cover
Contact Name
Nurul Rochmah
Contact Email
nurul-rochmah@untag-sby.ac.id
Phone
+6285964020699
Journal Mail Official
jurnalextrapolasi@untag-sby.ac.id
Editorial Address
Jl. Semolowaru 45
Location
Kota surabaya,
Jawa timur
INDONESIA
Extrapolasi
ISSN : 16938259     EISSN : 2721978X     DOI : https://doi.org/10.30996/ep.v20i02
Core Subject : Engineering,
Focus and Scope Extrapolasi is published by Department of Civil Engineering Faculty of Technology, Universitas 17 Agustus 1945 Surabaya. The Extrapolasi editorial is very open in accepting articles related to : Building Materials and Structures Constructions Technology Constructions Management, Road and Bridge Engineering Earthquake Engineering, Geotechnical Engineering, Hydraulic Structures and Drainage Structural Engineering, Surveying and Geo-Spatial Engineering Transportation Engineering.
Articles 147 Documents
NALISIS BIAYA PROYEK DENGAN METODE EARNED VALUE DALAM PROSES KINERJA (Studi Kasus Pada Proyek Pembangunan Universitas Katholik Widya Mandala Pakuwon Citi-Surabaya) Witjaksana, Budi; Reresi, Samuel Petrik
EXTRAPOLASI Vol 5 No 02 (2012)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v5i02.819

Abstract

Nowadays construction projects grow bigger and more complicated both of physical aspects and costaspects, so it takes a project management from the initial phase to project completion phase. In each project.control measure is required in terms of cost and time. The earned value method combines elements ofschedule, cost, and job performance. Earned value analysis will be applied to development projects ofCatholic University Widya Mandala Pakuwon City Surabaya. The purpose of finding out its performance ismonitoring and controlling the project, so that when there is any deviation, certain action can be taken soon. This research based on the weekly report of the project work continuously for more than 11 (eleven) months.The advantage of this method is it’s able to describe the relationship between progresses with the allocatedbudget. Based on the analysis result on each review, the performance of the project will be known everyweek. Where at the end of the review, the project experienced schedule posponement. From the calculationresult that has been done, the project cost of the remaining work at the 42 weeks is Rp. 6.241.228.702,00 andthe total cost of the project at 42 weeks is Rp.10.864.777.052,29. It is recommended that in the research, datacollection process about direct costs and indirect costs must be surveyed in detail.Keywords : earned value, cost
KAJIAN STRUKTUR BANGUNAN GEDUNG POLITEKNIK PERKAPALAN ITS DENGAN SISTEM PLAT DAN BALOK BIASA KONVENSIONAL DIBANDINGKAN SISTEM STRUKTUR FLAT SLAB DENGAN DROP PANEL DITINJAU DARI ESTETIKA, BIAYA DAN WAKTU Munawar, Moch. Chairul
EXTRAPOLASI Vol 7 No 01 (2014)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v7i01.960

Abstract

Flat Slab merupakan sistem pelat dengan prinsip menggantikan fungsi balok sepanjang garis kolom dengan pelat lantai, sedangkan balok tepi boleh tetap diadakan. Flat slab mempunyai kekuatan geser cukup dengan adanya drop panel. Pembahasan ini adalah untuk mengetahui hasil dari sistem Flat Slab sekaligus perbandingan pelat dengan balok biasa konvensional, sehingga diketahui kelebihan dan kekurangan masing jenis struktur tersebut ditinjau dari estetika, biaya dan waktu pelaksanaan. Estetika disimpulkan bahwa fungsi bangunan dalam hal kajian ini mempunyai bobot yang sama tergantung karakteristik bangunan itu sendiri. Pada koridor manajemen konstruksi keefisienan dan keefektifan bukan berarti murah tapi bisa juga mahal, karena estetika mempunyai resiko lainnya. Mungkin juga mahal pada awalnya dan murah dari segi maintenancenya secara kontinyuitas. Dari segi biaya sistem Flat Slab hanyalah pada pekerjaan pembesian sedang pada sistem konvensional ditempati pekerjaan bekisting dan pembesian sehingga disimpulkan biaya lebih murah pada sistem struktur Flat Slab. Dari segi waktu terdapat selisih waktu pelaksanaan sekitar 1 hari bisa dilihat dalam analisis waktu sehingga disimpulkan penggunaan struktur Flat Slab lebih tepat. Hasil analisis ini dapat dijadikan referensi bagi perencana teknik sipil dan owner untuk menentukan jenis struktur yang diinginkan sesuai kebutuhan dan karakteristik jenis bangunan yang digunakan.Kata Kunci : Flat Slab, Drop Panel, Pelat dengan balok biasa konvensional
STUDI ANALISIS PEMODELAN BANGKITAN DAN TARIKAN LALU LINTAS (STUDI KASUS : SMAN 1 TAMAN DAN SMPN 2 TAMAN SIDOARJO) Handriyadi, Mokhammad Rahisa; Sarya, Gede; Rizkiardi, Aditya; Trimurtiningrum, Retno
EXTRAPOLASI Vol 17 No 1 (2020)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v17i1.3612

