cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surakarta,
Jawa tengah
INDONESIA
Jurnal Ilmiah Teknik Industri
ISSN : 14126869     EISSN : 24604038     DOI : -
Core Subject : Engineering,
Jurnal Ilmiah Teknik Industri is a scientific journal that aims to participate in developing the scientific field of Industrial Engineering, contains the results of research and theoretical study from lecturers, researchers and industry practitioners. Jurnal Ilmiah Teknik Industri is administered by the Department of Industrial Engineering, Faculty of Engineering, Universitas Muhammadiyah Surakarta and published by the Muhammadiyah University Press (MUP).
Arjuna Subject : -
Articles 766 Documents
MODIFIED IPA - II SEBAGAI UPAYA IDENTIFIKASI POTENSI PERBAIKAN DI INSTITUSI PENDIDIKAN TINGGI Setiawan, Eko
Jurnal Ilmiah Teknik Industri Vol. 5, No. 3, April 2007
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Persaingan yang semakin ketat mengharuskan institusi pendidikan tinggi untuk selalu meningkatkan kualitas pelayanannya, sehingga pelanggan akan terpuaskan. Hal tersebut mensyaratkan identifikasi dan pengukuran kebutuhan pelanggan, sehingga diketahui kebutuhan pelanggan yang masih memerlukan peningkatan pelayanan serta kebutuhan pelanggan yang telah sesuai dengan harapan pelanggan. Mengingat institusi apa pun tidak terlepas dari suasana persaingan, maka identifikasi serta pengukuran kebutuhan pelanggan tersebut harus menyertakan para pesaing. Makalah ini membahas salah satu usulan metode yang dapat digunakan untuk keperluan tersebut, yaitu metode modified IPA - II. Dengan metode yang diusulkan ini, dapat diketahui pada kebutuhan pelanggan yang mana saja suatu institusi pendidikan tinggi masih rendah kinerjanya relatif terhadap kinerja para pesaing, sedangkan kebutuhan tersebut menempati tingkat kepentingan yang tinggi di mata pelanggan. Dengan mengetahui peta kebutuhan pelanggan sedemikian rupa, maka agenda peningkatan kualitas pelayanan akan dapat dijalankan secara lebih terarah dan efisien.
SIMULTANEOUS PRICING AND LOT SIZING FOR A DETERIORATING PROCESS Prasetyo, Hari; Fauza, Gusti
Jurnal Ilmiah Teknik Industri Vol. 5, No. 1, Agustus 2006
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Identifikasi Waste Pada Proses Produksi Key Set Clarinet Dengan Pendekatan Lean Manufacturing Utama, Dana Marsetiya; Dewi, Shanty Kusuma; Mawarti, Veronika Indah
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study discusses lean manufacturing concept to identify waste in Key Set Clarinet production process at Yamaha Musical Products Indonesia, Ltd. The lean manufacturing concept is done intially by big picture mapping, waste assessment model (WAM), value stream mapping (VSM) and cause and effect diagram respectively. The results show that the dominant waste is defect (26.04%), motion (19.34%), inventory (19.22%), and waiting (13.91%).
ANALISIS KEPUASAN PELANGGAN DENGAN PENDEKATAN FUZZY SERVICE QUALITY DALAM UPAYA PENINGKATAN KUALITAS PELAYANAN Djunaidi, Much.; Setiawan, Eko; Hariyanto, Tri
Jurnal Ilmiah Teknik Industri Vol. 4, No. 3, April 2006
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Semakin ketatnya persaingan serta pelanggan yang semakin selektif dan berpengetahuan mengharuskan Puskesmas Kerjo Karanganyar untuk selalu meningkatkan kualitas pelayanannya. Hal tersebut mensyaratkan adanya pengetahuan tentang kondisi pelayanan selama ini, yaitu telah sesuai dengan harapan pelanggan atau belum. Penelitian dilakukan dengan menyebarkan kuesioner persepsi dan harapan pelanggan terhadap pelayanan yang saat ini diberikan oleh pihak Puskesmas Kerjo. Dari hasil penelitian yang telah dilakukan, didapatkan nilai gap antara persepsi dan harapan yang cukup signifikan. Dari hasil perhitungan didapatkan nilai gap kriteria pelayanan tertinggi adalah pelayanan pemeriksaan, pengobatan, dan perawatan yang tepat sebesar -3,2. Nilai gap dimensi kualitas jasa pelayanan tertinggi adalah dimensi reliability sebesar -3,1. Sedangkan nilai gap antara persepsi dan harapan pelanggan sebagai indeks pelanggan adalah sebesar -3,361. Hal ini menunjukkan bahwa kepuasan pengguna jasa pelayanan di Puskesmas Kerjo terhadap pelayanan yang saat ini diberikan masih belum tercapai.
