cover
Contact Name
Syapril Janizar
Contact Email
jurnaltekniksipilcendekia@gmail.com
Phone
+6289602817819
Journal Mail Official
jurnaltekniksipilcendekia@gmail.com
Editorial Address
Jl. Pahlawan No.69, Sukaluyu, Kec. Cibeunying Kaler, Kota Bandung, Jawa Barat 64987
Location
Kab. sumedang,
Jawa barat
INDONESIA
Jurnal Teknik Sipil Cendekia (JTSC)
Core Subject : Engineering,
JTSC: Jurnal Teknik Sipil Cendekia is published by Civil Engineering Study Program, Faculty of Engineering, Planning and Architecture, University Winaya Mukti. This peer-reviewed journal is designated to publish articles that report the results of research in civil engineering science. JTSC: Jurnal Teknik Sipil Cendekia invites particularly manuscripts or research-based articles in the diverse topics include functional areas of Transportation Engineering, Structure, Design road and Bridge, Geotechnic, Management Project, Contruction Management, Hydrology and Water Resources, Information Civil Technology (ICT), Entrepreneurship Civil Engineering and Engineering Economics. The manuscripts or research-based articles that will be accepted are qualitative, quantitative research and mixed method written either in Bahasa or English. We are the editorial team, welcoming the papers submissions from various audiences or professions such as researchers, academicians, students, practitioners, regulators and others who interested in Civil Engineering studies.
Articles 188 Documents
Analysis of the Effects of Soil Parameters and Depth on the Lateral Movement of Soil Improved by Combined PVD-Vacuum Consolidation Fitriana Sarifah; Intan Nuriskha Rachma; Sarah Oktaviani Dewi; Pengki Irawan; Shanti Astri Noviani
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v7i4.744

Abstract

One method for improving highly compressible, low-permeability soft soils is the combination of Prefabricated Vertical Drains (PVDs) and vacuum consolidation. Chai et al. (2005) proposed an analytical method for estimating lateral soil movement based on field measurements using inclinometers. However, the model parameter (?) in their method lacks an explicit explanation of its relationship with soil properties and depth. This study aims to investigate the influence of soil parameters and depth on lateral ground displacement by comparing inclinometer measurements from a case study with an enhanced analytical model derived from Chai et al. (2005). The results identify the compression index (Cc) as the most influential soil parameter, while the depth effect (z) is represented by the function f(z) = 0.001z3 - 0.0317z2 + 0.2328z + 0.3345. The proposed model was evaluated against field data using quantitative error metrics, yielding a coefficient of determination (R2) of 0.9710, a mean absolute error (MAE) of 0.0435, and a root mean square error (RMSE) of 0.0482. These results indicate strong agreement with field measurements and relatively low prediction errors. Nevertheless, further validation under different soil conditions is required to establish the model's broader applicability.
Quantitative Analysis of Partnering Depth between Designers and Contractors in Government Design and Build Projects Achmad Sutowo; Agustinus Purna Irawan; Endah Murtiana Sari; Oie Fuk Jin
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v7i4.746

Abstract

This study aims to develop a quantitative model for measuring the depth of partnering between designers and contractors in government projects using the Design and Build scheme. Partnering is an important aspect because the integration of design and construction functions requires collaboration, communication, trust, and alignment of objectives among organizations. This study employed a quantitative approach through a survey of 50 respondents consisting of designers, contractors, and government project owners selected using purposive sampling. The depth of partnering was measured based on relationship factors, process factors, and environmental factors mediated by partnering maturity. Data analysis was conducted using the Statistical Package for the Social Sciences (SPSS) through validity testing, reliability testing, and descriptive statistical analysis to identify the characteristics and contribution of factors forming the depth of partnering. The results showed that the process factor (X2) had a standard deviation value of 2.01 and received strong attention in forming the depth of partnering. This finding indicates the importance of coordination among parties, risk sharing, quality control, and stakeholder involvement during the implementation of government Design and Build projects.
Evaluation and Modification of a Sediment Excluder for Cohesive Sediment in Irrigation Areas in Indonesia: Field Evidence, Numerical Modeling, and Physical Model Validation Herryan Kendra Kaharudin; Agustinus Purna Irawan; Wati A. Pranoto
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v7i4.748

