Claim Missing Document
Check
Articles

Found 6 Documents
Search
Journal : Proceeding Maritime Business Management Conference

PENERAPAN LOGIKA FUZZY TSUKAMOTO DALAM OPTIMALISASI PERSEDIAAN MINYAK PELUMAS KAPAL KARGO CURAH Melania Fitri Ariyanti; Aditya Maharani; Devina Puspita Sari
Proceeding Maritime Business Management Conference MBMC: Proceeding Maritime Business Management Conference 2022
Publisher : Program Studi D4-Manajemen Bisnis, Jurusan Teknik Bangunan Kapal, Politeknik Perkapalan Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Lubricating oil vessel is a component that is essential for the smooth and operational cruise ships in the machine maintenance .The shipping companies that still do a rough guess to supply demand lubricating oil must have ripe for calculation based on a voyage made in supply , and from year to year lubricating oilprice increases , who is influential on the operational expenses costs .This research aims to obtain the lubricating oil the optimum route a to b in one trip and knows how the cost savings of the lubricating oil. Methods used in this research is fuzzy tsukamoto .The result showed 2054 liters per trip on ME and 1284 liters on AE engine the forecasting mape 7,3 %and 9,5 % .The cost of purchases demand lubricating oil on a ME engine save Rp .80.837.330 and machinery ae Rp. 53,065,812.95This research contributed to optimal lubricating oil demand in shipping per trip.
SWOT ANALISIS FAKTOR DOMINAN KINERJA PROSES DWELLING TIME TERMINAL PETIKEMAS Yesica Dwi Andika Putri; Yesica Novrita Devi; Devina Puspita Sari
Proceeding Maritime Business Management Conference MBMC: Proceeding Maritime Business Management Conference 2022
Publisher : Program Studi D4-Manajemen Bisnis, Jurusan Teknik Bangunan Kapal, Politeknik Perkapalan Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini menggunakan analisis SWOT yang digunakan untuk meningkatkan kinerja operasional terminal peti kemas. Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor penyebab menurunnya nilai Dwelling Time dan mengetahui strategi yang paling tepat untuk mengatasi Dwelling Time. Metode yang digunakan dalam penelitian ini adalah analisis SWOT yang didukung dengan matriks IFE, matriks EFE, matriks IE dan matriks QSPM. Hasil penelitian ini adalah 10 faktor internal yang terdiri dari 5 kekuatan dan 5 kelemahan, kemudian 10 faktor eksternal yang terdiri dari 5 peluang dan 5 ancaman. Kemudian diketahui posisi perusahaan berada pada sel 1 yaitu tumbuh dan berkembang serta mendapatkan rekomendasi strategi perbaikan Dwelling Time.
ANALISIS PENYEBAB PENINGKATAN DURASI REPARASI MT. RATU RUWAIDAH DENGAN FTA DAN FMECA Betty Nur Kumala; Fitri Hardiyanti; Devina Puspita Sari
Proceeding Maritime Business Management Conference MBMC: Proceeding Maritime Business Management Conference 2024
Publisher : Program Studi D4-Manajemen Bisnis, Jurusan Teknik Bangunan Kapal, Politeknik Perkapalan Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33863/mbmc.v3i1.3226

Abstract

According to Dock News data on repair projects throughout 2022 carried out at PT PAL Indonesia's Dock shows that the MT Ratu Ruwaidah repair project is the only project that has increased duration, which is 64 days. The purpose of the research is to find out the root cause of the increase in duration, evaluate the risks, and find out the recommendations for handling. Starting with the Fault Tree Analysis method to obtain the Minimal Cut Set of the root cause of the increase. Furthermore, determining the Minimal Cut Set as a failure mode for Severity, Occurrence and Detection assessment by respondents to be processed in the Failure Modes, Effect and Criticality Analysis method. With the risk treatment matrix, failure modes can be identified how to handle them. The result of the research is that there are 23 events from the minimum cut set that are determined as failure modes. In the processing of the Failure Modes, Effect And Criticality Analysis method, the Pareto diagram stage obtained only 13 priority event/failure mode codes. As a result, the 13 failure modes occupy the colors red (prevent and mitigate), orange (mitigate) and yellow (prevent) in the risk treatment matrix.
Analisis Risiko Overhaul SPM RU VI Balongan pada Galangan Surabaya menggunakan Metode FMEA dan FTA risna prabandari; Irma Rustini Aju; Devina Puspita Sari
Proceeding Maritime Business Management Conference MBMC: Proceeding Maritime Business Management Conference 2024
Publisher : Program Studi D4-Manajemen Bisnis, Jurusan Teknik Bangunan Kapal, Politeknik Perkapalan Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33863/mbmc.v3i1.3235