PENINGKATAN KUALITAS PRODUK KERAMIK DENGAN PENDEKATAN SIX SIGMA PADA INDUSTRI KERAMIK DINOYO – MALANG Garside, Annisa Kesy
Jurnal Ilmiah Teknik Industri Vol. 6, No. 1, Agustus 2007
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini bertujuan menerapkan konsep Six Sigma untuk mengurangi terjadinya cacat dan menekan adanya variabilitas yang terjadi pada proses pembuatan keramik. Proses perbaikan dilakukan secara sistematis dan kontinyu dengan menggunakan siklus DMAIC (Define, Measure, Analyze, Improve and Control). Dengan menggunakan diagram Pareto diperoleh dua jenis cacat kritis yang menjadi permasalahan utama yaitu retak dan bintik melepuh. Selanjutnya alternatif-alternatif perbaikan pada proses diperoleh dengan FMEA. Berdasarkan nilai Risk Priority Number (RPN) yang tertinggi diambil 3 alternatif perbaikan dan selanjutnya dipilih satu alternatif terbaik dengan menggunakan metode AHP. Implementasi perbaikan dilakukan dengan menggunakan timer dan menugaskan operator khusus pada saat pembakaran untuk mengurangi cacat retak dan membersihkan kotoran bodi dengan menggunakan kompresor untuk mengurangi bintik melepuh. Setelah dilakukan evaluasi hasil implementasi alternatif perbaikan pada proses pembuatan keramik diperoleh kenaikan level sigma dari 2,8 menjadi 3 yang diikuti penurunan DPMO dari 104.167 menjadi 65.625. Sedangkan prosentase biaya akibat kualitas keramik yang jelek (COPQ) terhadap total penjualan mengalami penurunan dari 16,48% menjadi 9,93%.
PENENTUAN WAKTU PERAWATAN UNTUK PENCEGAHANPADA KOMPONEN KRITIS CYCLONE FEED PUMP BERDASARKAN KRITERIA MINIMASI DOWN TIME Nandiroh, Siti; Pratiwi, Indah; Widodo, Hesthi
Jurnal Ilmiah Teknik Industri Vol. 5, No. 1, Agustus 2006
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sistem perawatan mesin yang dilakukan di PT. Newmont Nusa Tenggara, selama ini masih bersifat korektif yaitu perawatan setelah terjadi kerusakan. Kerusakan komponen ini biasanya akan ditandai dengan ditemukannya produk yang dihasilkan tidak sedikit mengalami kecacatan. Peranan perawatan terhadap komponen-komponen Cyclone Feed Pump pada Process Departement - PT.Newmont Nusa Tenggara sangat penting artinya untuk mencegah terjadinya kecacatan produk masal dan mencegah terjadinya down time produksi. Dan perawatan yang paling baik digunakan adalah perawatan pencegahan sebelum terjadinya kerusakan (preventive maintenance). Mesin kritis adalah mesin yang mengalami frekwensi kerusakan terbesar dengan total downtime terbesar. Untuk penentuan mesin kritis ini, langkah pertama yang dilakukan adalah dengan mengukur lamanya waktu downtime produksi dari tiap-tiap mesin yang ada. Perhitungan MTTR berdasarkan data downtime, yang sebelumnya juga dilakukan uji kecocokan distribusi dan hasilnya sesuai, Dengan melakukan perhitungan Mean Time To Repair dan Mean Time To Failure dapat diketahui rata-rata waktu berapa lama pompa beroperasi dan berapa lama pompa tersebut dapat dilakukan perbaikan serta dapat diketahui Reliability pada Cyclone Feed Pump 2.0.1. Setelah dilakukkan perhitungan, komponen kritis Discharge Pipe pada Cyclone Feed Pump 2.0.1 harus sudah dilakukan inspeksi preventif, karena telah beroperasi 664.8 jam, dan perbaikan yang harus lakukan maksimal 3.4997 jam setiap kali dilakukan shutdown.
Kriteria Yang Berpengaruh Dalam Penilaian Kinerja Karyawan Menggunakan Anaytical Hierarchy Process Hariyanto, Krisnadhi; Satoto, Eko Budi
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v15i1.1148

