Analisis Postur Tubuh Operator pada Saat Bekerja Menggunakan Metode Ovako Working Analysis System (OWAS) Firman Zuhuri Yanto; Sutrisno Sutrisno
STRING (Satuan Tulisan Riset dan Inovasi Teknologi) Vol 7, No 3 (2023)
Publisher : Universitas Indraprasta PGRI Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30998/string.v7i3.14748

Abstract

One of the interesting topics that is needed to be analyzed and studied more deeply in a study is analysis to find out the posture of a worker in carrying out a job. Work posture is a decisive point in analyzing the effectiveness of a job. If operators have a good and ergonomic work posture, they certainly have good job results. Operators who easily experience fatigue can be seen from the results of their completed work. Their work decreases and is not as expected, followed by various musculoskeletal complaints on parts of the skeletal muscles suffered by a person ranging from very slight to severe complaints. The complaints to injury are usually termed complaints of musculoskeletal disorders (MSDs) or complaints of musculoskeletal injuries. The OWAS method is a method that provides output in the form of a category of work attitudes that are at risk of work accidents in the musculoskeletal section. Based on the results of research using the OWAS method, it is known that out of the 7 operators observed, 3 operators are in category 2, namely dangerous or require improvement in work posture, while 4 operators are in safe category
Analisis Manajemen Risiko K3 Metode DMAIC Pada Pekerjaan Proyek XYZ Di Kabupaten Karawang Siti Khalimatul Inayah; Bagas Firdauzi; Sutrisno Sutrisno
Teknika Vol 18, No 1 (2023): Maret
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/teknika.v18i1.6134

Abstract

Sistem manajemen K3 (Kesehatan dan Keselamatan Kerja) merupakan bagian dari keseluruhan manajemen, prosedur dan sumber daya yang diperlukan untuk struktur organisasi, perencanaan, tanggung jawab, pelaksanaan, pengembangan kinerja, implementasi, evaluasi dan manajemen risiko, serta aktivitas kerja dalam proyek konstruksi. Tingkat kesehatan dan keselamatan kerja pada proyek konstruksi gedung masih sering terabaikan, sehingga membutuhkan regulasi atau standar operasional prosedur (SOP) untuk mengurangi kecelakaan kerja yang tidak diinginkan. Proyek XYZ yang dilaksanakan di Kabupaten Karawang merupakan salah satu proyek konstruksi yang perlu dilakukan analisis mengenai sistem manajemen K3. Dalam menganalisa menggunakan metode DMAIC untuk meningkatkan dan mengoptimasi terhadap analisa proyek kontruksi dengan memperhatikan yang terjadi di proyek. Hal ini bertujuan dengan menggunakan pendekatan sistem manajemen K3 metode DMAIC maka dapat dilakukan pencegahan atau perubahan regulasi mengenai potensi kecelakaan kerja, mengidentifikasi risiko dominan yang berpotensi terjadinya kecelakaan kerja serta penanggulangannya. Hasil penelitian dengan menggunakan metode kuisioner didapatkan nilai sebesar 62,67% permasalahan terhadap Perencanaan K3. Selain itu, pengolahan data lebih lanjut mengungkapkan adanya potensi kerusakan pada alat, bahan dan mesin yang digunakan, seperti yang dapat dilihat pada diagram Ishikawa (fishbone diagram). Pada pendekatan DMAIC menunjukkan perlunya membuat SOP dan kemudian mensosialisasikan pelatihan bagi pekerja untuk mengurangi cedera di tempat kerja.
Analisis Keselamatan Dan Kesehatan Kerja Dengan Menggunakan Metode Hazop Pada Proses Pan Oil Di PT. X Moh Jidni Ilman Maarif; Sutrisno Sutrisno
Industrika : Jurnal Ilmiah Teknik Industri Vol. 7 No. 2 (2023): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/indstrk.v7i2.912

Abstract

PT. X works in the automotive manufacturing industry. There are various departments in the corporate structure, one of which is K3 (Occupational Health and Safety). This department is an important part of a company. Bearing in mind that all machines and equipment used have potential hazards. Therefore, the purpose of this research is to examine the risk of work accidents that endanger the safety and health of employees. To control the potential for work accidents, the HAZOP method was chosen. The HAZOP approach was used to conduct this research. Hazard and Operability Studies (HAZOP) was founded by ICI, a British chemical company. As a result, HAZOPs are increasingly being used in the chemical sector where they will be used in dealing with accidents that occur due to negligence of workers. The results obtained when conducting research using the hazop method obtained 3 levels of hazard risk and showing the percentage of each level of risk, including 50% low risk, 25% high risk, and 25% extreme risk. Low risk is the process of using manual equipment and forklifts, high level of risk in the machining process, and extreme level of risk in the casting process. Keywords: Accident, hazop, health, safety, work
Business Process Improvement Rute Distribusi Menggunakan VRP dengan Pendekatan Strategi Cluster First Route Second (Studi kasus CV Bintang Globalindo Karawang) Sutrisno Sutrisno; Jauhari Arifin; Audi Pramudya
Jurnal Serambi Engineering Vol 8, No 2 (2023): April 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i2.6007

