cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota malang,
Jawa timur
INDONESIA
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia
ISSN : -     EISSN : 2548771X     DOI : -
Focus and Scope of this journal are : Chemical Engineering including : bioenergy processing, environmental engineering, natural resource management, Heat and Mass Transfer, Chemical Reaction, Analytical Chemistry, Biochemistry, Designing tools and chemical processes, Chemical industry process, Computing and modeling (simulation) process, Particle and nano technology, membrane technology, esessential oil technology, and phytopharmaca, etc. Civil Engineering including : technology of construction materials, transportation system, environmental layout, concrete and wood structures, steel construction, bridge and dam construction, management of water resources and Hydrology, earthquake engineering, sanitation systems and urban drainage. eUREKA is published twice a year on Juni and December by Engineering Faculty of Universitas Tribhuwana Tunggadewi Malang
Arjuna Subject : -
Articles 160 Documents
Analisis Lapisan Tambahan (Overlay) di Ruas Jalan Pembangunan Pemangkat-Tebas STA 8+500-9+500 Kabupaten Sambas Mustaqim, Mustaqim; Arifianto, Andy Kristafi; Rahma, Pamela Dinar
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 2, No 2 (2018)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (531.541 KB)

Abstract

ABSTRAK Jalan di Kalimantan Barat Kabupaten Sambas tersebut merupakan harapan masyarakat, yang mana selama ini jalan yang mereka lalu kurang layak sehingga di perlukan perbaikan sebagai mana mestinya, sehingga masyarakat sambas bisa beraktifitas melakukan pekerjaan seperti biasanya. Tujuan dari penulisan penelitian ini adalah untuk mengetahui karakteristik jalan, untuk menganalisis tebal lapisan tambahan (overlay), untuk mengetahui prediksi volume lalu lintas 5 tahun yang akan datang, dan untuk menganalisis drainase di ruas jalan Pembangunan Pemangkat-Tebas STA 8+500–9+500 Kabupaten Sambas. Metode dalam penelitian ini menggunakan metode pengumpulan data dan metode survei. Dalam metode pengumpulan data ini dibagi menjadi menjadi dua yaitu, data primer dan data sekunder. Data primer didapatkan dengan cara observasi lapangan dan hambatan samping. Data sekunder didapatkan dengan cara studi literatur dan survei instansi. Sedangkan metode survei didapatkan dengan cara survei lalu lintas dan persiapan survei lalu lintas. Berdasarkan hasil analisis lalu lintas harian di ruas jalan Pembangunan didapatkan hasil rata rata sebesar 24.281 kendaraan per hari total 2 arah. Dimana dari total kendaraan selama 14 hari sebesar 339.935 kendaraan. Lintas harian rata-rata awal diperoleh hasil sebesar 85725 kendaraan dengan masa pelaksanaan 2 tahun. Berdasarkan analisa lintas harian rata-rata akhir didapatkan hasil sebesar 96804 kendaraan. Nilai CBR = 2,4 dan nilai daya dukung tanah dasar (DDT) = 3,4. Perhitungan dimensi saluran drainase didapatkan sebesar 0,002052 m3/det > 0,00014 m3/det. Dimana Syarat Q kapasitas Saluran > Q kapasitas Air. Kata Kunci : Jalan; Lapisan Tambahan; Overlay ABSTRACT The road in West Kalimantan Sambas district is the hope of the community, which during the time they were less decent so in need of improvement as where it should be, so that people can do the activity sambas regular work. The purpose of this research is to know the characteristics of the road, to analyze the thickness of the additional layer (overlay), to know the prediction of the traffic volume of 5 years to come, and to analyze the drainage on the road-building of Tarang Pemangkat-Tebas STA 8 + 500-9 + 500 Sambas District. Methods in this study using data collection methods and survey methods. In this data collection method is divided into two namely, primary data and secondary data. Primary data obtained by field observation and side barrier. Secondary data were obtained by literature study and agency survey. While the survey method was obtained by way of traffic surveys and the preparation of traffic surveys. Based on the result of daily traffic analysis on Roads of Construction, the average yield of 24,281 vehicles per day is 2 way total. Where from the total vehicle for 14 days amounted to 339,935 vehicles. The average initial daily cross earned 85725 vehicles with a 2 year implementation period. Based on daily average daily crossover analysis, the result is 96804 vehicles. CBR value = 2.4 and baseline soil bearing capacity (DDT) = 3.4. The calculation of drainage channel dimension was obtained by 0,002052 m³/s > 0.00014 m³/s. Where Q Condition Q Channel capacity> Q Water capacity. Keywords: Road; Additional Layers; Overlay
