cover
Contact Name
Sugeng Santoso
Contact Email
sugeng.santoso@mercubuana.ac.id
Phone
+6282132044774
Journal Mail Official
ti.jurnal@umm.ac.id
Editorial Address
Departement Industrial Engineering University of Muhammadiyah Malang Jl. Tlogomas No 246 Malang
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknik Industri
ISSN : 19781431     EISSN : 25274112     DOI : -
Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality Function Deployment is a tool which design some needs include customers represented as a voice of customer and including some competitions and also groups some activities that usually called affinity graphic ang getting a benchmarking for it is competition. From the result analysis can be showed that main attribute for patience is a accuracy. And from House Of Quality can be found that getting a periodic meeting to evaluate this hospital and also increase a service can be made 20 concept
Articles 717 Documents
Implementasi Kaizen Dan 5S Pada Pengeringan Produk Di Proses Plating Soesilo, Rahman
Jurnal Teknik Industri Vol 18, No 2 (2017): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (321.593 KB) | DOI: 10.22219/JTIUMM.Vol18.No2.121-126

Abstract

Innovation can be made of small things in our routine activities.  Seiri (sort), Seiton (set in order), Seiso (shine), Seiketsu (standards), and Shitsuke (sustain) is 5 words in Japanese, which is a systematic technique in correlation with efficiency. Kaizen has been widely known in the world as continuous improvement through small steps that affect the economy of the company. This system helps the management to manage the workplace, improve discipline, reduce waste and increase productivity. NGK Busi Indonesia is one of the companies owned by the Japanese spark plug that upholds the quality control contributed significantly to the implementation of Kaizen and 5S. This study explores the innovative implementation of 5S Kaizen refers to that applied in the production  floor. Direct observation was made as basic methodology of this study. PT NGK Busi Indonesia always fix some work through Kaizen techniques to improve efficiency.
Penentuan Dan Pengembangan Kompetensi Inti Kabupaten Bekasi Nurcahyo, Rahmat; Farizal, Farizal; Stiadi, Edwin; Saparudin, Saparudin
Jurnal Teknik Industri Vol 13, No 1 (2012): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (199.105 KB) | DOI: 10.22219/JTIUMM.Vol13.No1.37-42

Abstract

Development of a region is a vital issue for the survival of the area. One way for development of a region is based on core competence. This research discusses the core competence of Bekasi region for development. This research methodsare Analytic Hierarchy Process and Interpretive Structural Modeling. Results from this research is a road map model for Bekasi region development, based on small and medium enterprises in food and beverage industry.
The measurement of Physical Workload and Mental Workload Level of Medical Personnel Restuputri, Dian Palupi; Pangesti, Anindia Karunia; Garside, Annisa Kesy
Jurnal Teknik Industri Vol 20, No 1 (2019): February
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (627.18 KB) | DOI: 10.22219/JTIUMM.Vol20.No1.34-44

Abstract

As the primary health reference center, a hospital is required to provide excellent quality services to each patient. The impact of the extreme physical and mental workload cause negligence in activities. It affects the quality of services provided by medical personnel. This study investigated the level of mental workload and physical workload in medical staff in a hospital. This study was conducted at 15 units in the hospital. The mental workload was assessed using the NASA-TLX Questionnaire. The physical workload analysis was carried out with the Heart Rate reserve percentage of medical personnel. The results of this study show that the mental workload on nurses in the ICU is higher than the other units. Whereas the calculation of physical load using% HR reserve turns out the head of the nurse in-unit class 1 has the highest value compared to the others unit. The statistical analysis showed there was a difference in the general practitioner workload toward the Head of the Nursing.
Lean Production: A Way To Reduce The Internal Inventory And Cycle Time Mas'udin, Ilyas
Jurnal Teknik Industri Vol 8, No 2 (2007): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (884.957 KB) | DOI: 10.22219/JTIUMM.Vol8.No2.99-107

Abstract

The progressive competition among industries and the increase of customer expectation will lead the progressive efforts in reducing the cost of production and logistic activities in the future. The companies (mass production, job shop and service industries) are forced to tighten their production process effectively by cutting the unnecessary activities in logistic flow, delete dummy and redundant elements, specializing the core business, and eliminate the wastes to simple and make their production process is more competitive. The lean concept could be the alternative way to reduce the main wastes: inventories and production cycle time. Eventhough it is very expensive to implement the lean production in the shop floor production, but the waste elimination and continuous improvement as the main key of the lean thinking has promised a significant improvement and profit for companies which implement the concept. The tools that could be used as methods to make the production process leaner such as just in time with kanban card system, kitting principle, collaborative scheduling and production plan, group technology, cell manufacture design and line balancing are well implemented in the worldwide. The efforts in leaning production will continue due to the lean thinking basically try to make the system better and believe that there is no best system but there is always better system. 
Analisis Kelayakan Pendirian Unit Produksi di Universitas (Studi Kasus Industri Minyak Atsiri) Mubin, Ahmad
Jurnal Teknik Industri Vol 3, No 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3602.652 KB) | DOI: 10.22219/JTIUMM.Vol3.No1.12-21

