction was analyzed using the Customer Satisfaction Index (CSI), calculated by dividing the weighted average by the maximum scale (5). The results showed a CSI score of 78.96%, which falls into the "satisfied" category based on the CSI method (66%–80.99%). These findings indicate that customers are satisfied with the mall's services. Furthermore, the study provides valuable insights for the mall to focus on areas that matter most to customers, enabling the management to improve service quality and maintain customer satisfaction in the future.
Pengaruh dana alokasi umum dan investasi sektoral terhadap belanja modal pemerintah di Provinsi Aceh Jemeli, Jemeli; Ulfa, Maulidza; Haniya, Faiza Afin; Akbar, Atala; Zulkarnain, Teuku
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40278

Abstract

This research analyzes the influence of the General Allocation Fund (DAU) and sectoral investment on government capital expenditure in Aceh Province, with a focus on the downstrea ming of natural resources (SDA). The method used is multiple linear regression with secondary data from regional government financial reports and the Central Statistics Agency for the period 2015-2022. The research results show that DAU has a positive and significant effect on capital expenditure, especially for the infrastructure budget that supports natural resource downstreaming. Sectoral investment also plays an important role in increasing government capital capacity and developing the natural resource processing industry, which creates jobs and strengthens the local economy. In conclusion, DAU and sectoral investment have a strategic role in encouraging natural resource downstreaming. The government is advised to optimize the use of DAU and encourage sectoral investment to support infrastructure development. Further research is needed to explore other factors and the long-term impact of capital expenditure on regional economic growth
Perancangan tata letak workshop menggunakan metode Systematic Layout Planning (SLP) di pergudangan Central Industrial Park Nuraini, Siti Arifah; Dewi, Sinta
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40280

Abstract

In the industrial world, the issue of factory layout and the layout of production facilities and equipment is one that plays an important role in increasing company productivity. Inappropriate layout can cause material transfer time to be ineffective due to the long distance between stations. Central Industrial Park (CIP) is a warehouse area in Sidoarjo Regency. This research aims to improve and create a new layout of facilities in the workshop warehouse in the CIP area. Data processing was carried out using the Systematic Layout Planning (SLP) method with the help of Blocplan 90 software. This research produced Adj values. Score of 0.80. The R-score value is 0.78 and has an R-Dist score value of 355. The results of research on layout improvements found a length of 18.5 meters and a width of 15 meters.
Penyajian laporan keuangan daerah sesuai PSAP 71 tentang standar akuntansi pemerintahan di kantor Badan Pengelolaan Keuangan Aceh Husnawati, Husnawati; Zahara, Rina; Zulkarnain, Teuku
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40315

Abstract

This study aims to evaluate the presentation of local financial statements at the Aceh Financial Management Agency office in the context of conformity with the guidelines of Government Accounting Standards (PSAP) 71. Statement of Government Accounting Standards (PSAP 71) regulates local government financial statements, focusing on disclosures related to fixed assets. The evaluation phase includes an assessment of compliance with the standard as well as the quality of the information presented, with a focus on transparency and accountability in asset management. With the existence of PSAP 71, it is expected that financial statements can present relevant, reliable and useful information. This research methodology uses a qualitative approach with data collection techniques. This research was conducted in the time span of 2022-2023. The results showed that although the Regional financial statements in Aceh Province had been prepared with reference to PSAP 71, there were still some discrepancies in the application of accounting principles. For example, it can be in the form of fixed asset valuations that are not updated, so that the reported values do not reflect the actual conditions. Based on the analysis, this study recommends several corrective measures. First, the development of a better and integrated accounting information system to facilitate the process of collecting and presenting financial data.
Analisis penggunaan user status oleh planner pada maintenance order di PT. Pupuk Kaltim Mahendra, Yusril Masa; Hertadi, Christopher Davito Prabandewa
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40317

Abstract

This study analyzes the use of user status by planners on maintenance orders (MO) that experienced a backlog of more than one month in Plant 1A, 3, 4, and 7 of PT Pupuk Kaltim during 2024 using Fishbone Diagram and Pareto Chart methods. The Fishbone Diagram is used to identify the root causes of the backlog, which are grouped into six main categories: Man, Method, Material, Machine, Measurement, and Environment. The results of the Pareto Chart analysis show that the backlog is mainly caused by factors such as Waiting Material (WMAT), Waiting for Confirmation (WCON), and Waiting for Shutdown (WSHU). Based on these findings, this study provides strategic recommendations to improve the effectiveness of the planning and management of MOs through the optimization of user status usage by planners. These findings are expected to help PT Pupuk Kaltim reduce MO backlogs and improve plant maintenance efficiency.
Kajian kinerja manajemen konstruksi dalam proyek pembangunan Water Treatment Plant (WTP) 300 LPD Simoro Sulawesi Tengah Borahima, Adhim; Musa, Ratna; Watono, Watono
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40344

Abstract

The construction of the Simoro Water Treatment Plant (WTP) in Gumbasa District, Sigi Regency, Central Sulawesi, is a complex project aimed at improving regional infrastructure. This research aims to analyze the construction management of the project by applying the Critical Path Method (CPM) and Time Cost Trade Off (TCTO) methods to enhance time and cost efficiency. The CPM method is used to identify the project's critical path and manage activities that most affect the total project duration. Meanwhile, TCTO is analyzed to optimize the additional costs needed to accelerate project completion without compromising the quality of the final results. The research results indicate that: (1) using the CPM method and Primavera software, the activities on the critical path include Start (Preparation), Cleaning and leveling work, Earth excavation work, Aggregate Base Layer B work, Earth excavation work, Aggregate Base Layer B work, Cut and Fill work, Bore Pile work (Reservoir), Earthwork (Reservoir), Pile Cap Foundation work (Reservoir), Concrete Floor work, Reservoir Tank work, Bore Pile Foundation work for Clearwell, Bore Pile Foundation work for IPA Building, Earthwork for IPA Building, Structure work for Coagulation Building, Structure work for Flocculation Building, Structure work for Sedimentation Building, Mechanical work, Electrical work, Scada Instrument, and Commissioning Test. (2) From the application of Time Cost Trade Off (TCTO) analysis, the lowest implementation cost obtained is Rp. 78,262,088,288.34 with the Crash condition of the implementation time being 913 days. This research provides significant contributions to improving construction management performance, particularly in terms of time and cost efficiency, and offers practical guidance for project managers in developing better and more effective project management strategies.
Kajian manajemen pengendalian waktu dan biaya pada proyek relokasi jalan masyarakat berdampak Bendungan Bulango Ulu Provinsi Gorontalo Irjan, Irjan; Musa, Ratna; Watono, Watono
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.40370

Abstract

This study analyzes the relationship between time and cost control in the relocation project of community roads affected by the Bulango Ulu Dam in Gorontalo Province using the Line of Balance (LoB) method. This method is applied to design a more structured work schedule, identify activity stages, and minimize potential conflicts between tasks. The study results indicate that implementing the LoB method reduces the project duration to 33 weeks (7.7 months), compared to the existing schedule of 35 weeks. The two-week time savings significantly improve time efficiency. However, this acceleration results in an increase in total project costs, primarily due to higher labor and equipment usage. Calculations show that the LoB method requires higher costs than the existing schedule. This study confirms a reciprocal relationship between time and cost: time acceleration can affect cost increases, but cost efficiency can also be achieved through more targeted planning. The application of LoB provides a more measurable solution for managing construction projects, especially those involving repetitive tasks. The success of this method depends on strict supervision and schedule adjustments based on field conditions

Page 58 of 105 | Total Record : 1048