Claim Missing Document
Check
Articles

Found 32 Documents
Search

Analisis Laju Sedimen Berdasarkan Data Unsteady Flow Real Time Dengan HEC-RAS di DAS Bomo Banyuwangi Syafaat, Habib Marjun; Prasetyo, Yohanes Pracoyo Widi; Sujatmiko, Heri; Purnomo, Dimas Aji; Erwanto, Zulis
Journal of Applied Civil Engineering and Infrastructure Technology Vol 6 No 1 (2025): Agustus 2025
Publisher : Indonesian Society of Applied Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/jaceit.v6i1.1114

Abstract

The 2018 flash flood in Banyuwangi Regency highlighted the role of sedimentation in increasing disaster risks. This study aims to analyze sedimentation rates based on real-time unsteady flow data during the rainy and dry seasons, understand the relationship between unsteady flow and sedimentation, and evaluate the role of HEC-RAS in mitigating sedimentation-related risks. Hydrometric measurements were conducted in real-time over seven days in both seasons. Data were analyzed using HEC-RAS and validated using the Mean Absolute Error (MAE) method of bathymetric measurements. The results show that sedimentation rates were higher during the rainy season (2.77 m³/day) compared to the dry season (1.33 m³/day) due to increased discharge and flow velocity. Flow velocity correlates more strongly with sedimentation than discharge, with regression values of 0.8257 in the dry season and 0.4072 in the rainy season. Flood modeling with HEC-RAS indicates that sedimentation increases flood risks, particularly in downstream areas. Therefore, mitigation measures such as river normalization, embankment construction, drainage optimization, and upstream soil conservation are necessary. These findings also support early warning systems to enhance community preparedness for sedimentation-induced floods.
Lean Construction Approach to Material Waste in the Construction Project of Elementary School Building 6 Kajarharjo Banyuwangi Prisilia, Harliwanti; Purnomo, Dimas Aji
G-Tech: Jurnal Teknologi Terapan Vol 9 No 2 (2025): G-Tech, Vol. 9 No. 2 April 2025
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70609/gtech.v9i2.6823

Abstract

Lean Construction is a method that focuses on minimizing waste and increasing added value in the construction process. This research aims to identify and analyze material waste that occurs in the SDN 6 Kajarharjo building construction project, Banyuwangi, by applying the Lean Construction approach. Material waste is one of the significant factors in reducing efficiency and increasing project costs. The research method used is field observation, interviews with related parties, and data analysis based on the principles of Lean Construction, especially in identifying material waste based on the main work done in the building construction project. The results showed that the waste materials that occurred in this project were 19.44 m2 of red brick material, 0.34 kg of plain iron 8, 74 kg of plain iron 10, 14 kg of plain iron 12, 79.60 kg of screw iron 13, 34.90 kg of formwork, 6 m3 of split stone and 3 m3 of ready mix concrete. With the implementation of the Lean Construction approach, it is expected that the SDN 6 Kajarharjo building project can achieve better material efficiency, reduce costs, and improve overall construction quality.
Structural Strength Evaluation of Building Superstructure Using Response Spectrum and Time History Analysis Aditiya, Dio; Purnomo, Dimas Aji; Sujatmiko, Heri
Jurnal Teknik Sipil Vol 25, No 3 (2025): Vol 25, No 3 (2025): JURNAL TEKNIK SIPIL EDISI AGUSTUS 2025
Publisher : Fakultas Teknik Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/jts.v25i3.95742