Abstract

The establishment of production unit requires fairly high investment, therefore to avoid the investment connducted which in fact will be unprofitable in the future, before implementing such investment, the comprehensive analysis or feasibility study is required, concerning marketing, technical financial management, and social-economyn alysis.From the result of feasibilitiy studythe level of feasibility for the establishment of production or business units is determined. In this case study, the subject of study is production of essential oil that serves as raw material for food, pharmacy, and parfume manufactures. Based on the analysis result of market and marketing aspects, as well as technical and Technology aspects, it was  ndicated that the proposal of production unitestablishment feasible to beaccepted. Likewise, the result of financial analysis with the methods of Net present value, Profitability Index(B /C ratio), Internal Rate of Return and payback period,indicated that the proposal of production unitestablishmeint is feasibleto be accepted.
Evaluasi Beban Kerja Manual (Studi Kasus UD Sumber Makmur Medan) Kodrat, Kimberly Febrina
Jurnal Teknik Industri Vol 14, No 2 (2013): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (170.064 KB) | DOI: 10.22219/JTIUMM.Vol14.No2.186-191

Abstract

UD Sumber Makmur is one of the home industries producing snacks especially cassava chips with various kinds of flavor. Packaging process is still performed manually through utilizing the physical power of workers. This research aims to evaluate manual workload in the particular tasks. The research object includes two groups of task which are group A (associated with production tasks) and group B (associated with packaging tasks). According to the result, it shows that average physical workload in both groups is constants and it is included in light-medium work category. The break time required by workers in group A and B respectively is 31 minutes and 45 minutes.
Penerapan Metode Six Sigma sebagai Usaha untuk Memperkecil Kecacatan Produk Fraypan Merek Revere Were di CV. Corning Sidoarjo Putra, Boy Isma
Jurnal Teknik Industri Vol 11, No 2 (2010): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (250.768 KB) | DOI: 10.22219/JTIUMM.Vol11.No2.134-142

Abstract

CV. Corning Sidoarjo is a home furnishings industry, one product is kitchen furniture brand Revere Was able to produce as many as ± 34.152 units per year. Production conditions of Revere Ware brand products now has the highest number of defective products within each sub process: press, press cutting (cut), roll process, and mashed process 2.436 units per year or approximately 7.13% of total production per year. Based on these data, CV. Corning Sidoarjo trying to reduce the defect rate of products by determining the performance of initial conditions (baseline) and performance targets to be achieved by using Six Sigma methods. With Six Sigma methods can be obtained performance targets aimed at reducing the level of defects in each sub-process, namely: The process of pressing, the  process of cutting, coil processing, and mashed process of  2.292 units per year or approximately 6.71% of total production per year.
Analisis Keandalan untuk Menentukan Interval Penggantian Komponen Slotter (Fine Adjusting Block dan Back Knife Transmission Gear) pada Mesin Flexo Ps 429” Yulianto, Fery; Nilasari, Vicka Annisa
Jurnal Teknik Industri Vol 9, No 1 (2008): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (185.22 KB) | DOI: 10.22219/JTIUMM.Vol9.No1.88-94

Abstract

PT. Prima Box Adiperkasa Pandaan is a manufacturing company which producing cartoon box which the production processing is mostly use an automatic machine. The Flexo PS 429 is a machine which playing an important role in cutting and printing procession which often being damage, as a consequence it need to be supported with the program and activity of a regular treatment of the machines production. The problem that is faced was how to determine the optimal time interval of to replace the component so the productions can be process according to the target which has been specified. The objective of the research is to determine the time interval to replace the slotter component (back knife transmission gear and fine adjusting block) as an effort to prevent the damage the replacement cost which optimal with the reliability level above 70% (> = 0.7). The model which used to determine the time interval replacement component in this research is use an age replacement model with the minimum cost criteria. In this method of component replacement according to the international which have been done before the damage happen. From the obtained result of data analysis that the optimal international replacement of the back knife transmission gear component is 18 days with the prevention cost replacement is equal to Rp29,870 and the reliability is 0.832 (83.2%). Where as for fine adjusting block component in 12 days interval with the prevention cost replacement is equal to 16.970 and reliability is 0.925 (92.5). So at 12 month by conducting a cost saving prevention replacement of the back knife transmission gear company is 7,06% or equal to Rp681,001.44. For fine adjusting block component, by conducting a cost – saving is 49.66% or equal Rp5.002.866,7.
Penerapan Konsep Crossdocking untuk Menurunkan Persediaan di PT. Coca Cola Distribusi Malang Mubin, Ahmad
Jurnal Teknik Industri Vol 4, No 2 (2003)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3533.431 KB) | DOI: 10.22219/JTIUMM.Vol4.No2.30-39