ANALISA TINGKAT PELAYANAN JALAN PADA RUAS JALAN GAJAYANA KECAMATAN LOWOKWARU KOTA MALANG Imarianto, Georgius; Pandulu, Galih Damar; Arifianto, Andi Kristafi
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 1, No 2 (2017)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Gajayana street, Lowokwaru District, Malang City is a busy road, because along the Gajayana street there are many places of activity centers such as schools, colleges, shopping centers and offices. Therefore, to solve the traffic problems of the street Gajayana to investigate the road capacity and level of service, to predict traffic volume five years in future. In the implementation of data collection on the Gajayana street, with one km road length, the methods used are manual counters methods, the implementation of data collection was conducted over seven days. From the data analysis on the roads Gajayana street can be seen that the capacity of the Gajayana street of 2507.92 pcu/hour, while the volume of traffic on the Gajayana street amounted to 3089.35 pcu/hour. From the comparison between V/C or degree of saturation on the Gajayana street 1.23 and level of service on Gajayana street at the level of road service was at category F or the worst. Keyword : analysis, level of service, gajayana street
OPTIMALISASI KANDUNGAN ASAP CAIR DARI TEMPURUNG KELAPA DAN SABUT KELAPA MELALUI PROSES PIROLISIS Purnawati, Eka; Abrina Anggraini, Sinar Perbawani; Yuniningsih, Susy
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 1, No 2 (2017)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Coconut shell and husk was the waste wich has not been utilize optimally. They have a fairly high content of cellulose. The solution of this problem to become liquid smoke. The aim of this research was to detect the best yield result of liquid smoke that containet phenol and acid. Liquid smoke obtained from the condensation of fumes on pyrolysis of constituents such as cellulose, hemicellulose and lignin. Pyrolysis occurred for 5 hours at temperature of 400 ° C. Two dominant resulting compound is phenol and organic acids which inhibit the growth of bacteria. The best results are found in liquid smoke grade 1 with grade phenol compound at 4.08%, 10.39% acidity and pH value of 1.4. The yield best results from the coconut husk is 32.6%. Key Word : Liquid Smoke, Pyrolysis, Phenol
Pra Rancang Bangun Pabrik Biogas Dari Limbah Padat Pembuatan Tahu Dengan Kapasitas 4.865,664 Liter/Tahun Mira, Mira; Iskandar, Taufik; Anggraini, S.P. Abrina
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 2, No 1 (2018)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAK Metana adalah senyawa hidrokarbon dengan rumus molekul ch4, metana merupakan bahan kimia yang digunakan sebagai biogas dan juga dapat digunakan sebagai bahn bakar listrik, sebagai bahan baku pembuatan gas metana adalah limbah padat pembuatan tahu bahan pembantunya adalah air dan kapur, proses bembuatan biogas merupakan proses fermentasi anaerobic, yaitu proses dekomposisi bahan-bahan organik secara biologis dengan bantuan mikroorganisme yang menghasilkan biogas dan kompos tanpa adanya oksingen, secara umum kandungan karbon dalam limbah padat pembuatan tahu dapat dikonversi menjadi biogas (campuran ch4 dan co2), sedangkan limbah cair dan padatnya dijadikan pupuk cair dan pakan ikan bternak, Proses pembuatan gas methan akan mereaksikan bahan organik dan air dengan konversi 70%, sehingga memperoleh kemurnian 99%. Pra rancang bangun pabrik methana ini diharapkan mampu berproduksi dengan : kapasitas produksi 4.865,664 liter/tahu, waktu operasi 300 hari/tahun, 24 jam/hari, lokasi pabrik akan dibangun didaerah burneh tepatnya dikota bangkalan Madura, Didilihat dari analisa ekonomi terhadap pabrik methane maka diperoleh data sebagai berikut : total capital invesment (tci): rp 22.748.504.777 return of invesment (roibt): 30,12%return of invesment (roiat): 20,9% play out time(pot): 4,25 