Abstract

Building A of the State University Hospital (RSPTN) of Jember University, with a structural height of 22 meters, consisting of 4 floors and one roof, requires a comprehensive evaluation of seismic performance by SNI 1726:2019 and SNI 2847:2019. This study aims to assess the structural strength and seismic performance of the upper structure using Response Spectrum Analysis and Time History Analysis methods. The analysis was conducted using ETABS v22 software, with input data including architectural and structural drawings, material properties, and loading conditions. Gravity loads (dead, additional dead, and live loads) and seismic loads were applied, with dynamic analysis performed through two approaches: response spectrum analysis using site-specific parameters (SS = 0,8680, S1 = 0,3884, soil type SD), and time history analysis using spectrally matched records from the Tohoku (1999), Iwanuma (2005), and Vina Del Mar Centro (2010) earthquakes. The analysis results show that the structure"™s fundamental period is 0,7372 seconds, and base shear values meet design expectations. Inter-story drifts under the response spectrum remain within permissible limits; however, drifts under the time history exceed the threshold, particularly under inelastic conditions. Despite this, structural components, such as beams, slabs, and columns, fulfill the requirements for flexural, shear, and torsional strength.
Optimization Study of Water Allocation in Turus Irrigation Area Using Dynamic Programming Approach Susanto, Rizki Heru; Purnomo, Dimas Aji; Sujatmiko, Heri
Jurnal Teknik Sipil Vol 25, No 3 (2025): Vol 25, No 3 (2025): JURNAL TEKNIK SIPIL EDISI AGUSTUS 2025
Publisher : Fakultas Teknik Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/jts.v25i3.95760

Abstract

The irrigation system is one of the key factors influencing agricultural land productivity, particularly in rice fields. Proper and efficient water resource management is a crucial strategy to enhance agricultural production efficiency. The Turus irrigation area, covering 424 hectares, frequently faces challenges in water distribution due to both oversupply and inaccuracies in determining cropping patterns. This study aims to optimize irrigation water allocation in the area to achieve maximum agricultural output. The optimization process involves comparing the water requirements for specific crops with the available water supply to determine the most beneficial allocation. The results show that the water requirement during the second dry season planting period (MK II), from July to October, reaches 5.405,59 m ³/ha. Based on the water balance analysis and limited water availability, the optimization is focused on rice and secondary crops during the MK II season. Through a dynamic programming approach, an optimal water allocation was achieved, successfully irrigating the entire 424-hectare area and yielding a maximum profit of IDR 6.538.080.000,00. These findings demonstrate that optimizing water allocation using the dynamic programming method is a strategic approach to improving the efficiency and productivity of the irrigation system.
ANALYSIS OF COMPLIANCE LEVEL TOWARDS SMK3 AMONG CONSTRUCTION PROJECT WORKERS Ratna Sopiyatul Imamah; Dimas Aji Purnomo; Sunarko
International Journal of Social Science, Educational, Economics, Agriculture Research and Technology (IJSET) Vol. 4 No. 6 (2025): MAY
Publisher : RADJA PUBLIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54443/ijset.v4i6.808

Abstract

The construction industry is experiencing increasing complexity that has an impact on occupational safety risks. Dynamic work environments trigger workers' non-compliance with established safety procedures. Many construction projects experience work accidents due to weak SMK3 implementation systems in the field. Workers often ignore safety instructions due to lack of motivation, weak organizational culture, and low risk understanding. This study aims to analyze the factors that influence compliance with SMK3 among construction project workers. This study uses a qualitative approach based on literature review through a systematic analysis of academic sources published in 2023–2025. This study reveals that organizational culture, intrinsic motivation, risk understanding, and technology utilization have a major contribution to worker compliance. Systems that involve workers in formulating safety policies show higher levels of compliance. Application-based surveillance technology helps improve worker reporting and awareness in the field. Risk-based training that is developed in an applicative manner has proven to be more effective than formal training. This study concludes that compliance with SMK3 is formed through synergy between managerial systems and individual behavior. Companies need to build a safety culture that is applied consistently across all project lines. Project management needs to provide simulation-based training and real-time reporting systems to increase risk awareness. Researchers recommend an integrative strategy involving two-way communication, safety incentives, and the use of adaptive technology to establish sustainable compliance. A safety system that is adapted to field realities will increase the effectiveness of SMK3 implementation in the construction sector.
IMPLEMENTATION OF SMK 3 IN IMPROVING WORK SAFETY ON ROAD INFRASTRUCTURE PROJECTS Mohamad Machfudin Amirulloh; Sunarko; Dimas Aji Purnomo
International Journal of Social Science, Educational, Economics, Agriculture Research and Technology (IJSET) Vol. 4 No. 8 (2025): JULY
Publisher : RADJA PUBLIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54443/ijset.v4i8.810

