Claim Missing Document
Check
Articles

Found 34 Documents
Search

Implementasi Model Jaringan dan Critical Path Method Pada Perencanaan dan Penjadwalan Proyek Bendungan PT. ABC Pramudi Arsiwi; Tita Talitha; Prajanto Wahyu Adi
JURNAL TEKNIK INDUSTRI Vol. 13 No. 1 (2023): VOLUME 13 NO 1 MARET 2023
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/jti.v13i1.17519

Abstract

Intisari—Proyek Bendungan “Y” yang saat ini dikerjakan oleh PT. ABC terdiri dari dua aktivitas besar, yaitu Proyek Pabrikasi dan Proyek Instalasi. Saat ini proyek Pabrikasi sudah terselesaikan dan akan segera dilanjutkan Proyek Instalasi Komponen Hidromekanikal Bendungan “Y” yang berlokasi di Konawe, Sulawesi Tenggara. Berdasarkan data yang didapatkan dari Wawancara dengan Manajer Proyek, diketahui bahwa pelaksanaan Proyek Pabrikasi Bendungan mengalami keterlambatan 30 hari dalam pelaksanaannya. Hal ini tentu menjadi sebuah peringatan sekaligus acuan bagi tim Proyek untuk memastikan bahwa untuk proyek lanjutan yaitu Proyek Instalasi Bendungan, jangan sampai terjadi keterlambatan seperti yang terjadi pada proyek sebelumnya. Tujuan dari penelitian ini adalah untuk membuat perencanaan dan penjadwalan Proyek Instalasi Komponen Hidromekanikal Bendungan “Y” menggunakan pendekatan Critical Path Method (CPM). Metode tersebut ditujukan untuk menganalisis aktivitas kritis yang dapat menjadi acuan untuk mengetahui durasi total proyek keseluruhan, dimana pada aktivitas kritis tersebut tidak boleh ada keterlambatan. Berdasarkan hasil penelitian, diketahui bahwa Proyek Instalasi Komponen Hidromekanikal Bendungan “Y” memiliki jumlah aktivitas sebanyak 58 aktivitas, dan 29 diantaranya tergolong dalam aktivitas kritis yang tidak memiliki waktu longgar (slack time) untuk terjadinya penundaan atau keterlambatan. Total durasi Proyek Instalasi Komponen Hidromekanikal Bendungan “Y” secara keseluruhan yang diperoleh dari pendekatan CPM adalah 209 hari. Abstract—The “Y” Dam Project which is currently being carried out by PT. ABC consists of two major activities, namely Fabrication Project and Installation Project. At present the Fabrication project has been completed and will soon be continued by the "Y" Dam Hydromechanical Component Installation Project located in Konawe, Southeast Sulawesi. Based on the data obtained from the Interview with the Project Manager, it is known that the implementation of the Dam Manufacturing Project has been delayed by 30 days in its implementation. This certainly serves as a warning as well as a reference for the Project team to ensure that for the follow-up project, namely the Dam Installation Project, there should not be delays as happened in the previous project. The purpose of this research is to plan and schedule the "Y" Dam Hydromechanical Component Installation Project using the Critical Path Method (CPM) approach. This method is intended to analyze critical activities which can be used as a reference to determine the total duration of the entire project, where there should be no delay in these critical activities. Based on the research results, it is known that the "Y" Dam Hydromechanical Component Installation Project has a total of 58 activities, and 29 of them are classified as critical activities that do not have slack time for delays or delays. The total duration of the overall “Y” Dam Hydromechanical Component Installation Project obtained from the CPM approach is 209 days.
The organic waste management supply chain performance evaluation strategy uses an Interpretive Structural Modeling approach Arsiwi, Pramudi; Setyaningrum, Ratih; Talitha, Tita; Ramdhani, Safarudin
OPSI Vol 17, No 1 (2024): ISSN 1693-2102
Publisher : Jurusan Teknik Industri Fakultas Teknologi Industri UPN "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/opsi.v17i1.12242

Abstract

National Waste Management Information System shows that the amount of waste handled in Semarang City over the last three years has decreased with an average decline index of 1.06% per year. This is reinforced by the results of interviews with the Semarang City Environmental Service, that the handling of organic waste is still very limited because so far the handling has been more focused on an-organic waste. Therefore, it is necessary to evaluate supply chain performance to determine the constraints in organic waste management from upstream to downstream. Based on the research results using the Interpretive Structural Modeling (ISM) method through a focus group discussion process involving eight experts in the field of waste management, it is known that the supply chain performance for handling organic waste in Semarang City has 11 elements of constraints, which are divided into seven priority levels. The element with the highest priority is related to the availability of organic waste supplies, while the element with the lowest priority is technological innovation and the application of appropriate technology. Improving the performance of organic waste management supply chains should focus on elements according to priority.
Perancangan Ulang (Redesign) Produk Tangan Palsu Dengan Metode 3D Printing Karim, Muhammad Sofyan; Arsiwi, Pramudi
Applied Industrial Engineering Journal Vol. 6 No. 1 (2022): JUNI
Publisher : Universitas Dian Nuswantoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33633/aiej.v6i1.6538