Abstract

Employee performance is the result of work that is achieved or the results that have been done or worked by an employee within the chores that are charged to the employee. The problem is a priority weighting of the factors and sub factors to get the solution in advance in accordance with the order of priority. In this study the data collected is done by direct observation, interviews, questionnaires and literature. The data are processed to determine the priority weight of the components that affect employee performance. From the calculation by AHP method can be obtained by order of priority as follows: The first is the human resources with priority weight 0.558. The second is working environmental conditions with priority weight 0.312. Last is managerial with priority weight 0.131. Thus the factors that require attention and consideration of the company to increase work performance is a factor of human resource with the greatest priority weight.
Penilaian Implementasi Green Supply Chain Management di UKM Batik Pekalongan dengan Pendekatan GreenSCOR Susanty, Aries; Santosa, Haryo; Tania, Fani
Jurnal Ilmiah Teknik Industri Vol. 16, No. 1, Juni 2017
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v16i1.3862

Abstract

This article assesses the implementation level of Green Supply Chain Management (GSCM) practices in SMEs Pekalongan batik business with GreenSCOR approach and mapped out the results with an approach of importance peformance analysis (IPA). The article also devised a strategy to improve the implementation of GSCM practices. Data collection was done by distributing questionnaires and interviews. This article shows that the level of GSCM implementation in small-scale batik SMEs is in the poor category; Whereas, the level of GSCM implementation in medium-scale batik SMEs is in the average category. The results of the mapping show that, for batik SMEs there are indicators that are in quadrant A. Preparation of strategies to improve GSCM practices in batik SME Pekalongan more focused on improving the performance of indicators of use of environmentally friendly raw materials.
PERANCANGAN ULANG TATA LETAK FASILITAS DENGAN PENDEKATAN LEAN MANUFACTURING Prasetya, Alexander; Noya, Sunday Alexander Theophilus
Jurnal Ilmiah Teknik Industri Vol. 14, No. 2, Desember 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v14i2.1112

Abstract

One of the big investment in a business is facility design. It is a long-term investment due to great value. In its development, PT. Dwi Putra Sakti faced some problems related to facility layout. Problems that can be identified, such as work in process that has accumulated on the production floor, as well as the anorganizad facility layout. Therefore, it is necessary to redesign the layout for the production process more effective and efficient. This study uses a lean manufacturing approach to redesign facility layout. It used value stream mapping, seven waste, cellular manufacturing and 5S principle. Analysis of the implementation result is used to design the layout of the new facility. Level layout that will be examined are the macro-and micro-layout layout. Results of macro-layout design is decreasing production cycle time of trousers. While the micro-layout design is decreasing in material handling displacement.
Evaluasi Mutu Pelayanan Kinerja Perguruan Tinggi dengan Focused Quality (Kasus di Perguruan Tinggi "X" Surakarta) Suranto, Suranto
Jurnal Ilmiah Teknik Industri Vol. 3, No. 1, Agustus 2004
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v3i1.3364