Abstract

This Final duty produce design model distribution system for the finished of problems of product distibution stream. Method which used in system model is method of Crossdocking. Crossdocking used as by method to schedule delivery of product. Ther€ is two step scheduling of delivery, first of scheduling of delivery of factory Sales Center and both scheduling of shipping ofsales Center - outlet. Crossdocking repr€sent distribution melhod as a mean to minimize of is expense of supply, Crossdocking applied by functioned Sales Centar as facility of Crossdock, where at its distribution process of product sent from factory to outlet pass Sales Center without passing inventory storage process. Scheduling of first phase cover amounl, time, target of delivery, and used vehicle. By the end of this system device done by calculation of safety stock as anticipation to avoid stock out to demand of final consumer. Of device model this Crossdockingc an be yielded decrease of inventoryl evel in Sales Center, and decrease of transportation cost from factory to Sales Center.
Perancangan Integrated Environmental Performance Measurement System Di Rumah Sakit Kurniawan, Chandra; Mubin, Ahmad; Kholik, Heri Mujayin
Jurnal Teknik Industri Vol 18, No 1 (2017): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (409.406 KB) | DOI: 10.22219/JTIUMM.Vol18.No1.9-18

Abstract

Waste has a negative impact on the environment. Hospital medical waste is a hazardous waste for the environment. Environmental performance measurement systems are used to measure the performance of hospitals in handling waste. The measurement of its environmental performance in the hospital is expected to provide improved sewage treatment systems. AHP (Analytical Hierarchy Process) and OMAX (Objactive Matrix) methods are used to design environmental performance systems at hospitals. The data needed is medical and non medical treatment. Data were collected using pairwise comparison questionnaires. The questionnaire data shows the importance of key environmental performance indicators (KEPI). Results of questionnaires processed using Expert Choice. Expert Choice's output produces weight and consistency ratio. Weighted KEPI results are processed by OMAX method. The OMAX method is used to determine the value of environmental performance. There 41 KEPI aspects of the environment. Based on the results of the environmental performance assessment, liquid waste has the highest weight of 0.229. 

Filter by Year

2000 2024


Filter By Issues
All Issue Vol. 25 No. 2 (2024): August Vol. 25 No. 1 (2024): February Vol. 24 No. 2 (2023): August Vol. 24 No. 1 (2023): February Vol. 23 No. 2 (2022): August Vol. 23 No. 1 (2022): February Vol. 22 No. 2 (2021): August Vol. 22 No. 1 (2021): February Vol. 21 No. 2 (2020): August Vol. 21 No. 1 (2020): February Vol 21, No 1 (2020): February Vol. 20 No. 2 (2019): August Vol 20, No 2 (2019): August Vol 20, No 1 (2019): February Vol. 20 No. 1 (2019): February Vol. 19 No. 2 (2018): Agustus Vol 19, No 2 (2018): Agustus Vol 19, No 1 (2018): Februari Vol. 19 No. 1 (2018): Februari Vol. 18 No. 2 (2017): Agustus Vol 18, No 2 (2017): Agustus Vol. 18 No. 1 (2017): Februari Vol 18, No 1 (2017): Februari Vol 17, No 2 (2016): Agustus Vol. 17 No. 2 (2016): Agustus Vol. 17 No. 1 (2016): Februari Vol 17, No 1 (2016): Februari Vol. 16 No. 2 (2015): Agustus Vol 16, No 2 (2015): Agustus Vol. 16 No. 1 (2015): Februari Vol 16, No 1 (2015): Februari Vol 15, No 2 (2014): Agustus Vol. 15 No. 2 (2014): Agustus Vol. 15 No. 1 (2014): Februari Vol 15, No 1 (2014): Februari Vol 14, No 2 (2013): Agustus Vol. 14 No. 2 (2013): Agustus Vol 13, No 2 (2012): Agustus Vol. 13 No. 2 (2012): Agustus Vol 13, No 1 (2012): Februari Vol. 13 No. 1 (2012): Februari Vol. 12 No. 2 (2011): Agustus Vol 12, No 2 (2011): Agustus Vol. 12 No. 1 (2011): Februari Vol 12, No 1 (2011): Februari Vol 11, No 2 (2010): Agustus Vol. 11 No. 2 (2010): Agustus Vol 11, No 1 (2010): Februari Vol. 11 No. 1 (2010): Februari Vol. 10 No. 2 (2009): Agustus Vol 10, No 2 (2009): Agustus Vol. 10 No. 1 (2009): Februari Vol 10, No 1 (2009): Februari Vol. 9 No. 2 (2008): Agustus Vol 9, No 2 (2008): Agustus Vol 9, No 1 (2008): Februari Vol. 9 No. 1 (2008): Februari Vol. 8 No. 2 (2007): Agustus Vol 8, No 2 (2007): Agustus Vol. 8 No. 1 (2007): Februari Vol 8, No 1 (2007): Februari Vol 4, No 2 (2003) Vol. 4 No. 2 (2003) Vol 3, No 2 (2002) Vol. 3 No. 2 (2002) Vol 3, No 1 (2002) Vol. 3 No. 1 (2002) Vol 2, No 2 (2001) Vol. 2 No. 2 (2001) Vol 2, No 1 (2001) Vol. 2 No. 1 (2001) Vol 1, No 2 (2000) Vol. 1 No. 2 (2000) Vol. 1 No. 1 (2000) Vol 1, No 1 (2000) More Issue