Abstract

Single Point Mooring (SPM) is a system used to connect tankers with offshore installations to move oil or gas from ships to land. Therefore, SPM must be able to operate in good condition by carrying out routine maintenance. Surabaya Shipyard often receives requests for SPM repairs, but the risk level is often at a dangerous risk. This study aims to determine the right mitigation in overcoming the risk of SPM overhaul using the Failure Mode and Effect Analysis (FMEA) method to get the highest risk (RPN) and the Fault Tree Analysis (FTA) method which is useful for determining the factors that cause damage to the system. Based on the results of the study, 5 top events were obtained which were the priority risks in the overhaul process. From the 5 top events, 14 basic events were obtained which were the root cause of the failure of the SPM overhaul and mitigation must be carried out immediately so that the risk can be overcome and does not cause losses to Surabaya Shipyard.
ANALISIS PENGUKURAN WAKTU PELAYANAN TRUCK ROUND TIME DENGAN VALUE STREAM MAPPING Putri Rahmadhani; Devina Puspita Sari; Yugowati Praharsi
Proceeding Maritime Business Management Conference MBMC: Proceeding Maritime Business Management Conference 2024
Publisher : Program Studi D4-Manajemen Bisnis, Jurusan Teknik Bangunan Kapal, Politeknik Perkapalan Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33863/mbmc.v3i1.3245

Abstract

Container depots serve as distribution centers connecting manufacturers to consumers viamaritime routes. To enhance service quality, this research aims to measure the service timesinvolved in the container reception and delivery processes at the depot. The analysis isconducted by collecting time data through direct observation and interviews with relevantstakeholders. One methods utilized is value stream mapping. focusing on identifying nonvalue added activities within the container transfer process. The study reveals significant leadand cycle times for various activities: during the receiving phase, the lead time recorded is2,514.43 seconds with a cycle time of 1,262.35 seconds, while the delivery phase shows alead time of 2,280.21 seconds and a cycle time of 1,301.89 seconds. Through VSM, theanalysis highlights inefficiencies in the container transfer process, emphasizing areas wherenon-value added activities contribute to delays and increased operational times. Bypinpointing these inefficiencies, the study aims to provide actionable insights to streamlineprocesses, reduce lead and cycle times, and enhance overall operational efficiency at thedepot.
Analisis Pengaruh Work-Life Balance dan Kompensasi Terhadap Kepuasan Kerja Karyawan Pada Perusahaan Logistik di Surabaya Aisyah Aurelia; Devina Puspita Sari; Irma Rustini Aju
Proceeding Maritime Business Management Conference MBMC: Proceeding Maritime Business Management Conference 2024
Publisher : Program Studi D4-Manajemen Bisnis, Jurusan Teknik Bangunan Kapal, Politeknik Perkapalan Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33863/mbmc.v3i1.3257

Abstract

This research was conducted at a Logistic Company in Surabaya, where employee work demands were increasing but inversely proportional to the number of employees who are decreasing due to resignation. High work demands make most employees work overtime, which can affect employees' work-life balance. The company explained that it does not have an overtime system, so employees do not receive incentives as compensation for the extra contributions made. The purpose of this study was to determine the effect of work-life balance and compensation on employee job satisfaction. The study used multiple linear regression analysis. The data used with a sampling technique is saturated sample. The data were processed using SPSS 25 with the results of the t test showing the value of t count 2,519> 2,026 t table and a significance value of 0,016 < 0,05, so that work-life balance partially affects job satisfaction. The t value is 5,104> 2,026 t table and the significance value is 0.000 < 0.05, so compensation partially affects job satisfaction. The results of the f test show the value of f count 18,749 > 4,105 F table and a significance value of 0,000 <0,05, so it can be concluded that work-life balance and compensation simultaneously affect job satisfaction