Abstract

AbstractIndonesia is an enormous country, it has about 266.91 million people. By the increment of population, it also affects the number of vehicles. However, it does not compensate by constructing the road, which causes congestion and production activation at school, industry, etc. This research purpose is to analyze the production and attraction at State High School 1 of Taman and Junior High School 2 of Taman – Sidoarjo.From the result, it can be seen that the production and attraction at State High School 1 of Taman and Junior High School 2 of Taman – Sidoarjo for motorcycle, the correlation test (r) is 1 and the Regression test is Y = 42.7142 + 0.2857 X of 112 teachers, for the shuttle the correlation test is 0.1 and the simple test Regression is Y = 1103.80 + 236 X of 2333 students, for public transportation the correlation test (r) is 1 and the simple test Regression is Y = 891.66 + 32.3 X of 2333 students. The maximum traffic volume occurs on Monday at 6.30 to 7.30 a.m. for Surabaya direction is 3923 vehicle/hour and Sidoarjo direction is 2276 vehicle/hour, and for degree saturation is obtained 0,97.AbstrakIndonesia adalah negara yang sangat besar, memiliki sekitar 266,91 juta penduduk. Dengan meningkatnya populasi orang, sangat mempengaruhi jumlah kendaraan. Namun, itu tidak diimbangi dengan pembangunan jalan, yang menyebabkan kemacetan dan aktivasi produksi di sekolah, industri, dll. Tujuan penelitian ini adalah untuk menganalisis bangkitan dan tarikan di SMA Negeri 1 Taman dan SMP 2 Taman – Sidoarjo.Dari hasil penelitian, dapat diketahui bahwa bangkitan dan tarikan pada SMA Negeri 1 Taman dan SMP 2 Taman - Sidoarjo untuk sepeda motor, uji korelasi (r) adalah 1 dan uji Regresi adalah Y = 42.7142 + 0,2857 X dari 112 guru, untuk antar jemput tes korelasi adalah 0,1 dan tes sederhana Regresi adalah Y = 1103,80 + 236 X dari 2333 siswa, untuk transportasi umum tes korelasi (r) adalah 1 dan tes sederhana Regresi adalah Y = 891,66 + 32,3 X dari 2333 siswa. Volume lalu lintas maksimum terjadi pada hari Senin pukul 6.30 hingga 7.30 pagi untuk arah Surabaya adalah 3923 kendaraan / jam dan arah
ANALISIS KOMPARATIF PENDAPATAN SCAFFOLDING/ ALAT PERANCAH KONSTRUKSI UNTUK PENGEMBANGAN PERUSAHAAN GENERAL CONTRACTOR PT. SANTOSO SHAFANARA ., Hudhiyantoro; Sudarmadi, Trisunu
EXTRAPOLASI Vol 5 No 01 (2012)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v5i01.810