tahunbreak even point (bep): 38,33% internal rate of return (irr): 14,75%. Maka dapat disimpulkan bahwa pra rencana pabrik pabrik biogas dari limbah padat pembuatan tahu dengan kapasitas 4.865,664 liter/tahun adalah layak didirikan. Kata-kata kunci : Biogas, Metana, Absorber ABSTRACT Methane is a hydrocarbon compound with the molecular formula ch4, methane is a chemical used as biogas and can also be used as an electrical fuel, as a raw material for methane gas production is solid waste making know its auxiliary materials is water and lime, biogas bembuatan process is fermentation process anaerobic, ie the process of decomposition of organic materials biologically with the aid of microorganisms that produce biogas and compost in the absence of oxingen, in general carbon content in solid waste making of tofu can be converted into biogas (mixture of ch4 and co2), whereas liquid waste and solids are made fertilizer liquid and feed the fish bternak, The process of making methane gas will react organic and water with conversion 70%, so get 99% purity. The pre design of the methane plant is expected to be able to produce with: production capacity 4,865,664 liter / know, operating time 300 days / year, 24 hours / day, factory location will be built in burneh precisely in bangkalan city of Madura, seen from economic analysis to methane plant then the data obtained as follows: total capital investment (tci): rp 22.748.504.777return of invesment (roibt): 30.12% return of invesment (roiat): 20.9% play out time (pot): 4.25 tahunbreak even point (bep): 38.33% internal rate of return (irr): 14.75%. So it can be concluded that pre-planned biogas plant factory from solid waste manufacture with a capacity of 4865.664 liters / year is worth establishing. Keywords : Biogas, Methane, Absorber
KAJIAN SISTEM JARINGAN DRAINASE JALAN DESA BOCEK KECAMATAN KARAGPLOSO KABUPATEN MALANG Martins, Eliseu; Suhudi, Suhudi
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 1, No 1 (2017)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kecamatan Karangploso merupakan salah satu kecamatan yang terletak di Kabupaten Malang, letaknya cukup strategis apabila dengan perkembangan dan peningkatan masyarakat di kota tersebut, maka akan bertambah pula sarana dan prasarana yang mendukung, salah satu adalah sistem pembuangan dan penanggulangan drainase.. berdasarkan hasil observasi, dilapangan didapati bahwa sering terjadi genangan dan sedimentasi yang disebabkan kondisi sistem drainase eksisting tidak berfungsi dengan optimal. Setelah dianalisis, disusun rencana sistem jaringan baru yang bertolak dari kondisi eksisting dan permasalahan di lokasi penelitian. Dari fakta diatas dilakukan tinjauan terhadap masalah genangan dan sedimentasi di kawasan tersebut. Metode analisis yang diterapkan pada penulisan ini meliputi analisis hidrologi yang bertujuan menghitung debit rencana dengan menggunakan metode rasional dan analisa hidrolika untuk menghitung kapasitas debit saluran eksisting dan saluran baru. Kedua hasil ini dibandingkan (Qkaps>Qrencana) untuk melihat kemampuan dari setiap saluran. Berdasarkan hasil analisis, dari saluran dan gorong-gorong eksisting, gorong-gorong harus diperbesar dan perlu penambahan saluran dan gorong-gorong baru. Perencanaan sistem jaringan drainase yang baru menunjukan bahwa permasalahan yang terjadi karena adanya sedimentasi dan berkurangnya kapasitas saluran akibat kondisi saluran drainase yang rusak. Perlu dilakukan pemeliharaan saluran berupa normalisasi saluran, pemasangan kisi-kisi penahan sampah, dan pembersihan saluran secara periodik. Kata kunci: Debit Rencana, Drainase Eksisting, Genangan
PERENCANAAN KESTABILAN DINDING PENAHAN STRUKTUR BATU KALI DAN BETON PADA RUAS JALAN MALANG-KEDIRI STA.12.500 KM Soares, Joanico Da Silva; widodo, esti; sulistyani, kiki frida
