cover
Contact Name
Fadhila Muhammad Libasut Taqwa
Contact Email
fadhila.muhammad@uika-bogor.ac.id
Phone
+62251-8380993
Journal Mail Official
komposit.journal@uika-bogor.ac.id
Editorial Address
Gedung Ir. Prijono Hardjosentono Universitas Ibn Khaldun Bogor Jl. KH. Sholeh Iskandar km. 2 Kedung Badak Tanah Sareal Bogor
Location
Kota bogor,
Jawa barat
INDONESIA
Jurnal Komposit : Jurnal Ilmu-Ilmu Teknik Sipil
ISSN : 35132615     EISSN : 2655934X     DOI : -
Core Subject : Engineering,
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil adalah jurnal yang mempublikasikan hasil-hasil penelitian, ulasan ilmiah, teori dan aplikasi serta informasi lain di bidang ilmu pengetahuan, teknologi, dan sains (IPTekS), terutama teknik sipil, lingkungan, dan perencanaan wilayah-kota.Jurnal Komposit terbit dua kali dalam setahun. Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil is a journal that publishes research results, scientific reviews, theory and applications as well as other information in the fields of science, technology and science (IPTekS), especially civil engineering, environment, and urban planning. Jurnal komposit issued biannually. Articles to be published in the Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil are compiled from articles prepared by the author(s) and sent to the editorial board of Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Departement of Civil Engineering, Faculty of Engineering and Science, Universitas Ibn Khaldun Bogor. Articles should be written in English or Bahasa Indonesia. Research scope in general is civil engineering and environmental engineering study.
Articles 25 Documents
Search results for , issue "Vol. 8 No. 2 (2024)" : 25 Documents clear
Pengaruh Pembangunan Kawasan Transit Oriented Development (TOD) di Stasiun Bogor Ditinjau dari Aspek Lalu Lintas Afif, Mochammad Tharikh; Murtejo, Tedy; Alimuddin, Alimuddin; Sudrajat, Endang
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15473

Abstract

Kecamatan Bogor Tengah Merupakan salah satu kecamatan di Kota Bogor dengan luas Wilayah 8,39 km2 dengan 11 desa di dalamnya, dan dilintasi jalan utama Antar Provinsi yang menghubungkan Kota Bogor,dengan Kab. Bogor dan menjadi salah satu akses utama yang di lewati dari arah Jakarta maupun Cianjur dan Sukabumi, maka peningkatan pergerakan yang keluar masuk kawasan ini mempengaruhi kinerja ruas jalan hingga menimbulkan permasalahan.Dengan Adanya Wacana Pembangunan Kawasan Terpadu Transit atau TOD (Transit Oriented Development) di kawasan sekitar Stasiun Bogor dan kawasan penting di sekitarnya yang dimana arus lalu lintas ini harus di perhatikan dikarenakan potensi akan pergerakan dan mobilitas baik kendaraan pribadi,Umum,dan Pejalan kaki ini di perkirakan akan meningkat karena dibangunnya pusat pusat keramaian baru di kawasan ini. Penelitian ini dilakukan untuk mengetahui seberapa besar jumlah pergerakan serta bangkitan dan tarikan yang ditimbulkan Kawasan Stasiun Bogor Khususnya Kecamatan Bogor tengah yang menjadi basis penelitian ini dan diharapkan hasil dari penelitian ini dapat diaplikasikan dalam rencana arus lalu lintas yang akan diaplikasikan saat Proses Pembangunan Kawasan TOD dan sesudah proses pembangunan kawasan TOD ini berlangsung, studi seperti pusat pendidikan, perkantoran, rumah sakit, kawasan wisata dan pusat perbelanjaan/perdagangan. Survey traffic counting dilakukan di ruas-ruas jalan utama akses keluar dan masuknya kendaraan dari dan menuju stasiun Bogor yang kemudian diolah berdasarkan metode MKJI 2017. Selanjutnya menggunakan Trip Generation Manual dan menggambarkan besaran bangkitan dan tarikan dalam MAT, kemudian dimodelkan dalam Software SATURN sehingga didapat hasil penelitian yaitu Jumlah bangkitan pada kawasan pendidikan, kesehatan, penginapan, perkantoran, pusat perbelanjaan di Jalan sekitar Kawasan Stasiun Bogor yakni sebesar 36.441 trip/jam sedangkan untuk bangkitan di stasiun Bogor dan Paledang sendiri yakni sebesar 16.764 trip/jam. Sedangkan Jumlah Tarikan dari 15 Jalan di sekitar wilayah Stasiun Bogor & Stasiun Paledang pada saat Hari Kerja adalah 17.199 smp/jam dan saat Hari Libur 15.309 smp/jam. Kata kunci: Bangkitan dan tarikan, MAT, transportasi, TOD (Transit Oriented Development).
Hubungan Volume, Kecepatan dan Kepadatan Lalu Lintas pada Jalan Kabupaten Aceh Tamiang Chairumansyah, T; Masthura, Lely; Basrin, Defry
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15484