Abstract

Tujuan penelitian ini untuk mengetahui kinerja perguruan tinggi dalam memenuhi kebutuhan konsumen dalam hal kualitas pelayanan. Metode yang  digunakan dalam penelitian ini adalah Fosuced Quality, yaitu metode untuk  mencari pengembangan kualitas mengacu pada proses kunci dan Critical Success  Faktor (CSF) pada Perguruan Tinggi "X" Surakarta. Dari penelitian yang   dilakukan, kinerja proses kunci pada prioritas utama adalah proses pendidikan     (5,6) dan prioritas terendah adalah kenyamanan ruang kuliah (2,62). Dampak    tertinggi adalah pengembangan fasilitas penunjang akademik (14,3) dan terendah   adalah kenyamanan ruang kuliah (11,1). Proses kunci yang mendapat prioritas   untuk diperbaiki berdasarkan nilai kesenjangan terbobot adalah  sistem  pendidikan   dengan skor 77,6 dan pengembangan sumber daya manusia dengan skor 55,4   sedangkan kenyamanan ruang kuliah (29). Berdasarkan matrik prioritasi proses    dapat diketahui bahwa kinerja di Perguruan Tinggi "X" Surakarta belum  sesuai  keinginan konsumen. Hal ini dapat  diketahui dari nilai kinerja proses yang bobot  nilai berkisar antara 2,62 sampai 5,6 yang berarti masuk kategori penelitian   cukup. Proses perbaikan yang menjadi prioritas utama di Perguruan Tinggi "X"  Surakarta adalah prioritas 1sistem pendidikan, prioritas 2 pengembangan    sumber daya manusia,  dan prioritas  3 sistem penilaian   dosen.

Filter by Year

2003 2023


Filter By Issues
All Issue Vol. 22, No. 2, December 2023 Vol. 22, No. 1, June 2023 Vol. 21, No. 2, December 2022 Vol. 21, No. 1, June 2022 Vol. 20, No. 2, December 2021 Vol. 20, No. 1, June 2021 Vol. 19, No. 02, December 2020 Vol. 19, No. 1, June 2020 Vol. 18, No. 2, Desember 2019 Vol. 18, No. 1, Juni 2019 Vol. 18, No. 1, Juni 2019 Vol. 17, No. 2, Desember 2018 Vol. 17, No. 2, Desember 2018 Vol. 17, No. 1, Juni 2018 Vol. 17, No. 1, Juni 2018 Vol. 16, No. 2, Desember 2017 Vol. 16, No. 2, Desember 2017 Vol. 16, No. 1, Juni 2017 Vol. 16, No. 1, Juni 2017 Vol. 15, No. 2, Desember 2016 Vol. 15, No. 2, Desember 2016 Vol. 15, No. 1, Juni 2016 Vol. 15, No. 1, Juni 2016 Vol. 14, No. 2, Desember 2015 Vol. 14, No. 2, Desember 2015 Vol. 14, No. 1, Juni 2015 Vol. 14, No. 1, Juni 2015 Vol. 13, No.2, Desember 2014 Vol. 13, No.2, Desember 2014 Vol. 13, No. 1, Juni 2014 Vol. 13, No. 1, Juni 2014 Vol. 12, No. 2, Desember 2013 Vol. 12, No. 2, Desember 2013 Vol. 12, No. 1, Juni 2013 Vol. 12, No. 1, Juni 2013 Vol. 11, No. 2, Desember 2012 Vol. 11, No. 2, Desember 2012 Vol. 11, No. 1, Juni 2012 Vol. 11, No. 1, Juni 2012 Vol. 10, No. 2, Desember 2011 Vol. 10, No. 2, Desember 2011 Vol. 10, No. 1, Juni 2011 Vol. 10, No. 1, Juni 2011 Vol. 6, No. 2, Desember 2007 Vol. 6, No. 2, Desember 2007 Vol. 6, No. 1, Agustus 2007 Vol. 6, No. 1, Agustus 2007 Vol. 5, No. 3, April 2007 Vol. 5, No. 3, April 2007 Vol. 5, No. 2, Desember 2006 Vol. 5, No. 2, Desember 2006 Vol. 5, No. 1, Agustus 2006 Vol. 5, No. 1, Agustus 2006 Vol. 4, No. 3, April 2006 Vol. 4, No. 3, April 2006 Vol. 4, No. 2, Desember 2005 Vol. 4, No. 2, Desember 2005 Vol. 4, No.1, Agustus 2005 Vol. 4, No.1, Agustus 2005 Vol. 3, No. 2, Desember 2004 Vol. 3, No. 2, Desember 2004 Vol. 3, No. 1, Agustus 2004 Vol. 3, No. 1, Agustus 2004 Vol. 2, No. 3, April 2004 Vol. 2, No. 3, April 2004 Vol. 2, No. 2, Desember 2003 Vol. 2, No. 2, Desember 2003 Vol. 1, No. 3, April 2003 Vol. 1, No. 3, April 2003 More Issue