Development in Design Stage Based on Risk to Reduce Variation Order in Building Construction Project at PT. XYZ Bani Adlan Tedja; Ayomi Dita Rarasati
Journal of International Conference Proceedings Vol 4, No 3 (2021): 2021 WIMAYA International Conference of Economics and Business
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v4i3.1350

Abstract

The consultant planning is the key to create document design for project construction. In the world of construction, Variation order are frequent occurrence, many factors cause variation order is uncontrollable, the most common caused by consultant planning. The main task of consultant planning is to provide design architectural in drawing documentation and technical report document that enable contractor to make all of these idea into physical reality in the project. Design error, inadequate design, failure of design or lack of coordination area common cause of variation order by the consultant planning. For this reason, it needs a strategy in the design stage process in order to minimize the occurrence of variation orders. This study aims to identify the stage of design process, identify the risk that occur at the design stage that cause variation orders and the strategy to reduce variation orders caused by the consultant planning.
Evaluation of Fire Safety Officer Competencies on the Reliability of Building Fire Protection and Prevention Systems Achmad Firdaus; Ayomi Dita Rarasati
Journal of International Conference Proceedings (JICP) Vol 2, No 1 (2019): Proceedings of the 3rd International Conference of Project Management (ICPM) Bal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (22.753 KB) | DOI: 10.32535/jicp.v2i1.391

Abstract

High rise buildings can be a safe place for activities when protected by a reliable fire protection system. Fire safety studies are generally focus on active and passive fire protection systems, life-saving and fire evacuation in a building. This study aims to examine fire protection systems from the fire safety officers’ perspective as an important part to ensure that the protection system can function properly and as an initial responder to fire. This study concludes the needs of fire safety officer in a multi-storey building that absolutely necessary as an element of managing the fire protection system and as an initial responder of fire to minimize the impact of property losses and casualties.
Development of Contract Management Strategy to Control Late Payment in Building Projects Yunianto, Irwan; Rarasati, Ayomi Dita
Journal of International Conference Proceedings Vol 3, No 4 (2020): Proceedings of the 8th International Conference of Project Management (ICPM) Mal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v3i4.1005

Abstract

Building projects with private ownerss have high level of payment issues (late payment, underpayment, or non-payment). The purpose of this study is to develop a risk-based contract management strategy to avoid late payment from private ownerss to contractors. The research data consisted of literature reviews, questionnaires, and qualitative risk data analyses. The risk analyses identified 10 highest risks as the dominant risk factors from 37 risk variables. The risk response to dominant risk variables was used as a strategy for developing a contract management system. Risks affecting late payment were largely due to contractual clause and contracting clients with less financial capacity due to lack of analysis in the pre-contract phase.
Development of Contract Management Strategy to Control Late Payment in Building Projects Yunianto, Irwan; Rarasati, Ayomi Dita
Journal of International Conference Proceedings Vol 3, No 4 (2020): Proceedings of the 8th International Conference of Project Management (ICPM) Mal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v3i4.1005

Abstract

Building projects with private ownerss have high level of payment issues (late payment, underpayment, or non-payment). The purpose of this study is to develop a risk-based contract management strategy to avoid late payment from private ownerss to contractors. The research data consisted of literature reviews, questionnaires, and qualitative risk data analyses. The risk analyses identified 10 highest risks as the dominant risk factors from 37 risk variables. The risk response to dominant risk variables was used as a strategy for developing a contract management system. Risks affecting late payment were largely due to contractual clause and contracting clients with less financial capacity due to lack of analysis in the pre-contract phase.