Abstract

Penggunaan strategi yang baru dalam hal pemakaian sendiri alat perancah untuk digunakan dalampekerjaan konstruksi adalah ide pemikiran awal untuk inovasi perusahaan dalam rencana pengembanganinvestasi perusahaan. Investasi jangka panjang memerlukan biaya modal yang cukup besar dalampelaksanaannya, maka diperlukan perhitungan yang seksama sehingga tidak menimbulkan kerugian dalampengambilan keputusan. Dalam melakukan perluasan usaha, perusahaan memerlukan alat untukmenganalisis, yaitu dengan menggunakan studi kelayakan. Studi kelayakan merupakan proses perencanaandan pengambilan keputusan mengenai pelaksanaan proyek dan merupakan dasar pertimbangan untukmemutuskan apakah investasi dalam proyek tertentu dapat dilaksanakan atau tidak. Tujuan dari penelitian iniadalah : 1) Mengetahui pendapatan yang diperoleh dari alat perancah pada PT. Santosa Shafanara apabiladipakai sendiri. 2) Mengetahui pendapatan yang diperoleh dari alat perancah pada PT. Santoso Shafanaraapabila disewakan semua. 3) Mengetahui pendapatan yang diperoleh dari alat perancah pada PT. SantosoShafanara apabila sebagian dipakai sendiri dan sebagian disewakan. 4) Mengetahui persentase perbandingansewa dan dipakai sendiri yang optimal. 5) Menganalisa usaha pengembangan perusahaan PT. SantosoShafanara ditinjau dari analisa investasi.Metode yang digunakan dalam penelitian ini adalah deskriptifkuantitatif. Kesimpulan yang diperoleh dari hasil penelitian ini adalah 1) pendapatan perusahaan dari dipakaisendiri untuk proyek sebesar 31.72% atau Rp. 32.675.000 rupiah 2) dengan cara menyewakan mendapat nilaisebesar 55.25% atau Rp. 56.910.000 rupiah 3) dengan cara separuh sewa dan separuh dipakai sendiri sebesar13.03% atau Rp. 13.418.000 rupiah. 4) Dari analisa kriteria investasi terhadap PP = 0,312 tahun, nilai NPV=2.365.306.406 nilai IRR=4,28 % dan PI sebesar 10,65 (10.67 >1). Dari semua hasil analisa kriteria kelayakaninvestasi dengan metode PP, NPV, IRR dan PI maka untuk pengembangan perusahaan PT. Santoso ShafanaraGeneral Contractor sangat layak untuk dilaksanakan.Kata kunci : Perancah, Pendapatan, Kelayakan
ANALISIS SISTEM PENGELOLAAN SAMPAH DI KECAMATAN KARANGPLOSO KABUPATEN MALANG Sulistyono, Djoko
EXTRAPOLASI Vol 6 No 02 (2013)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v6i02.842

Abstract

Pengelolaan sampah di Kecamatan Karangploso merupakan suatu problem yang harus segera ditanganisaat ini, dikarenakan banyaknya komponen-komponen yang tidak mendukung dalam operasional baik ituperalatan, peraturan, pembiayaan, organisasi, serta peran serta masyarakat. Sampah adalah suatu bahan yangterbuang atau dibuang dari sumbernya hasil aktivitas manusia maupun proses alam yang belum memiliki nilaiekonomis. Manajemen pengelolaan sampah merupakan suatu sistem yang bertujuan untuk pencapaian targetkebersihan yang didukung oleh perangkat-perangkat berkaitan. Hasil evaluasi ini diharapkan dapat memberikanmasukan kepada pemerintah daerah khususnya pemerintah kabupaten Malang dalam mengambil kebijakandalam hal kebersihan dan kenyamanan wilayahnya. Dari hasil analisa dan perhitungan didapat banyaknyakebutuhan peralatan / perwadahan, alat pengumpul, kendaraan angkutan sampah dan TPA-nya, metode yangsesuai adalah metode pembuangan terkontrol, dengan peralatan 1 (satu) buah buldoser.Kata kunci : Sampah, Sistem Pengelolaan, Kebutuhan
ANALISA PENGARUH KINERJA MANDOR TERHADAP KUALITAS PROYEK KONSTRUKSI DI KOTA TUBAN ., Mushthofa
EXTRAPOLASI Vol 8 No 02 (2015)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v8i02.984

Abstract

This study analyzed the effect of the performance of supervisors on the quality of construction projects in the city of Tuban. Population of this research is the foreman who led the work force in the execution of a construction project in the city of Tuban. The number of samples in this study were 34 people foreman in construction projects with a value of more than Rp. 250 million and below a value of Rp. 5 Billion. Data collection techniques in this study by taking primary data to find data directly in construction projects and take a secondary data by searching the literature related to this research. Analysis of the data used in this study using multiple linear regression with a comparison of two methods, namely Enter and Stepwise method. Results were analyzed by both methods are equally demonstrate that capability foreman work has a significant influence on the quality of construction projects in the city of Tuban with sig. 0.000 <0.05. Predictive power of the regression model with the Enter method (R-square) which is formed in this test has a value of 94.1%, meaning that the foreman working ability has contributed to the quality of construction projects amounted to 94.1%, while the remaining 5.9% was influenced by variables other than a model. While stepwise (R-square) which is formed in this test has a value of 93.6%, meaning that the foreman working ability has contributed to the quality of construction projects amounted to 93.6%, while the remaining 6.4% is influenced by other variables outside the model. The conclusion from this study is that among the factors foreman performance which include: the ability to work foreman, work discipline foreman, the foreman relationship with the project organization and work motivation foreman, the most dominant influence on the quality of construction projects is the capability of working foreman.Keywords: ability, performance, quality
ANALISIS KELAYAKAN INVESTASI GEDUNG BIMBINGAN BELAJAR DI KABUPATEN JEMBER Santosa, Edi
EXTRAPOLASI Vol 6 No 02 (2013)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v6i02.833