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 1, No 2 (2017)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRACT To improve the stability of the slope, there are several methods that can be used, one atunya is to use the construction of retaining wall. Retaining wall is a construction which serves to hold lateral soil pressure caused by the soil behind the retaining wall. There are two types of retaining walls are often used in the field, namely the type of gravity and cantilever type. The purpose of this study is to analyze the stability of the landslide in the planning stone retaining walls and concrete structures on poor road - kediri sta.12.500 miles. Type retaining wall planned to use the back side of the retaining wall sloping because this type in accordance with the height of the river. Dimensional stable against the wall : Wallstable against soil bearing style = 288,05 > qa = 31,259 (Safe) stable against shear walls = 1,6 > 1,5 (Safe) Wall stable against rolling style = 2,2 > 1,5 (Safe). Keywords : Slope Stability, Retaining walls, Gravity. ABSTRAK Untuk meningkatkan stabilitas lereng, ada beberapa metode yang bisa digunakan, salah atunya adalah dengan menggunakan konstruksi dinding penahan tanah. Dinding penahan tanah adalah konstruksi yang berfungsi untuk menahan tekanan tanah lateral yang ditimbulkan oleh tanah belakang dinding penahan tanah. Ada dua jenis dinding penahan tanah yang sering digunakan di lapangan, yaitu type gravitasi dan type kantilever. Tujuan dari penelitian ini adalah untuk menganalisa longsoran pada perencanaan kestabilan dinding penahan struktur batu kali dan beton pada ruas jalan malang-kediri sta.12.500 km. Jenis dinding penahan tanah yang direncanakan dengan menggunakan dengan dinding penahan tanah sisi belakang miring karena jenis ini sesuai dengan ketentuan ketinggian sungai. Dimensi dinding stabil terhadap : Dinding stabil terhadap gaya dukung tanah = 288,05 > qa = 31,259 (Aman) Dinding stabil terhadap gaya geser = 1,6 > 1,5 (Aman) Dinding stabil terhadap gaya guling = 2,2 > 1,5 (Aman). Kata kunci : Stabilitas Lereng, Dinding Penahan, Gravitasi.
ANALISIS PENERAPAN MANAJEMEN WAKTU PADA PROYEK BANGUNAN PERKANTORAN REVISTAR 3 LANTAI GRAHA DEWATA MALANG Rhebi, Maria Yoventa; Rasidi, Nawir; Suhudi, Suhudi
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 1, No 2 (2017)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Implementation of time management in building projects Revistar III floor Malang Graha Dewata is suatua time management are included in the processes required to ensure completion time proyek. time management centered on whether or not to walk proyek. planning and scheduling in the planning and has provided guidelines penjadawalan specific to the completion of project activities more quickly and efficiently.Where a case study discusses how the implementation of construction projects on time management PT. Edron Yopie Parlindungan is done with the interview, with the study of literature.In the analysis of this study include the scheduling of the project, identification of activities, the preparation sequence of events, the estimated period of time, scheduling, monitoring, recording the performance, analysis, kemajuaan projects in the field, corrective action, and the update schedule, and consideration of existing projects PT. Edron Yopie Parlindungan.From the analysis concluded that the implementation of management time on building projects revistar third floor of Graha Dewata Malang Overall, it was concluded that PT.Edron Yopie Prlindungan good enough in implementing time management system construction project. Keywords: Time Management, Building Projects , Update Schedule Revistar 3 Floor Graha Dewata Malang.
Pra Rancang Bangun Bioetanol dari Tandan Kosong Kelapa Sawit (TKKS) dengan Kapasitas 2.972 Ton/Tahun Menggunakan Alat Utama Fermentor Seda, Yulius Prianto; Anggraini, S.P. Abrina; Fitri, Ayu Chandra Kartika
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 2, No 2 (2018)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (634.134 KB)

Abstract

ABSTRAK Pengembangan bioenergi sebagai bahan alternatif bahan bakar minyak masih kurang diperhatikan, sementara terbatasnya pasokan bahan bakar minyak di indonesia. Solusi untuk mengurangi ketergantungan pada bahan bakar fosil adalah dengan mengembangkan bioetanol untuk menggantikan bahan bakar fosil dengan. Bahan baku yang digunakan adalah tandan kosong kelapa sawit (EFB). Kapasitas pra-desain bioetanol yang direncanakan 2.972 ton / tahun membutuhkan tandan kosong kelapa sawit (TBS) adalah 31.387.000 kg / tahun. Utilitas yang akan digunakan adalah pasokan air PDAM dan sungai di Sambas, penyediaan listrik dari PLN dan genset, penyediaan bahan bakar dari LNG. Lokasi pabrik direncanakan di desa