Abstract

The construction industry experiences high levels of work accidents in road infrastructure projects. Work accidents have a negative impact on worker safety and project productivity. An Occupational Safety and Health Management System (SMK3) is needed to create a safe and healthy work environment. This study aims to analyze the implementation of SMK3 in improving work safety in road projects. This study uses a qualitative approach based on a literature review of academic sources published between 2023 and 2025. This study identifies five important elements in SMK3, namely safety training, procedural compliance, management support, safety culture, and system evaluation. This study found that safety training increases risk awareness and compliance with work procedures. A consistent evaluation system strengthens the system's adaptation to changing project conditions. This study also shows that project management plays an important role in creating a conducive work climate. Two-way communication between workers and management improves understanding of risks in the field. Safety technology has been shown to support real-time hazard detection and accelerate preventive actions. Worker participation in the preparation of safety policies encourages a sense of ownership of a safe work system. This study concludes that a holistic approach strengthens the success of SMK3 implementation in road projects. This study recommends the integration of SMK3 from the planning stage to project implementation. Companies must build an adaptive, collaborative, and risk-based safety management system. The government needs to strengthen safety regulations and improve supervision in the field systematically.
THE ROLE OF PROJECT MANAGERS IN IMPROVING CONSTRUCTION PROJECT EFFICIENCY Frendy Laurenza; Heri Sujatmiko; Dimas Aji Purnomo
International Journal of Social Science, Educational, Economics, Agriculture Research and Technology (IJSET) Vol. 4 No. 8 (2025): JULY
Publisher : RADJA PUBLIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54443/ijset.v4i8.812

Abstract

The construction industry faces various efficiency issues in project implementation. Construction projects often experience delays, cost overruns, and sub-optimal quality. Researchers observed that the role of project managers is crucial in creating work efficiency. Project managers are responsible for coordination, communication, decision-making, and risk management during the construction process. This study aims to analyze the contribution of project managers' roles to increasing construction project efficiency. This study uses a deductive qualitative approach that relies on literature reviews and thematic analysis from various academic sources. Researchers found that high managerial skills affect the effectiveness of resource allocation and project time. Researchers also found that open communication encourages harmonious and productive teamwork. Researchers noted that data-based decisions accelerate the problem-solving process and prevent project delays. Researchers saw that systematic risk management can reduce the impact of uncertainty and increase project stability. Researchers observed that organizational support strengthens the position of project managers in strategic decision-making. Researchers concluded that the role of project managers significantly affects all dimensions of construction project efficiency. Researchers suggest that construction companies improve project manager competencies through integrated training and supporting information systems. Researchers hope that the results of this study will contribute to efficient and sustainable project management practices. Researchers recommend a holistic approach in developing project management in the construction sector.
PENDAMPINGAN KEGIATAN PEGAWASAN DAN PEMBUATAN RAB PEKERJAAN KONSTRUKSI RIGID PAVEMENT DI DESA KESILIR AJI PURNOMO, DIMAS; harliwanti prisilia
BEGAWE: Jurnal Pengabdian Masyarakat Vol. 1 No. 2 (2023): BEGAWE: Jurnal Pengabdian Masyarakat, Desember 2023
Publisher : Lembaga Berugak Baca