Abstract

Peningkatan kesadaran masyarakat akan pentingnya pendidikan khususnya pendidikan non formal danjuga didukung dengan kenaikan pendapatan masyarakat mendorong tumbuh dan berkembangnya investasibisnis bimbingan belajar di seluruh Indonesia termasuk di dalamnya kabupaten Jember. Lembaga Bimbingan Belajar Delta merupakan salah satu bimbingan belajar yang ada di kota Jember.Selama ini Lembaga Bimbingan Belajar Delta menyewa sebuah gedung sebagai tempat proses belajarmengajarnya. Di dalam perkembangannya bimbingan belajar Delta mengalami peningkatan jumlah siswasetiap tahunnya. Untuk mengantisipasi jumlah siswa dan keinginan memiliki gedung yang ideal sebagaitempat bimbingan belajar maka bimbingan belajar Delta merencanakan membangun sebuah gedung di atassebuah lahan yang tersedia. Untuk itu dalam penelitian ini peneliti mencoba mencari seberapa besar investasi yang dibutuhkan danmenilai kelayakan investasi gedung bimbingan belajar tersebut. Untuk mengukur tingkat kelayakannya tidakhanya pada perhitungan aspek keuangan tetapi juga menganalisis aspek-aspek yang lain. Dari hasilperhitungan didapatkan nilai investasi total sebesar Rp 2.648.644.000 dan dari perhitungan aspek keuangandihasilkan NPV positif sebesar Rp 1.112.015.780, Payback Period yang dihasilkan 2 tahun 6 bulan 22 hari ,IRR sebesar 29,45 % dan Profitability Index sebesar 1,42.Kata kunci : Investasi, NPV
ANALISIS INVESTASI PEMBANGUNAN KOMPLEK VILA SWAGRIYA DI NYANYI TABANAN Gunawan, I Wayan
EXTRAPOLASI Vol 8 No 01 (2015)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v8i01.975

Abstract

Dalam penelitian ini dilakukan penelitian tentang pembangunan penginapan  atau villa, salah satunya adalah pembangunan villa yang berada di Villa Swagriya Nyanyi, Desa Braban, Tabanan, Bali. Maka dari itu diperlukan analisis kelayakan investasi. Tujuan penelitian ini adalah untuk mengidentifikasi kelayakan investasi pembangunan Komplek Vila Swagriya di Nyanyi Tabanan.  Jenis penelitian ini termasuk penelitian deskriptif. Metode pengumpulan data dilakukan dengan melakukan interview, observasi dan wawancara. Teknik analisis data dalam penelitian ini menggunakan analisis studi kelayakan keuangan meliputi Net Present Value, Revenue Cost Ratio, dan Internal Rate of Return.  Hasil kesimpulan yang diperoleh ialah : a) Proyek pembangunan villa dan restoran ini menelan investasi sebesar Rp. 1.991.523.593,- dengan rincian bangunan Rp. 1.680.523.595,- dan peralatan Rp. 311.000.000,-. Jangka waktu investasi 5 tahun dengan nilai sisa 10% untuk bangunan. Laju Inflasi menurut data BPS per September 2014 sebesar 4,14% dan tingkat suku bunga 12%; b) Villa ini dilengkapi dengan 20 kamar serta restoran. Target okupansi sebesar 50% untuk senin sampai jun’at dan 80% untuk sabtu sampai minggu. Tarif sewa untuk villa sebesar Rp. 400.000,- untuk senin sampai jum’at sedangkan untuk sabtu dan minggu sebesar Rp. 500.000,-; dan c) Analisis kelayakan proyek pembangunan villa dan restoran dengan diperoleh Net Present Value menunjukkan nilai positif sebesar Rp.1.618.532.039,-., Internal Rate of Return menunjukkan nilai positif sebesar 25,63711198% dibulatkan 25,64%., dan Revenue and Cost Ratio menunjukkan nilai positif sebesar 3,924.Kata kunci : Studi Kelayakan Investasi 
PERENCANAAN POLA TANAM PADA JARINGAN IRIGASI GANGSIRAN DESA TEBEL KABUPATEN JOMBANG Saves, Faradlillah
EXTRAPOLASI Vol 18 No 1 (2021)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v18i1.5216