Abstract

Highways are a very important transportation infrastructure in helping regional development, so that without a smooth flow of transportation it will have a lot of influence in encouraging the rate of development which tends to increase community growth. Therefore, a comprehensive road monitoring system is needed in order to find out the problems of congestion on the road. The method used in this research is the greenshields and underwood method. The aim of the research is to obtain the volume, speed and density of traffic and obtain a graph of the relationship between volume, speed and traffic density on the Banda Aceh – Medan STA road. 464+700 to STA. 465+200 Kedai Besi Village, Karang Baru District, Aceh Tamiang Regency. The research results were obtained for the direction Langsa - Kuala Simpang S-D (Speed-Density), with the highest R² value (R² = 0.198). V-D (Volume-Density), with the highest R² value (R² = 0.988). V-D (Volume-Speed) with the highest R² value (R² = 0.537). Meanwhile, for the direction Kuala Simpang – Langsa S-D (Speed-Density), with the highest R² value (R² = 0, 0.999). V-D (Volume-Density), with the highest R² value (R² = 0.991). V-D (Volume-Speed) with the highest R² value (R² = 0.209). From the research results for the Kuala Simpang - Langsa road, it is more suitable to use the underwood model. Meanwhile, for the Langsa - Kuala Simpang direction, it is more suitable to use the greenshields model. Keywords: Greenshields, Highways, Transportation, Underwood.
Analisis Jenis Aliran pada Saluran Terbuka dengan Hambatan Ash Shiddiq, Raden Herdian Bayu; Suryaman, Nia Nuraeni; Ardiansyah, Neris Peri
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15499

Abstract

Pada saluran terbuka, aliran uniform (tetap/seragam) akan mengalami perubahan kecepatan dan ketinggian jika terdapat hambatan atau benturan di dalam pengalirannya. Sifat aliran dapat berubah dari uniform menjadi non-uniform atau dari laminer (sejajar) menjadi turbulen (tidak teratur), atau sebaliknya. Penelitian ini bertujuan untuk melihat fenomena perubahan aliran pada saluran terbuka yang ditambahkan hambatan di badan salurannya. Adapun metode penelitian ini dilakukan dengan cara pemodelan fisik dengan flume meter dan pemodelan numerik dengan bantuan software HEC RAS 1D. Dari hasil penelitian didapat bahwa Dari hasil penelitian ini didapat hasil bahwa pada kondisi eksisting tanpa hambatan dengan debit sebesar 0.01 m3/s dan kemiringan saluran 0.01 dihasilkan jenis aliran superkritik dengan tinggi muka air rata- rata 1 cm. Pada percobaan pertama dengan diberikan hambatan dengan bukaan bawah jenis aliran yang terjadi di hulu berdasarkan angka froude pada pemodelan numerik HecRas 1D berubah menjadi aliran subkritik dengan tinggi muka air di hulu rata – rata 3 cm dan di hilir rata – rata 1.5 cm. Untuk kecepatan rata – rata di hulu sebesar 0.1 m/s dan di hilir sebesar 0.26 m/s. Pada percobaan kedua saat diberikan hambatan berupa ambang trapesium didapat tinggi muka air di bagian hulu rata – rata 10 cm dengan kecepatan rata – rata 0.04 m/s, diatas ambang 1 cm dan di bagian hilir rata – rata 1.4 cm dengan kecepatan rata – rata 0.26 m/s, sedangkan jenis aliran berdasarkan angka froude termasuk ke dalam aliran sub kritis
Perbandingan antara RAB dengan RAP pada Proyek Pembangunan Aula Serbaguna SMP Negeri 11 Langsa Sihite, Okta Enjelin; Mutia, Eka; Firdasari, Firdasari
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15534