Abstract

Distribution and transportation aspects are quite crucial for the survival of a company's business and operational activities. Characteristics and conditions of the distribution aspect of a company can affect the capital and the selling price of products that consumers will accept. Then needed optimal handling of distribution, especially in the case of product distribution routes as a form of business process improvement. The purpose of this study is to carry out business process improvement in kraft paper’s distribution at CV. Bintang Globalindo. The distribution route identification process is carried out through a saving matrix with a cluster first route second strategy approach. Clustering results based on the saving matrix produce 3 route clusters with the total order for each cluster still below the maximum load capacity of 25 tons. The results of the third cluster routing with the nearest insert and nearest neighbor algorithms produce the same route, there is; 1) Karawang Cirebon–Ciamis–Karawang, 2) Karawang–Bandung–Cianjur–Sukabumi–Karawang, and 3) Karawang–Jakarta–Tangerang–Bogor–Karawang. New route has a total distance of 1.097 km or a difference of 9.41% from the initial route. In addition, the range of cargo utilities from this proposed route is 80 - 90.4%, denser than the initial route of 76.8 - 96.8%
Analisis Manajemen Risiko Pada Proyek Instalasi Fire Sprinkler System PT. XYZ Audi Pramudya; Sutrisno Sutrisno; Gustiandikha Saputri
Jurnal Serambi Engineering Vol 8, No 2 (2023): April 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i2.5997

Abstract

Suatu proyek tidak dapat terlepas dari risiko-risiko yang memungkinkan untuk dialami dan bersifat tidak diharapkan. Risiko tersebut kebanyakan tidak dapat dihindari dan diprediksi. Namun, secara teoritis dapat dikelola dalam sebuah aktivitas manajemen risiko untuk memperkecil dampak negatifnya. Tujuan penelitian ini adalah menganalisis dan mengidentifikasi risiko-risiko yang memungkinkan terjadi pada proyek instalasi fire sprinkler system di PT. XYZ. Penelitian ini menggunakan teknik penelitian kualitatif-deskriptif dengan pendekatan severity index dan probability impact matrix pada analisis data kuesioner yang disebar melalui responden yang bersifat purposive sampling. Setelah dilakukan tahap identifikasi risiko, diketahui ada 8 variabel risiko dengan 54 indikator risiko yang relevan dengan proyek instalasi tersebut. Adapun variabel risiko ini, yaitu: variabel risiko force majeure, variabel risiko proyek, variabel risiko kontraktual, variabel risiko tenaga kerja, variabel risiko peralatan, variabel risiko material, variabel risiko keuangan, dan variabel risiko manajemen. Hasil identifikasi risiko lalu dianalisis dan dievaluasi melalui pendekatan severity index dan probability impact matrix diperoleh informasi, antara lain: 39 risiko berkategori risiko sedang, 10 risiko berkategori risiko rendah dan 5 risiko berkategori risiko tinggi.
Implementasi Metode CPM, Crashing dan PERT Pada Penjadwalan Proyek Pembangunan Masjid dan Asrama Yatim Piatu Barokah Amanah Mustaqbal Sutrisno Sutrisno; Audi Pramudya; Rudi Effendi Listyanto
Jurnal Serambi Engineering Vol 8, No 2 (2023): April 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i2.5979

Abstract

Scheduling is one of many project management activities that have a crucial role and support the success of a project. The existence of good scheduling is able to minimize delays in project completion and swelling of the budget costs incurred. This study aims to identify the optimal completion time, determine alternative acceleration, as well as the probability of completing the target duration for the construction project of Mosque and Orphan Dormitory Barokah Amanah Mustaqbal Foundation, Karawang. Based on analysis of CPM and PERT, critical path activities are A-C-D-E-F-G-H-K-M-N-O-P-Q-R-S-T with time completion faster than the target set for 90 days. In the CPM method, the project completion time takes 87 days. These results can also be accelerated by crashing programs on 7 alternative project activities, there is: M-P-O-E�Q-H-S. Crashing for a maximum of 8 days requires an increase in labor costs of 6,09% (Rp10.954.109) of the initial cost. The PERT method shows that a project duration of 86,7 days at probability level that can be completed in less than 90 days of 91,31%.
Analisis Potensi Bahaya dengan Metode HIRADC untuk Mencegah Terjadinya Kecelakaan Kerja di Departemen Injection PT. Indonesia Thai summit plastech Shely Nur Syawal; Kusnadi Kusnadi; Sutrisno Sutrisno
Jurnal Serambi Engineering Vol 8, No 1 (2023): Januari 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i1.5038

