Claim Missing Document
Check
Articles

Found 2 Documents
Search

Development of the Soekarno–Hatta International Airport Rail Link Project Using the Value Engineering Method: Creating Value for Money Berawi, Mohammed Ali; Susantono, Bambang; Dikun, Suyono; Ilyas, Tommy; Rahman, Herawati Zetha; Berawi, Abdur Rohim Boy; Zagloel, Teuku Yuri; Miraj, Perdana; Petroceany, Jade Sjafrecia
Makara Journal of Technology Vol. 18, No. 3
Publisher : UI Scholars Hub

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Soekarno–Hatta Airport is the main gateway for international flights to Greater Jakarta. Its accessibility depends on the inter-city and Sedyatmo toll roads, which causes congestion in peak hours, leading to uncertainty about travel times. The Soekarno–Hatta International Airport Rail Link (SHIARL) is proposed as an alternative mass transportation project, which is expected to provide accessibility and mobility for people and goods to and from the airport. Previously, the project was unattractive to private investors as it was technically and financially unfeasible. Therefore, this research aims to improve the feasibility of the Soekarno-Hatta International Airport Rail Link (SHIARL) by using a value-engineering approach to create maximum value for money for the project. This research combines quantitative and qualitative methods. Questionnaire surveys are distributed to various stakeholders in the project, and a focus-group discussion (FGD) is conducted. The results identified additional, innovative functions through the integration of the Mass Rapid Transit (MRT), flood control, telecommunications, and development in the downtown area around the station. The life-cycle cost analysis confirmed the increased value for money because of the project’s additional functions, including a positive Net Present Value (NPV). Moreover, the findings showed that the internal rate of return (IRR) was 3% higher than the original single-function project.
Developing Road Infrastructure Route Planning: Increasing Feasibility of Toll Road Project Berawi, Mohammed Ali; Zagloel, Teuku Yuri; Miraj, Perdana; Berawi, Abdur Rohim Boy; Titaheluw, Wellsi; Karim, Saipol Bari Bin Abd
Makara Journal of Technology Vol. 20, No. 3
Publisher : UI Scholars Hub

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Indonesian government attempts to improve connectivity and to increase regional activities in Sumatera Island through the development of Trans Sumatera Toll Road (TSTR). However, despite its benefits to local economic development in Sumatera, the project shows low feasibility due to a low amount of investment. It can be attributed from the lack of planning in the initial phase to produce a comprehensive route that considers the various potentials of the regions. Thus, this research aims to investigate alternative route planning of Trans Sumatera Toll Road particularly in this paper for Central Sumatera by studying Gross Regional Domestic Product (GRDP), population and other significant factors. This research exposes cities and districts in Riau, West Sumatera, and Jambi which potentially contribute to the regional economy. Each selected towns and districts will be integrated with the intermodal system and connected to other functions to establish the Trans Sumatera Toll Road project in Central Sumatera. Compared to existing estimation of investment from public records, this alternative route has generated a competitive cost of investment which is estimated around 118,053,400,074,696 rupiahs. The research findings are expected to become the basis to improve other similar infrastructure toll road project development.