gamuruh, kecamatan sambas, provinsi kalimantan barat dengan luas total 13.000 m2. Jenis perusahaan adalah perseroan terbatas dengan garis sistem dan membutuhkan karyawan 60 orang. Berdasarkan analisis ekonomi kebutuhan modal Rp.18.969.836.025,59. Total penjualan produk sebesar Rp.24.481.860.000,00 / tahun dengan laba kotor sebesar Rp. 8,343,053,024,56 / tahun, dan laba bersih sebesar Rp. 5,840,137,117.19 / tahun. Hasil dari studi kelayakan dapat diperoleh dari ROI (Return Of Investment) sebesar 51,74% sebelum pajak dan 36,22% setelah pajak. POT (Pot Out Time) selama 2,4 tahun, BEP (Break Even Point) sebanyak 44,45%, IRR (Internal Rate Of Return) sebanyak 12,76%. Berdasarkan analisis ekonomi, dapat disimpulkan bahwa pra-desain bioetanol dari tandan kosong kelapa sawit (TKS) harus ditetapkan. Kata kunci: Pra-desain, Etanol, Tandan Kosong Kelapa Sawit (EFB) ABSTRACT The development of bioenergy as an alternative material of fuel oil is still less be concerned, while limited supply of fuel oil in indonesia. The solutions to reduce dependence on fossil fuels is by developing bioethanol to replace fossil fuels with. The raw material used is oil palm empty fruit bunches (EFB). Pre-design capacity of bioethanol planned 2,972 ton/ year needs oil palm empty fruit bunch (EFB) is 31.387 million kg /year. Utilities will be used are water supply PDAM and river in sambas, the provision of electricity from PLN and generator set, the provision of fuel from LNG. The factory location is planned in gamuruh village, sambas district, west kalimantan province with total area 13000 m2. The type of corporation is a limited liability company with a system line and requires employees 60 people. Based on the economic analysis the need of capital Rp.18.969.836.025,59. Total product sales amounted Rp.24.481.860.000,00 / year with a gross profit of Rp. 8,343,053,024.56 / year, and a net profit of Rp. 5,840,137,117.19 / year. The results of the feasibility study can be obtained from the ROI (Return Of Investment) amounted to 51.74% before tax and of 36.22% after tax. POT (Pot Out Time) during 2.4 years, BEP (Break Even Point) as much as 44.45%, IRR (Internal Rate Of Return) as much as 12.76%. Based on the economic analysis, it can be concluded that the pre-designed of bioethanol from oil palm empty fruit bunches (EFB) should be established. Keywords: Pre-design, Ethanol, Oil Palm Empty Fruit Bunch (EFB)
PERAN MANDOR DALAM MEMPENGARUHI KUALITAS HASIL PELAKSANAAN PROYEK KONSTRUKSI (Studi kasus pada pembangunan gedung kuliah Universitas Islam Malang) BAHRUN, MUHALIM; Rasidi, Nawir; Yurnalisdel, Yurnalisdel
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 1, No 1 (2017)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to determine the ratio between the three roles of iron foremen, supervisors and foremen wood stone in the implementation of construction projects in Malang Unisma building in Jln. MT Haryono No. 139. Implementation research for one month starting from June to July 2012. The results of the data analysis in this study using SPSS method is applied with the help of Windows computers Offic 2007. The results showed that the role of the foreman in affecting the quality of the construction project according to the F test (Simultaneous), note that F value 12.415 count on the quality and results of the F test for the role of earned value 9.399>2.250 F table, so that the quality and influential roles simultaneously the foreman stone, iron and wood foreman. While the test results for quality based on the value of T count foreman stone 6.754 >2.200, T count foreman iron 8.250 >2.200 and 4.223 log T foreman count >2.200, it is known that the role of the foreman greatly affect the quality of the implementation of the construction project, and the results for the role based on the value of T count foreman stone 7.227 >2.200, T count foreman iron 8.828 >2.200 and 4.519 log T foreman count >2.200, so it affects the role. With reference to the above calculation it is seen that there are several levels of the major things that need to get back to the third assessment supervisor in the completion of the construction project. Keywords: Role Foreman, Quality, Project, Construction ABSTRAK Penelitian ini bertujuan untuk mengetahui perbandingan antara ketiga peran mandor