cover
Contact Name
Veri Hardinansyah Dja'far
Contact Email
Proaksaraglobal@gmail.com
Phone
-
Journal Mail Official
Proaksaraglobal@gmail.com
Editorial Address
Bumi Royal Park Blok A-14, Jalan Kyai Parseh Jaya, Kelurahan Bumiayu, Kec. Kedungkandang, Kota Malang 65135, Malang, Provinsi Jawa Timur, 65135
Location
Kota malang,
Jawa timur
INDONESIA
International Journal of Social Science and Community Service
ISSN : -     EISSN : 30475406     DOI : https://doi.org/10.70865/ijsscs
The International Journal of Social Science and Community Service publishes a series of articles focused on community service initiatives in the area of economic empowerment. This journal aims to contribute ideas and reports on community service efforts, as well as serve as a platform for sharing these activities within the realm of community economic development. Its mission is to promote innovative concepts and research outcomes related to community service efforts. The journal primarily addresses key issues in the advancement of community service sciences, with particular emphasis on: Community Services, People, International Food Security, Training, Marketing, Appropriate Technology, Design, Community Empowerment, Social Access, Student Community Services, Border Regions, Less Developed Areas, and Sustainable Development Education.
Articles 175 Documents
Acceleration Cost Analysis with Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1) Hartawan, Ade Sholeh; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.11

Abstract

In a construction project, preparation work typically includes tasks related to setting up work facilities, conducting field investigations, obtaining permits, and non-structural activities. The Jakarta Sewerage Development Project Zone 1, Package 2, which involves the construction of sewers in Area 1-1, is currently in the preparation phase and is experiencing challenges due to a complex permit process. This has led to minimal progress as the initial project planning did not consider the time needed to secure the necessary permits for implementation. The author is therefore evaluating the project timeline to gauge performance during the preparation phase before actual construction begins. This study utilizes the Critical Path Method (CPM) scheduling technique in Microsoft Project to pinpoint critical activities. Upon analysis, it was found that the budget plan for Package 2 of the Jakarta Sewerage Development Project (Zone 1) was detailed and included various work descriptions, with a total budget of IDR 862,292,086,196. However, delays have occurred, resulting in a 17-day setback in the project schedule, necessitating work acceleration. To bring the project duration back in line with the original schedule as per the contract, acceleration was required. This was carried out on the Shaft Construction C-8.1, which was initially set to take 80 days but was shortened to 63 days through time acceleration, incurring a cost of IDR 23,279,288.
Analysis of Investment Sensitivity in The Construction of The Gelora Bung Tomo Surabaya Circuit Sulistianto, Leo Agus; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.12

Abstract

Provision of Sports Prasarana is an attempt to fulfill the basic rights of the public to obtain services in sports activities, as listed in Law of the Republic of Indonesia Number 11 of 2022 concerning Sports 2022. The growing automotive industry is one important sector that significantly contributes to Indonesian economic growth. Based on the Surabaya City for 2021-2026 calls for the creation of an integrated area, with the Gelora Bung Tomo area serving as an international sports center and integrating with the growth of trade and service functions in Surabaya's surrounding areas. The aim of this study is to measure the amount of investment income and revenue limits in an effort to reduce the risks associated with the investment in the circuit. We carry out flow calculations using the Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP) methods, and then analyze the sensitivity. We reviewed the sensitivity analysis based on several parameters, including commercial rent income and circuit management costs. The development of Tomo's Gelora Circuit is sensitive to a loss of income from the rental of business or commercial premises of 8%, which will affect a decline in profit, resulting in a negative net present value (NPV) and prolonging the rate of return. Additionally, it is sensitive to an increase in management costs by 12%.
Utilization of Social Media in Building Social Customer Relationship Management in SMEs Rodhiah, Rodhiah; Christinio, Elizabeth; Chrstianto, Einstein
International Journal of Social Science and Community Service Vol. 2 No. 1 (2024): JANUARY
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i1.13