Abstract

Proyek merupakan suatu rangkaian aktivitas terencana yang didalamnya menggunakan uang dan tenaga kerja untuk mendapatkan hasil di masa yang akan datang. Kontraktor akan menghitung Rencana Anggaran Biaya (RAB) dengan memperkirakan biaya pekerjaan yang dibutuhkan proyek, namun selama berlangsungnya suatu proyek dikenal juga dengan Rencana Anggaran Pelaksanaan (RAP) yang merupakan biaya di lapangan sampai proyek selesai. RAB dengan RAP terdapat selisih biaya dari masing-masing jenis kegiatan, begitu pula dengan pembangunan Aula Serbaguna SMP Negeri 11 Langsa, maka perlu dilakukan penelitian untuk mengetahui perbandingan antara RAB dengan RAP pada proyek pembangunan Aula Serbaguna SMP Negeri 11 Langsa. Tujuan dari penelitian ini adalah untuk mengetahui nilai RAP, selisih antara RAB dan RAP serta selisih item pekerjaan yang menggunakan biaya terbesar antara RAB dan RAP pada proyek pembangunan Aula Serbaguna SMP Negeri 11 Langsa. Adapun metode yang digunakan dalam penelitian ini adalah adalah metode kuantitatif yaitu bentuk penelitian dimana hasil penelitian dipresentasikan dalam bentuk hasil penghitungan matematis. Hasil penelitian diperoleh nilai RAP lebih kecil dari RAB dengan nilai RAB sebesar Rp.784.610.750,00 sudah termasuk PPN, sedangkan total Rencana Anggaran Pelaksanaan sebesar Rp.667.559.973,56. Selisih perbandingan biaya Rencana Anggaran Biaya dengan Rencana Anggaran Pelaksanaan pada pekerjaan seluruh item pekerjaan yaitu Rp.117.050.776,44 atau sebesar 15%, dimana pekerjaan yang menggunakan biaya terbesar yaitu pekerjaan beton bertulang dlihat dari perhitungan harga bahan sebesar Rp.69.032.403,21. Hal ini dapat dilihat pada rekap kebutuhan material yang dihitung berdasarkan volume Mutual Check (MC) akhir.
Perencanaan Struktur Gedung Pusat Rehabilitasi Narkotika Kota Langsa Ramadani, Putri; Purwandito, Meilandy; Fajri, Haikal
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15589

Abstract

The Narcotics Rehabilitation Center Building is a much needed facility for every drug addict who needs rehabilitation. For the safety and comfort of building users structural element planning is required to determine the correct dimensions and reinforcement. The planning was carried out in Langsa City, where the SDS and SD1 values were 0,79 and 0,8 so that the seismic category fell into E. The working loads were dead load, live load, and earthquake load. The regulations used are SNI 2487-2019 concerning Structural Concrete Requirements for Buildings and Explanations, SNI 1726-2019 concerning Procedures for Earthquake Resistance Planning for Building and Non Building Structures, SNI 1727-2020 concerning Minimum Design Loads and Related Criteria for Buildings and Other Structures, SNI 2052-2017 concerning Concrete Reinforcing Steel. Structural analysis and structural modeling using the ETABS 2018 program. This plan uses 2 types of dilation with an L shaped building. The results and design analysis show that the column dimensions are 65/65 cm for K1, 55/55 cm for K2, and 60/60 cm for K3. The beam dimensions are 50/70 for Main Beam 1. 45/65 cm for Main Beam 2, 40/60 cm for Main Beam 3, and 30/45 cm for Child Beam. The dimensions of the floor plate are 15 cm thick and the roof plate is 12 cm. Key words: Response Spectrum, Reinforced Concrete, SRPMK, Design, ETABS
Analisis Struktur Beton Pelat Lantai dan Balok dengan Metode Bekisting Sistem Fix Shoring Arisyi, Luthfan; Dewita, Hikma; Sembiring, Kristina
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15598