Abstract

Perkembangan dalam bidang Kesehatan selalu dibutuhkan setiap waktu, terutama dari segi teknologi. Salah satu hasil kreativitas di bidang Kesehatan yang berasal dari Semarang adalah adanya produk tangan palsu yang dicetak menggunakan mesin 3D print. Latar belakang permasalahan yang dihadapi dari teknologi 3D print tangan palsu saat ini yaitu terkait kualitas tangan palsu yang masih kurang baik yaitu dari aspek harga, desain, dan fungsi. Pada penelitian ini bertujuan untuk melakukan perancangan ulang tangan palsu dari desain yang sudah ada saat ini. Hasil rancangan yang telah dibuat dengan mempertimbangkan aspek harga, desain, dan fungsi terbukti sangat efektif dari segi fungsi dimana tangan tersebut dapat menggenggam, berbeda dengan tangan palsu lainnya dimana hanya berfokus pada estetika, hal ini tentu sangat membantu seorang disabilitas yang memiliki cacat pada tangan dari fungsi tangan itu sendiri. Tangan palsu yang dirancang juga memiliki bobot yang lebih ringan daripada yang lain dikarenakan berbahan dasar filament ABS+ dengan bobot sebesar ± 300 gram. Dan dari segi harga, tangan palsu ini memiliki nilai harga yang lebih terjangkau dikarenakan proses pembuatannya menggunakan 3D printing.
Perancangan Alat Pengayak Maggot Portable Sebagai Bentuk Penerapan Teknologi Tepat Guna Untuk UMKM dan Home Industry Mutia, Karina Ayu; Ismiawati, Yuyun; Arsiwi, Pramudi
Industrika : Jurnal Ilmiah Teknik Industri Vol. 9 No. 1 (2025): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/indstrk.v9i1.1774

Abstract

Micro, Small, and Medium Enterprises (MSMEs) play a crucial role in the economy but often face various challenges, such as limited capital, simple technology, and a low level of workforce education. One solution that can be implemented is Appropriate Technology (TTG), which aligns with local needs, is environmentally friendly and optimizes resource use. UMKM REPRO in Semarang, focusing on Black Soldier Fly (BSF) maggot cultivation, faces challenges in the sieving process, which is time-consuming and reduces production efficiency. A maggot sieving tool was developed using the Value Engineering method, emphasizing safety, ergonomics, and cost analysis to address this issue. This tool is expected to make the maggot sieving process more efficient and economical, with an estimated production cost of Rp 290,000. This innovation provides a practical and appropriate solution for MSMEs and home industries in the livestock sector. Keywords: Black Soldier Fly Maggots, MSMEs, Sieving Device, Value Engineering
Desain Sistem Pengelolaan Sampah Organik pada PT. XYZ Menggunakan Metode Supply Chain Management Saputra, Muhammad Fasha Rizky; Arsiwi, Pramudi
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 2 (2025): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i2.43236

Abstract

The accumulation of waste in Indonesia continues to increase over time, especially organic waste such as food waste. With the environmental problems being faced in Indonesia, PT. XYZ provides a solution so that this problem can be helped. PT. XYZ is a start-up that focuses on developing bioconversion technology using Black Soldier Fly (BSF) or maggot flies to process organic waste into high-value products. Supply chain flow is very important in the production process so that the flow from supplier to consumer is structured. Based on observations that have been made, several problems were found at PT. XYZ, namely that there are problems when collecting waste from partners A, B, C, D, and E because these partners are located far from each other so that the arrival of organic waste at PT. XYZ there was a delay. So that these problems can be overcome, it is necessary to approach the problem using the Supply Chain Management method so that the flow of the supply chain can be mapped so that the problem can be resolved. The results of this research obtained a cost reduction of 41.9% after implementing this solution.  
ANALISIS POSTUR PEKERJA PRODUKSI MAGGOT PADA STASIUN KERJA BIOKONVERSI PT. ABC Firdausi, Wafa Al; Arsiwi, Pramudi
Nusantara Hasana Journal Vol. 4 No. 11 (2025): Nusantara Hasana Journal, April 2025
Publisher : Yayasan Nusantara Hasana Berdikari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59003/nhj.v4i11.1411