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62667/begawe.v1i2.30

Abstract

PKM ini diharapkan dapat memahami cara membuat rencana anggaran biaya. Peserta dalam pendampingan pembuatan rencana biaya sebanyak 15 orang yang berlokasi di desa kesilir kecamatan Silir Agung Kabupaten Banyuwangi. Pendampingan ini mengajarkan kepada peserta bagaimana membuat rencana anggaran biaya sebuah proyek konstruksi dan data-data yang dibutuhkan apa saja. Kemudian dijelaskan juga bagaimana cara melakukan pengawasan terhadap pekerjaan konstruksi yang dimulai dari pemeriksaan bahan material, proses pencampuran bahan sampai pelaksanaan dilapangan. Metode yang digunakan dalam pengabdian ini dengan memberikan edukasi dan pelatihan kepada peserta dengan menggunakan perangkat seperti laptop, viewer, papan layar. Sebelum dilaksanakan pengabdian peserta masih awam tentang cara membuat rencana anggaran biaya namun setelah dilakukan pelatihan peserta dengan mudah menyusun rencana anggaran biaya dan juga memahami serta mengerti bagaimana cara melakukan pengawasan pada pekerjaan konstruksi. Dengan adanya kegiatan PKM ini diharapkan masyarakat lebih memahami dan menguasai dalam pembuatan rencana anggaran biaya sampai pelaksanaan dilapangan.
Analisis Kinerja Seismik dan Modifikasi Struktur Baja di Wilayah Kds Tinggi (Studi Kasus: PT. Warisan Eurindo, Banyuwangi) Firdaus, Zulfan; Prasetyo, Yohanes Pracoyo Widi; Purnomo, Dimas Aji
Innovative: Journal Of Social Science Research Vol. 5 No. 3 (2025): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/innovative.v5i3.19785

Abstract

Kabupaten Banyuwangi merupakan wilayah dengan aktivitas seismik tinggi yang menuntut penerapan desain struktur tahan gempa. Penelitian ini mengevaluasi kinerja seismik struktur gudang baja eksisting dengan sistem Ordinary Moment Frame (OMF) dan membandingkannya setelah dimodifikasi menjadi sistem Ordinary Concentrically Braced Frame (OCBF). Analisis dilakukan menggunakan metode Linear Time History Analysis (LTHA) pada ETABS v22, dengan input tiga data gempa historis (Chi-Chi, Miyagi, Tokachi). Hasil menunjukkan bahwa struktur OMF mengalami overstress pada elemen kolom (rasio tegangan D/C sebesar 0,951), rasio kelangsingan KL/r mencapai 205,49 (melebihi batas 200), serta simpangan antar tingkat sebesar 249,22 mm (2,6%), melampaui batas izin 143,077 mm. Setelah modifikasi ke sistem OCBF, nilai D/C turun menjadi 0,785, rasio KL/r menjadi 141,84, dan simpangan antar tingkat berkurang drastis menjadi 70,09 mm (0,7%). Dengan demikian, penambahan bracing terbukti efektif meningkatkan performa seismik struktur baja pada kawasan rawan gempa.
Evaluasi Efektifitas Infrastruktur Pembasahan Gambut (IPG) Berupa Sekat Kanal untuk Optimalisasi Pembasahan Pada Lahan Gambut (Studi Kasus: Kelurahan Teluk Makmur, Kota Dumai) Utami, Fina Dyah; Purnomo, Dimas Aji; Sujatmiko, Heri
Innovative: Journal Of Social Science Research Vol. 5 No. 3 (2025): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/innovative.v5i3.19928

Abstract

Penelitian ini mengevaluasi efektivitas infrastruktur pembasahan gambut (IPG) berupa sekat kanal sebagai strategi rewetting pada lahan gambut di Kelurahan Teluk Makmur, Kota Dumai, Provinsi Riau. Penelitian ini menggunakan data primer dari observasi lapangan yang dilaksanakan pada tanggal 08 Oktober 2024 s/d 13 Oktober 2024 dan data sekunder dari institusi terkait. Hasil survei menunjukkan bahwa kondisi fisik sekat kanal mengalami kerusakan berat, termasuk komponen utama seperti pelimpas dan cerucuk penahan. Selain itu, hasil pengukuran tinggi muka air tanah (TMAT) memperlihatkan tidak adanya perbedaan signifikan antara sisi hulu dan hilir, menandakan kegagalan fungsi sekat kanal dalam menaikkan muka air tanah. Dengan demikian, sekat kanal yang ada tidak lagi efektif dalam mendukung pembasahan lahan gambut secara optimal.