Abstract

In the construction of a building, it is necessary to plan a concrete structure that can make us feel safe and comfortable. The concrete structure itself is very close to making a slab and beam, the design and implementation of a slab and beam has many innovations in the manufacturing process. One of the information during the construction of the structure is formwork with a fixed shoring system. Where when the formwork can be removed quickly enough from the usual time, this will cause a reaction on the structure itself and the fix shoring is the part that reduces the impact of the reaction. The purpose of this study was conducted to find out whether the fix shoring system formwork is able to provide safe results according to the building permit. The fix shoring method based on the results of the analysis obtained, the floor slab concrete structure was able to withstand the deflection that occurred on day 2 (2.891 of the maximum deflection of 8.333). Meanwhile, the elastic deflection only met the requirements on day 3 (Mu<Mcr, 8.729 kN/m < 8.700 kN/m). For the concrete structure itself has a size of 40x70 and 30x70. The conclusion is that the overall results comply with the specified permits from the pedestal to the field. It can be stated that the formwork of the fixed shoring system, on the 3rd day, the formwork can be removed without affecting the state of the concrete structure.
Analisis Pengaruh Abu Tempurung Kelapa terhadap Kuat Tekan Beton Memadat Sendiri (Self Compacting Concrete) Chelvia, Chyndi; Purwandito, Meilandy; Irwansyah, Irwansyah
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15692

Abstract

Research in the concrete industry aims to improve the quality of concrete using advanced technology and techniques. One of the innovations carried out is the use of additional materials in SCC concrete, namely coconut shell ash. This research uses coconut shell ash as an additional material with the proportion of coconut shell ash used being 0%, 5%, 15% and 25% of the cement weight with a maximum aggregate accuracy of 20 mm. The reference used in making the concrete mix is the EFNARC Mix Design with a design compressive strength (f'c) of 20 MPa. The test object is cylindrical with a diameter of 15 cm and a height of 30 cm. The tests carried out were compression tests with treatment for 14 and 28 days. The results of adding coconut shell ash to SCC concrete have an influence on the workability characteristics of concrete in the form of a maximum slump flow value in the SCC0 concrete variation without additional coconut shell ash of 650 mm and a minimum slump flow value found in the unmixed concrete (BN) variation of 330 mm and The results of the v-funnel test experienced a decrease in flow time as the coconut shell ash increased, this was caused by the higher the percentage of coconut shell ash used, the thicker the concrete properties would be. The results of the comparison value of unmixed concrete (BN) and SCC concrete with variations in the addition of coconut shell ash to the compressive strength of concrete at the ages of 14 and 28 days showed a decrease in the compressive strength value of concrete along with increasing the percentage of coconut shell ash used. The highest decrease in the compressive strength value of unmixed concrete (BN) occurred in the SCCA25 variation, 55.50% at 14 days and 61.06% at 28 days.
Pengaruh Model Perletakan Struktur Rangka Baja Sistem Bresing akibat Beban Gempa Bartholomeus, Bartholomeus; Pasaribu, Humisar
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15724