Abstract

One of the work stations at PT. ABC is the Bioconversion work station (maggot enlargement). At this work station out were approximately 10 minutes for each biopond tank in 1 working day, with a total of 21 tanks. Workers often experience fatigue, especially in the back and neck areas. Therefore, an analysis was carried out on the fatigue factors experienced by workers. In this study, the method used to analyze worker posture is Rapid Entire Body Assessment (REBA). The REBA method is used to analyze overall body posture, and then the results will be tested using Ergofellow software. The results obtained from the investigation of worker posture at the bioconversion work station using Ergofellow software got a score of 6, with a moderate risk. This is because the biopond design is less than ideal. So, the proposed improvement given is to redesign the biopond design, with the hope that workers will no longer bend over when doing work and can minimize the risk of injury.
Penerapan Metode Statistical Process Control Dalam Pengendalian Kualitas Proses Produksi Tahu Dhiba, Aninda Putri; Arsiwi, Pramudi
Jurnal Teknologi dan Manajemen Industri Terapan Vol. 4 No. 2 (2025): Jurnal Teknologi dan Manajemen Industri Terapan
Publisher : Yayasan Inovasi Kemajuan Intelektual

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55826/jtmit.v4i2.586

Abstract

Permintaan tinggi terhadap produk pangan mendorong Pabrik Tahu H. Fadhol untuk meningkatkan kualitas produknya dengan mengurangi jumlah produk cacat, yang saat ini rata-rata mencapai 29 tahu per hari. Jika kondisi ini terus berlanjut, dapat berdampak pada penurunan penjualan dan potensi kerugian. Untuk mengatasi permasalahan ini, digunakan metode Statistical Process Control (SPC) guna mengkaji sejauh mana efektivitas proses produksi yang berjalan serta mengidentifikasi kekurangan dan kelemahannya. Dari hasil kajian melalui diagram Pareto, tingkat kerusakan tertinggi adalah cacat kepotong dengan total 222 potong atau 37,88%, serta kerusakan hancur yang mencapai 364 potong atau 62,12%. Sedangkan capaian kemampuan proses (process capability) saat ini memiliki Cp sebesar 0,00 dengan indeks Cpk -1,54, yang menunjukkan bahwa proses produksi belum mampu menghasilkan tahu sesuai standar. Oleh karena itu, pabrik tahu H. Fadhol perlu mengendalikan proses produksinya agar mencapai nilai indeks kapabilitas Cpk minimal 1. Faktor utama penyebab produk cacat produksi tahu ini adalah aspek manusia dan metode. Rekomendasi perbaikan diperlukan seperti pelatihan SDM dan perbaikan metode kerja sebagai langkah peningkatan kualitas
Optimasi Lokasi Distribution Center UKM Mina Indo Sejahtera dengan Model Matematis Haversin dan Centre of Gravity Adjusting Arsiwi, Pramudi; Wijaya, Dewa Kusuma; Wahyu Adi, Prajanto
JURNAL TEKNIK INDUSTRI Vol. 11 No. 3 (2021): VOLUME 11 NO 3 NOVEMBER 2021
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/jti.v11i3.13070