Abstract

AbstractThe availability ofiwateriin the jombang area tends to be uneven because it is influenced by the rain and dry season. This makes the implementation of the cropping pattern in the village of Tebel Bareng district not in accordance with the available water availability, to obtain maximum production a goog irrigation system management is required. By conducting an analysis to determine the value of the monthly reliable discharge with the transformation of monthly rainfall data, water requirements and cropping patterns are expectedito be able to overcome problems that occur in the existing irrigation network in Tebel village Bareng sub-district Jombang district. To find out the average rainfalliusingitheialgebraic averageimethod with 10 years of rainfall data, then to find out the evapotranspiration is calculated using the penman method and reliable discharge calculations using the FJ Mock method. From the results of the analysis on the village irrigation in Tebel the reliable discharge value is 0,0165 m³/sec. Analysis of rrigation water needs was carried out using 24 alternatives. TheiNFR value of 88,29 mm/day was converted to 0,001021875 m³/sec or 10,022 l/sec. The alternative used is the 24 th alternative with the initial planting period in December II period. The cropping pettern used is paddy-paddy-secondary crops.AbstrakKetersediaan air didaerah jombang cenderung tidak merata karena dipengaruhi oleh musim hujan dan kemarau. Hal itu membuat pelaksanaan pola tanam di desa Tebel Kecamatan Bareng tidak sesuai dengan ketersediaan air yang ada, sehinga untuk mendapatkan hasil produksi yang maksimal diperlukan sebuah pengelolahan sistem irigasi yang baik. Dengan melakukan analisis untuk mengetahui nilai debit andalan bulanan dengan transformasi data curah hujan bulanan, kebutuhan air dan pola tata tanam diharapkan mampu mengatasi masalah yang terjadi pada jaringan irigasi yang ada di Desa Tebal Kecamatan Bareng Kabupaten Jombang. Untuk mengetahui curah hujan rata-rata menggunakan metode rata-rata aljabar dengan data curah hujan 10 tahun, lalu untuk mengetahui evapotranspirasi dihitung menggunakan metode penman dan perhitungan debit andalan diperoleh dengan menggunakan metode FJ. Mock. Dari hasil analisis pada daerah irigasi desa Tebel diperoleh nilai debit andalan sebesar 0,0165 m³/detik. Analisis kebutuhan air irigasi dilakukan menggunakan 24ialternatif Didapat nilai NFR sebesar 88,29 mm/hari dikonversikan menjadi 0,001021875 m³/detik atau 10,022 lt/detik. Alternatifiyang digunakan adalah alternatifike 24 dengan masa awal tanam pada Desember priode II. Pola tanam yang digunakan adalah padi-padi-palawija.
ANALYSIS COMPARISON OF LIGHTWEIGHT CONCRETE WALL WITH M-SYSTEM WALL (Case Study Providentia Dei Dormitory Project) ., Suzaeni
EXTRAPOLASI Vol 6 No 01 (2013)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v6i01.824

Abstract

In construction project activity required innovation in order to achieve the main objectives andtargets that the project quality, cost and time. On the selection of building materials to be used, will havea considerable impact on project cost and schedule planning. Lightweight Concrete ( autoclaved AeratedConcrete ) is a product of high-tech brick that can help to entered a new era in construction. AdvantageLightweight Concrete is high-quality raw materials and environmentally friendly. Simplicity, fastnessand tidiness of the implementation is advantages of Lightweight Concrete. M-Systems is a technology inbuilding materials using a modified polystyrene as a load resistant element. Polystyrene modification isdone by providing high quality wire mesh frame and polystyrene coated with a relatively thin layer ofcoating. The advantages of the M-System 's technology is not only strength load resistant, but alsoenvironmentally friendly, lighter, fire resistant, sound-proofed and strength resistant.This research aims to compare the used of Lightweight Concrete wall with M - System wall by analyzingthe difference of price.The results has got from this research is M-System wall 2.63 times more expensive than the LightweightConcrete.Keywords: Lightweight Concrete, M-System, Polystyrene, price analysis.

Page 7 of 15 | Total Record : 147