Abstract

Sistem struktur rangka baja bresing konsentris dan eksentris merupakan sistem struktur konstruksi yang termasuk dalam struktur yang tahan terhadap beban gempa. Pada penelitian ini, masing-masing sistem struktur rangka baja bresing konsentris dan eksentris tersebut dianalisis dengan model perletakan yang berbeda-beda mulai dari struktur dengan perletakan sendi, jepit, dan struktur yang menggunakan base isolator. Model struktur juga divariasikan dengan jumlah tingkat yang berbeda yaitu tingkat 3, 4, dan 5, namun dimensi lebar dan panjangnya dibuat sama. Tahap awal yang dilakukan pada penelitian adalah melakukan preliminary design dan pemodelan struktur. Kemudian dilanjutkan dengan penentuan data gempa riwayat waktu di permukaan. Setelah itu, dilanjutkan dengan penentuan parameter base isolator struktur, dan kemudian melakukan analisis struktur. Hasil analisis struktur menunjukkan kenaikan rata-rata periode struktur rangka bresing konsentris (SRBK) dari perletakan sendi dan jepit masing-masing adalah sebesar 2,20 dan 2,32 kali jika menggunakan perletakan base isolator. Sedangkan kenaikan rata-rata periode struktur rangka bresing eksentris (SRBE) dengan perletakan sendi dan jepit masing-masing adalah sebesar 2,07 dan 2,20 kali jika menggunakan perletakan base isolator. Selain itu, penggunaan base isolator pada struktur SRBK dan SRBE dengan jumlah tingkat dan periode struktur yang lebih tinggi akan membuat struktur akan lebih fleksibel dan belum tentu membuat struktur SRBK dan SRBE tahan gempa, namun dapat mengontrol struktur tersebut sehingga terhindar dari periode struktur dalam kondisi resonansi yang berbahaya.
Kajian Jangkauan Layanan Stasiun KRL Jabodetabek di Wilayah Suburban (Studi kasus: Stasiun Tenjo dan Stasiun Tigaraksa) Tinambunan, Hanna Dwipaningtyas Boru; Syabri, Ibnu
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15846

Abstract

The Jabodetabek commuter rail is an essential supporting public transportation system connecting suburban areas to city-centre workplaces. Determining service coverage is one thing that needs to be considered in a transit service availability system. This research tries to increase the range of services with park-and-ride and ridesourcing facilities at Jabodetabek commuter rail station locations in suburban areas. This is expected to increase interest in using the Jabodetabek commuter rail. For this reason, quantitative performance is needed to state what factors influence the service area coverage of a station in suburban areas, which are analyzed using the multiple linear regression method. Station service coverage is measured by the length of the journey from the place of residence to the starting station for Jabodetabek commuter rail users, with the station of origin of the trip being Tenjo Station and Tigaraksa Station, using the perspective of distance and travel time from the place of residence to the station of origin of the trip. The estimation results show that the radius of station service coverage, namely the travel time from residence to the station of origin of the journey (minutes), has a higher coefficient of determination than the distance from residence to the station of origin of the journey (km). Apart from that, 9 (nine) factors were identified that influenced travel time from residence to the station of origin of the journey (minutes). In contrast, the distance from residence to the journey's origin (km) station was identified as 6 (six) factors. Then, the estimated tolerance value for the station's service range is obtained in the range of 0.5-9.0 km and 5-26 minutes.
Analisis Pekerjaan Beton Bertulang dengan Building Information Modelling (BIM) 5D pada Proyek Pembangunan Kantor dan Pos Jaga Depot Supply Point Pertamina Lubricants Tarakan Putra, Zam Zam Dade; Danuarta, Fachry; Pratiwi, Reno; Hendriyani, Irna
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15893

Abstract

The calculation of the cost budget by consultants mostly uses Microsoft Excel. This causes opportunities for errors due to inaccuracies in interpretation and calculation in elaborating the complexity of the building to be built. Calculations that still use excel in development projects where it can result in a much larger calculation difference resulting in cost overruns. For this reason, it is necessary to require more effective cost estimation planning. One of the latest project management information systems today is Building Information Modeling (BIM). BIM has great potential to share visualize information, visualize construction progress, provide information quickly. Therefore, this research uses BIM 5D (Autodesk Revit software) which functions to estimate the cost budget of a project. The Plan Budget Cost (RAB) figure will not be 100% accurate. The purpose of this study is to determine the comparison and difference in volume calculations and RAB using BIM 5D dimensions with calculations of Planning Consultants on Reinforced Concrete Works in the Office and Post Security Depot Supply Point Pertamina Lubricants Tarakan Construction Project. The results of the calculation with BIM 5D method and the Planner Consultant obtained the results of the calculation of the difference where the comparison of the volume of reinforcement is a difference of 3.83% while in concrete work the difference is 4.37%. Meanwhile, the results of the RAB calculation on reinforced concrete work cost difference of 4.10%.

Page 2 of 3 | Total Record : 25