Abstract

Social media is growing rapidly and continuously. An organization with a social CRM system will build better relationships with customers, grow and gain trust and confidence... The activity partner is engaged in the business of creative handicraft products located in Serang, Banten province. In its activities, it faces problems, especially in terms of building social customer relationship management. PKM aims to assist partners in an effort to increase knowledge about Social Media Utilization in Building Social Customer Relationship Management. The activity method is carried out by training related to CRMS which is presented in the form of PPT including: understanding of social media, Social Media Strategy Versus SCRM, the main objectives of SCRM and so on. The training was conducted online with the assistance of 2 students. The results of the activity show that the provision of knowledge about social customer relationship management delivered in the form of PPT has been realized and is running smoothly. from the evaluation results the material has been understood well. Evidenced by the answers of partners who 100% can understand and understand the material presented.
Salesperson Training as an Effective Tool to Increase SME Sales Djakasaputra, Arifin; Christinio, Elizabeth; Jayanti, Yunia Arinda
International Journal of Social Science and Community Service Vol. 2 No. 2 (2024): APRIL
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i2.14

Abstract

As a salesperson / personal selling / salesperson is the key to success in generating the buying process. Personal selling is an effective tool to build preferences, beliefs, and purchase actions. For this reason, business owners must increase their expertise which can be achieved through salles training in using adequate facilities. As a seller, you must master every product or service that the company sells. The purpose of the activity is to help business owners have a stock of knowledge about salespeople, so that business owners can increase sales of the products produced. The partner chosen in the PKM activity is engaged in a culinary business domiciled in Jambi. The method offered to partners is training/socialization which includes an introduction to salespeople, characteristics, forms, principles and goals and benefits. Presented in the form of PPT and conducted online. The results of the activity show that partners can optimize personal selling skills in offering products to end consumers, as evidenced by the results of the evaluation of the answers to the questionnaires given to partners showing 100% can understand the material presented.
Analysis of Road Damage Using the Bina Marga Method on the Lamongan City - Mojokerto Border Road Section Mashudi, Anang; Muhammadun, Haris; Marleno, Risma
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.15

Abstract

Road as an important facility for the community to achieve a desired goal both mobilizing goods and services. On the Lamongan City – Mojokerto Regency Border Road Section of STA 20+000 - 26+000 based on the field has experienced a decrease in road services that are not stable / comfortable with a lot of damage to the road. This study aims to determine the priority order value of road surface damage based on the Bina Marga method, determine the handling of road maintenance and the cost of handling road maintenance based on the two methods. From the results of the research, the priority order value of road damage on the Lamongan City - Mojokerto Border Road Section of STA 20+000 - 26+000 with the Bina Marga method is the priority order value of road damage 5.5, this includes a periodic maintenance handling program, the cost of handling road maintenance with the Bina Marga method is Rp. 9,479,663,479.46.
Training on Processing Inventory Transactions for Accounting Teachers at the Tangerang City Financial and Institutional Accounting Teacher Association (MGMP) Minanari, Minanari; Astuti, Retno Puji; Arini, Lusia Sri
International Journal of Social Science and Community Service Vol. 2 No. 2 (2024): APRIL
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i2.16

Abstract

Improving the quality of SMK graduates so that they can meet industry needs is one of the objectives of the community service project carried out by the Team in collaboration with MGMP (Musyawarah Guru Mata Pelajaran) Accounting partners and financial institutions in the Tangerang City area. Financial statements function as a tool to analyze financial performance, providing information about financial position, business operations, performance, and cash flow, which can be used as a basis for making economic decisions. The purpose of this service program is to offer assistance and training in interpreting transaction evidence, managing it within the accounting cycle, and producing financial reports. This training includes not only purchase transactions but also various transactions related to sales, cash receipts, cash disbursements, adjusting journal entries, and tax-related matters. One challenge faced by partners is the need for assistance in updating financial accounting standards and taxation standards. The implementation method begins with providing assistance and training in the preparation of Excel-based transactions to enhance partners' understanding and knowledge of accounting. The second stage involves discussing the results of the interpretation of transaction evidence within the accounting cycle and tax treatment. The third stage is the preparation of financial statements as a result of this community service. The outcomes of the community service project indicate an increase in partners' ability to manage business transactions in accordance with current accounting and tax standards.
Accounting Skill Boost: Exclusive Cash Transaction Training for Tangerang City Accounting MGMP Teachers Kwarto, Febrian; Budyastuti, Triyani
International Journal of Social Science and Community Service Vol. 2 No. 3 (2024): JULY
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i3.17