besi, mandor kayu dan mandor batu dalam pelaksanaan proyek kontruksi pada pembangunan gedung Unisma Malang di Jln. MT Haryono No 139. Pelaksanaan penelitian selama satu bulan yang di mulai dari bulan Juni sampai bulan Juli 2012. Hasil analisis data pada penelitian ini menggunakan metode SPSS yang diaplikasikan dengan bantuan komputer Windows Offic 2007.Hasil penelitian menunjukan bahwa peran mandor dalam mempengaruhi kualitas hasil proyek konstruksi menurut hasil uji F (Simultan), diketahui bahwa nilai F hitung terhadap kualitas 12,415 dan hasil uji F untuk peran didapatkan nilai 9,399 > F tabel 2,250, sehingga pada kualitas dan peran berpengaruh secara simultan terhadap mandor batu, mandor besi dan kayu. Sedangkan pada hasil uji untuk kualitas berdasarkan nilai T hitung mandor batu 6,754 > 2,200 , T hitung mandor besi 8,250 > 2,200 dan T hitung mandor kayu 4,223 > 2,200, maka diketahui bahwa peran mandor sangat berpengaruh terhadap kualitas pada pelaksanaan proyek kontruksi, dan hasil untuk peran berdasarkan nilai T hitung mandor batu 7,227 > 2,200, T hitung mandor besi 8,828 > 2,200 dan T hitung mandor kayu 4,519 > 2,200, sehingga hal tersebut berpengaruh terhadap peran. Berdasarkan hasil uji pada tabel diketahui bahwa kualitas dan peran nilai T hitung mandor besi nilai paling tinggi. Dengan mengacu pada hasil perhitungan di atas maka terlihat bahwa terdapat beberapa tingkatan tertentu yang menjadi hal yang perlu mendapat pengkajian kembali pada ketiga mandor dalam penyelesaian proyek konstruksi tersebut. Kata kunci : Peran Mandor, Kualitas, Proyek, Konstruksi
PENGARUH WAKTU PADA PROSES FERMENTASI DARI RUMPUT GAJAH. Pobas, Tisyri T. W.; Proborini, Wahyu Diah
eUREKA : Jurnal Penelitian Mahasiswa Teknik Sipil dan Teknik Kimia Vol 1, No 1 (2017)
Publisher : Universitas Tribhuwana Tunggadewi Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Study research produce bio-etanol from bulrush to look for bio-etanol alternative raw material and study sour hidrolisis process and ferment. Bulrush availibility can be obtained by continue and abundance, representing one of the less exploited crop. Bulrush only used as by livestock food, sometimes bulrush is also consideret to be intruder crop. But bulrush have cellulose rate able to be used as one of the ethanol producer materials. Till now consume world ethanol about 63% for the fuel. In this research to process hydrolysis at condition remain to temperature 30C, HCl condensation volume 700ml, hydrolysis time 1 hour, HCl kondensation 4 and bulrush weigt 35 gram. Is later then continued by ferment process (at) condition remain to : temperature 30C, pH 4,5, starter 10% ; ferment volume 500 ml and condition change : ferment time 2,3,4,5,6 (day). To obtain get purer ethanol product to distilation process, from research wich have to be obtained after distillation yield ethanol equal 7.48%. From result of which is obtained, bulrush can be used as alternative raw material make bioethanol. Keyword :bio-ethanol, ferment, hydrolysis, bulrush ABSTRAK Penelitian pengaruh waktu pada proses pembuatan bioetanol dari rumput gajah bertujuan untuk mencari bahan baku alternatif bioetanol dengan proses hidrolisis asam dan fermentasi. Ketersediaan rumput gajah dapat diperoleh secara berkesinambungan dan melimpah, merupakan salah satu tanaman yang kurang dimanfaatkan. Rumput gajah hanya digunakan sebagai makanan ternak, terkadang rumput gajah juga dianggap sebagai tanaman pengganggu. Rumput gajah mempunyai kadar selulosa yang dapat digunakan sebagai salah satu bahan penghasil etanol. Sampai saat ini konsumsi etanol dunia sekitar 63% untuk bahan bakar. Variabel tetap untuk proses hidrolisis adalah suhu 30C, volume larutan HCl 700ml, waktu hidrolisis 1 jam, berat rumput gajah 35 gram dan pH larutan HCl 4. Varibel tetap untuk proses fermentasi adalah suhu 30C pH 4,5 starter 10%, volume fermentasi 500ml dan kondisi berubah 2,3,4,5,6 (hari). Etanol murni dapat diperoleh dengan melakukan proses destilasi. Hasil terbaik setelah destilasi adalah pada waktu fermentasi 72jam hasil penelitian diperoleh kadar etanol sebesar 7,48%. Berdasarkan hasil tersebut rumput gajah dapat digunakan sebagai bahan baku alternatif pembuatan bioetanol. Kata kunci : bioetanol, fermentasi, hidrolisis, rumput gajah.

Page 10 of 16 | Total Record : 160