Abstract

KP-02 and KP-04 provide sand traps and sediment excluders primarily intended for non-cohesive sediment, whereas many irrigation systems carry predominantly silt and clay. This study evaluates existing structures and develops a modified Silt Settler concept for cohesive sediment using field evidence, numerical modeling, and physical model validation. Samples downstream of the Warujayeng sediment excluder contained 74.6–75.0% silt and 21.0–21.8% clay. At Tami Weir, cohesive fractions in bed sediment reached 77–100%, with TSS concentrations of 130–270 mg/L. HEC-RAS 2D modeling showed that sediment concentration in the existing sand trap decreased from 380–427 mg/L to approximately 150 mg/L, but fine sediment continued to enter the main canal. Two four-channel Silt Settler alternatives were simulated using FLOW-3D Hydro and evaluated against Krone deposition and Partheniades erosion thresholds. At a settling discharge of 5.0 m³/s, the deposition-opportunity index was 0.48% for Alternative 2A and 0.02% for Alternative 2B. The inlet baffle in Alternative 2A increased the projected index to 56.4–58.0%. Validation using a 1:5 physical model produced MAPE values of 6.43% for water level and 12.50% for velocity. The results support Alternative 2A with an inlet baffle and measurable cohesive-sediment criteria for updating KP-04
Comparative Performance Analysis of Government Building Projects Using Design-Bid-Build (DBB) and Design-Build (DB) Delivery Methods Endah Murtiana Sari; Probokusumo Probokusumo; Miri Ardiansyah; Damara Astiningtyas; Muhammad Dzaky Ashidqi
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v7i4.751

Abstract

The performance of government building projects is an important indicator of successful infrastructure delivery. However, these projects often face delays, coordination problems, and deviations between planned and actual progress. Differences between Design–Bid–Build (DBB) and Design–Build (DB) delivery systems may influence project performance. This study aims to compare the performance of government building projects implemented under DBB and DB systems. A quantitative approach was employed to analyze planned and actual progress curves from 12 government building projects. Performance was evaluated primarily based on the alignment between planned and actual progress throughout the construction period. The results reveal considerable variation in performance across the projects. DB implementation did not consistently produce better performance in every project; nevertheless, DB projects demonstrated relatively better overall performance than DBB projects. These findings indicate that project performance is not determined solely by the delivery system but is also associated with project control, stakeholder coordination, resource management, and the ability to respond to implementation deviations. The findings provide a basis for developing an early warning framework to identify potential schedule delays and support timely corrective actions in government building projects.
Causes Of Cost Overrun In Building Construction Projects Mega Waty; Juliastuti Juliastuti
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Cost Overrun is a persistent problem in both developed and developing countries, causing financial losses, difficulties, project delays, and possibly even project failure. The project cost overrun on 4 buildings is quite large and encourages the search for the cause of the project cost overrun, which not only includes 4 buildings but also other equivalent building projects. Through interviews and distribution of questionnaires that have previously been validated by several experts so that the questionnaire is valid. Distribution was carried out and received a return of 37 respondents. The result is that there are 20 valid indicators and the causes of cost overrun are obtained from RII calculations by placing the 8 largest ranks on 11 indicators, with the biggest causes of Cost Overrun being Lack of control and control of material quality, shortage of labor, weak logistics supervision resulting in loss of materials, inflation and escalation of material prices, high rental or purchase prices for equipment due to not conducting a survey first, Lack of construction materials, poor productivity and quality of human resources, additional work due to changes in design and drawings, work instructions that are not understood properly, by paying attention to the highest to lowest variables, the main one is material, the second highest is equipment, the third highest is labor, and the lowest rank is other variables
PERAN PELAYARAN RAKYAT DALAM MENDUKUNG DISTRIBUSI LOGISTIK DI PELABUHAN PASAR BARU BABANG, HALMAHERA SELATAN Muhliyanto Hadi; Ichsan Rauf; Nurmaiyasa Marsaoly
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v7i4.764