Abstract

The exclusive training of cash transaction for Subject Teacher Consultation Meeting (MGMP) in Tangerang City aims to improve their competence and understanding in managing cash transactions. This study used direct experimental method to evaluate the effectiveness of the training. Data were collected through discussions and direct interviews to understand participants' perceptions and experiences. The results of this activity showed that the training was successful in significantly improving teachers' competencies. Qualitatively, it revealed that participants felt more confident in teaching cash transactions and were very satisfied with the interactive and relevant teaching methods. In addition, participants reported that this training provided practical skills that can be directly applied in teaching. The conclusion of this training not only improves the competence of individual teachers but also contributes to improving the quality of accounting education in Tangerang City. This study confirms the importance of training that is tailored to the specific needs of participants to achieve optimal results, supporting the findings of previous studies on the positive impact of professional training on education quality.
Analysis of Remaining Project Cost Estimate Temporary Schedule (ETS) & Final Project Time Estimate All Schedule (EAS) Saputra, Edwin Octavianto; Muhammadun, Haris; Marleno, Risma
International Journal of Social Science and Community Service Vol. 2 No. 3 (2024): JULY
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i3.18

Abstract

The wheat silo and pellet silo structure repair project phase 3 by PT ISM Bogasari Surabaya is an annual infrastructure maintenance and strengthening activity aimed at supporting the smooth production process. Therefore, it is crucial to complete the project on time according to the contract to proceed to the next stage of repair and avoid delays that could result in cost overruns. This study uses Earned Value Method (EVM) analysis to address these issues and assess the performance of costs and implementation time as the project progresses. The indicators used in the analysis include the calculation of Estimated To Complete (ETC) and Estimated At Complete (EAC) for forecasting project completion costs, and Estimated Temporary Schedule (ETS) and Estimated All Schedule (EAS) for forecasting project completion time. Based on the results of the cost and time performance analysis, the EAC value is 0.77% smaller, which is Rp. 21,825,605,678, compared to the contract value. The time to complete the EAS project is 481 days, with an addition of 26 days, resulting in a 0.6% longer project completion time.
Implementation of Cognitive Behavior Therapy (CBT) To Overcome The Friendship Relations of FM Children Victims of Bullying in Bandung City Subardhini, Meiti; Maryami, Ami; Riyadi, Sabar
International Journal of Social Science and Community Service Vol. 2 No. 1 (2024): JANUARY
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i1.19

Abstract

This study examines the implementation of behavior change techniques in specific behaviors that have been identified to impact the friendship relationships of children who have experienced bullying. The objective of this research is to provide a comprehensive description of the application of behavior change techniques in friendship relationships, focusing on cognitive and behavioral aspects. The research adopts a Single Subject Design approach, with the participants being children who have been victims of bullying in the city of Bandung. The measurement instruments used include baseline A1, treatment (B1), and baseline A2, which were determined based on the results of behavioral assessments. Through this process, 25 specific behaviors were identified and analyzed. The application of behavior change techniques aims to address maladaptive behaviors in children. The techniques employed include nourishment, systematic desensitization, and task center techniques. The findings of this research indicate that children who have experienced bullying demonstrate improvements in cognitive and behavioral aspects, as evidenced by the measurements taken during the baseline and intervention phases.
Cost, Time and Pavement Alternatives Analysis of Technical and Costs Budiyanto, Arief; Muhammadun, Haris; Marleno, Risma
International Journal of Social Science and Community Service Vol. 2 No. 2 (2024): APRIL
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i2.20

Abstract

The research on the Teuku Umar Road - Rajawali Road Preservation project aims to find out the technical calculations, costs and time so that a more efficient alternative can be chosen. The calculation analysis on Rigid Pavement and Flexible Pavement uses the Road Pavement Design Manual Method No. 02 / M / BM / 2017 with a 20-year plan life. In the calculation of the AHSP cost analysis of the Highways Sector in accordance with Permen PUPR No. 8 of 2023. Periodic maintenance costs for rigid pavement are 6% and routine maintenance costs on flexible pavement are 2% while periodic maintenance costs are 8% of the initial budget. The results of this research analysis show the cost of rigid pavement is Rp. 11,349,200,000 and the implementation time is 120 calendar days. While the cost of flexible pavement is Rp. 8,414,500,000 and the implementation time is 95 calendar days. The results of the calculation of choosing a more efficient alternative based on the calculation of Capitalized Cost show that rigid pavement in terms of cost is smaller than flexible pavement, so rigid pavement alternatives are chosen.

Page 2 of 18 | Total Record : 175