Abstract

Intisari— Biaya distribusi produk yang masih cukup tinggi dan juga lokasi konsumen yang tersebar di berbagai wilayah Pulau Jawa menjadi sebuah tantangan yang cukup kompleks bagi UKM Mina Indo Sejahtera, agar dapat selalu memenuhi mayoritas bahkan seluruh demand dari konsumen potensialnya dengan biaya yang seefisien mungkin. Oleh karena itu, diperlukan sebuah desain jaringan supply chain yang optimal bagi UKM Mina Indo Sejahtera, agar seluruh konsumen dapat tetap terlayani dengan total biaya distribusi yang tetap efisien. Metode yang digunakan yaitu dengan menggunakan formulasi model matematis haversin dan juga Center of Gravity (COG) Adjusting. Koordinat lokasi yang dihasilkan terbukti mampu meminimalkan total jarak tempuh dan juga total biaya yang harus dikeluarkan UKM Mina Indo Sejahtera untuk mendistribusikan produknya ke seluruh market khususnya di Pulau Jawa. Hasil penurunan total jarak tempuh dan total biaya distribusi bulanan yang didapatkan melalui formula haversin dan metode COG Adjusting yaitu sebesar 22% dan 24%. Sehingga, apabila UKM Mina Indo Sejahtera memusatkan distribusinya pada lokasi baru tersebut, total jarak yang ditempuh ke seluruh pasar di Pulau Jawa dapat diminimalkan menjadi sejauh 1.720, 4 kilometer, dengan total biaya distribusi bulanan yang dikeluarkan hanya sebesar Rp Rp 11.736.455,-.. Abstract— The cost of product distribution is still quite high and also the location of consumers spread across various regions of Java Island is a fairly complex challenge for Mina Indo Sejahtera SMEs, in order to always meet the majority and even all demands from potential consumers at the most efficient cost possible. Therefore, an optimal supply chain network design is needed for Mina Indo Sejahtera SMEs, so that all consumers can still be served with efficient total distribution costs. The method used is by using a haversin mathematical model formulation and also Center of Gravity (COG) Adjusting. The resulting location coordinates are proven to be able to minimize the total distance traveled and also the total costs that must be incurred by Mina Indo Sejahtera SMEs to distribute their products to all markets, especially in Java. The results of the reduction in total mileage and total monthly distribution costs obtained through the haversin formula and the COG Adjusting method are 22% and 24%, respectively. Thus, if Mina Indo Sejahtera SMEs concentrated their distribution in the new location, the total distance traveled to all markets on Java Island could be minimized to 1,720, 4 kilometers, with a total monthly distribution cost of only Rp. 11,736,455,-.
Evaluasi Sistem Antrian SPBU Madukoro Kota Semarang Berbasis Pemodelan dan Simulasi Sistem Diskrit Arsiwi, Pramudi; Putri Dhiba, Aninda; Aditya, Agsre; Sabila Ulhaq, Naswa; Dian Riyanti, Popy
Applied Industrial Engineering Journal Vol. 8 No. 2 (2024): DESEMBER
Publisher : Universitas Dian Nuswantoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33633/aiej.v8i2.12638

Abstract

Kualitas layanan yang diberikan oleh sebuah perusahaan memiliki dampak besar terhadap tingkat kepuasan yang dirasakan oleh pelanggan. Ketika permintaan melebihi kapasitas yang ada, maka menimbulkan sebuah antrian. Sehingga dilakukan observasi pada SPBU Madukoro yang berlokasi di Jl. Jenderal Sudirman, Kota Semarang, pada kendaraan roda dua dan roda empat dengan mengabaikan jenis bahan bakar yang diisi dengan durasi pengamatan adalah 1 jam 15 menit. Ukuran performa yang dievaluasi meliputi jumlah antrian, waktu tunggu, dan nilai utilitas. Berdasarkan data yang diamati dan diolah menggunakan software Arena, hasilnya menunjukkan adanya antrian di server keempat dengan nilai utilitas yang hampir mencapai satu, menandakan tingkat kesibukan yang tinggi. Untuk meningkatkan efisiensi utilitas SPBU, disarankan merancang model perbaikan dengan menambah jumlah server di stasiun pengisian roda empat. Diharapkan penambahan ini dapat mengurangi nilai utilitas secara signifikan, menjadikannya di bawah angka satu. Perbaikan ini dapat berdampak pada kepuasan layanan konsumen saat langkah-langkah perbaikan dilakukan untuk mengatasi antrian.
Usulan Desain Kemasan Pupuk Organik Padat dan Cair dalam Meningkatkan Value Added UMKM REPRO Aulia, Arshinta Wilda; Setyaningrum, Ratih; Arsiwi, Pramudi; Andayani, Karenina Puri
Industrika : Jurnal Ilmiah Teknik Industri Vol. 9 No. 3 (2025): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/indstrk.v9i3.1757

Abstract

Micro, Small and Medium Enterprises (MSMEs) Organic Product Engineering (REPRO) is one of the MSMEs that is trying to reduce organic waste, namely by processing organic waste using BSF (Black Soldier Fly) flies. In addition to decomposing organic waste, the production results at UMKM REPRO produce derivative products that have selling value, namely solid organic fertilizer resulting from filtering used maggot feed and liquid organic fertilizer obtained from filtering fermented maggot feed. With the existence of products that have selling value, it is necessary to develop product packaging design with development efforts that are implemented to increase value added, branding, attractiveness and competitiveness in facing the modern market with good product quality, and relatively cheap product prices from the results of ideas through creative and innovative behavior. The objective of this research is to provide a packaging design proposal that can compete in the market and analyze the added value of MSMEs in the development of solid and liquid organic fertilizer product packaging. Keywords: Attraction, Design, Liquid Organic Fertilizer, Packaging, Solid Organic Fertilizer