Abstract

The archipelago region of South Halmahera relies on sea transportation to maintain the continuity of supply for community needs and to expand market access for local commodities. This study analyzes the characteristics and role of traditional shipping (pelayaran rakyat), assesses the effectiveness of logistics distribution services, and formulates strengthening strategies through Pasar Baru Babang Port. The study uses a descriptive-evaluative case study approach with a dominant qualitative orientation, supported by descriptive quantitative analysis. Research evidence includes 2021–2025 operational data, documents on existing conditions and port layouts, as well as field documentation on fleets, routes, cargo, facilities, and loading/unloading activities. The results show that around 20 barebo vessels, consisting of motorized wooden boats generally under 500 GT, serve Gane, Makian, Kayoa, Obi, Kasiruta, Mandioli, and other small islands. During 2021–2025, a total of 5,248 ship calls were recorded. Unloaded general cargo reached 226,130.81 m³ and loaded cargo was 236,714.74 m³, while unloaded fuel (BBM) reached 246,976 m³ and loaded fuel was 14,332 m³. Based on the sum of both cargo groups, total loaded cargo was equivalent to 53.06% of total unloaded cargo, indicating a cumulative flow imbalance. Traditional shipping is functionally effective as a feeder and last-mile connectivity, but remains sub-optimal due to limited berthing space, a trestle transition point approximately 3.40 m wide, shared apron usage, schedule information uncertainty, and weak operational record-keeping. Service enhancement is prioritized through return-cargo consolidation, operational zone management, data standardization, safety improvements, inter-actor coordination, and gradual facility development.
Systematic Literature Review: Penerapan Algoritma Machine Learning Regression Untuk Prediksi Kuat Tekan Beton Dengan Pemanfaatan Agregat Lokal Dan Non-Standar: Systematic Literature Review: Penerapan Algoritma Machine Learning Regression Untuk Prediksi Kuat Tekan Beton Dengan Pemanfaatan Agregat Lokal Dan Non-Standar Ibnu Ashari Amin; Minson Simatupang; Hasmina Tari Mokui
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v7i4.765

Abstract

Concrete compressive strength prediction is crucial in structural engineering, particularly for local and non-standard aggregate mixtures whose characteristics differ from those assumed by conventional design codes. This study maps the application of ML regression algorithms for concrete compressive strength prediction using non-standard materials, specifically Indonesian local aggregates, and IoT–ML integration. Literature was searched using the PRISMA 2020 protocol from various databases, with 119 core references synthesized in a matrix of source, non-standard material, best algorithm, and evaluation metrics. The synthesis results show three main findings. First, gradient boosting and ensemble algorithms tend to be superior, with XGBoost achieving an R² of up to 0.998, bagging regressor 0.97, and stacking reducing RMSE by 4.2%. Second, ANN is effective for waste materials and complex mixtures, with an R² of up to 0.9888 and MAPE of 2.87%. Third, IoT–ML integration enables real-time compressive strength prediction, with an error of 0.76–7.83% and an R² of up to 0.996. However, ML research on local Indonesian aggregates, such as laterite, coral rock, coral pumice, and sea sand, remains limited. This indicates a research gap in the need for a standardized, validated regression ML framework for local Indonesian aggregates and integrated with IoT architectures.
Penilaian Kondisi Perkerasan Jalan dengan Metode Indeks Kondisi Perkerasan (IKP) pada Jalan Jenderal Sudirman, Kota Batang Sandhika Sujayanto; Mohammad Hatta Keitaro; Suprapto Hadi
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v7i4.768

Abstract

Jalan Jenderal Sudirman, Kota Batang, is part of the Java North Coast (Pantura) corridor, a primary arterial used by heavy vehicles, but the studies reviewed here did not report the surface condition of a comparable flexible-pavement section assessed with the Pavement Condition Index (IKP). This study determines the IKP, the dominant distresses, the location of damaged segments, and the required treatment on a 1-km section. A visual survey was carried out on 10 October 2026 on 80 sample units (50 m each, 40 per direction) following Guideline Pd 01-2016-B, and differences between directions and lanes were tested with the Mann-Whitney test. The pavement is in Very Good condition overall (IKP 86.9), but the damage is concentrated in specific segments rather than spread evenly: 12 of the 80 units (15%) are in the Fair or Poor classes, and station 0+550–0+600 is among the worst in both directions. Alligator cracking is the dominant distress, and no high-severity distress was found. The westbound IKP (84.9) and the eastbound IKP (88.5) do not differ significantly (p = 0.27), nor do the two lanes. Most of the section needs only routine or periodic maintenance, while three westbound units require reconstruction or recycling. The results give a baseline for monitoring this corridor and for focusing maintenance on the damaged segments.