Abstract

Abstract The rapid development of the industry has made many companies use increasingly sophisticated technology and machines. However, the addition of these machines also has the potential for work accidents. Every workplace has potential and risks that can be the reason for work accidents. Therefore, the company needs to ensure that every employee gets good K3 protection. The implementation of K3 must be carried out properly in every company, whether large or small. One way is to identify risks from potential hazards in the workplace. This research is intended to identify hazard risks and assess the risks that exist in PT. Indonesia Thai summit plastech (ITSP). In achieving this goal, the methods used in this study are Hazard Identification, Risk Assessment and Determining Control (HIRADC). Then the results obtained from the analysis process are known to have 9 potential risks that can cause work accidents. Of the 9 risks, 2 are in the low risk category, 2 are moderate risk, 2 are high risk, and 2 are extreme risk. From these potential risks, control measures that can be taken include regular employee meetings, operator certification, and reaffirming the use of PPE.Keywords: PT. ITSP, Hazard, HIRADC, Accident, K3. AbstrakPerkembangan industri yang sangat pesat membuat banyak perusahaan menggunakan teknologi dan mesin yang semakin canggih. Namun penambahan mesin tersebut juga disisi lain memiliki potensi untuk terjadinya kecelakaan kerja. Setiap tempat kerja memiliki potensi dan risiko yang dapat menjadi alasan terjadinya kecelakaan kerja. Oleh karena itu perusahaan perlu menjamin setiap karyawan mendapatkan perlindungan K3 yang baik. Pelaksanaan K3 harus dilakukan dengan baik disetiap perusahaan baik besar ataupun kecil. Salah satu caranya adalah dengan mengidentifikasi risiko dari potensi bahaya yang terdapat ditempat kerja. Adapun penelitian ini ditujukan untuk melakukan identifikasi risiko bahaya dan menilai risiko yang ada di PT. Indonesia Thai summit plastech (ITSP). Dalam mencapai tujuan tersebut digunakan metode pada penelitian ini yaitu Hazard Identification, Risk Assesment and Determining Control (HIRADC). Kemudian hasil yang diperoleh dari proses analisis yaitu diketahui terdapat 9 potensi risiko yang dapat menyebabkan kecelakaan kerja. Dari 9 risiko tersebut 2 berada pada kategori low risk, 2 pada moderate risk, 2 high risk, dan 2 pada ekstreme risk. Dari potensi risiko tersebut, upaya pengendalian yang dapat dilakukan seperti adanya meeting berkala pada karyawan, sertifikasi operator, dan menegaskan kembali penggunaan APD.Kata Kunci: PT. ITSP, Bahaya, HIRADC, Kecelakaan, K3
Penerapan Metode CPM dan PERT pada Proyek Pembangunan Drainase di Perum Cengkong guna Mempercepat Waktu Penyelesaian (Studi Kasus: CV XYZ) Dwiki Muhammad Julian; Sutrisno Sutrisno; Ariq Adhari Basri
Jurnal Serambi Engineering Vol 8, No 1 (2023): Januari 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i1.5327

Abstract

Proyek pembangunan drainase di Perumahan Cengkong dilaksanakan CV. XYZ sebagai kontraktor yang handal. Untuk menyelesaikan proyek tersebut, CV. XYZ membutuhkan waktu penyelesaian proyek 60 hari kerja (2 bulan) dengan target 2 x 145,00 M3 dengan ketinggian drainase 0,90 m dengan melakukan analisis percepatan proyek dengan pendekatan CPM-PERT. Penelitian bertujuan untuk mengetahui waktu yang optimal dari proyek pembangunan Drainase sehingga meminimalisir keterlambatan proyek dan bisa dijadikan acuan dalam evaluasi tingkat efektivitas dan efisiensi penyelesaian proyek. Hasil analisis dari proyek pembangunan drainase di Dusun Cengkong III yaitu dengan menggunakan penerapan metode CPM pada penyelesaian proyek pembangunan drainase ini didapat suatu jalur kritis yaitu kode aktivitas A – B – C – D – F – G dengan perolehan waktu penyelesaian yang optimal yaitu selama 52 hari. Hasil ini menjadikan proyek lebih efektif karena estimasi awal yang ditetapkan oleh perusahaan dalam melaksanakan proyek pembangunan ini yaitu selama 60 hari tanpa menggunakan metode. Dengan menggunakan penerapan metode Program Evaluation and Review Technique didapat expected time dari proyek pembangunan ini yaitu selama 51,7 hari berdasarkan jalur kritis yang telah diketahui sebelumnya dari metode Critical Path Method. Pada kedua metode ini didapat waktu penyelesaian optimal yang sama apabila dibulatkan yaitu selama 52 hari, sehingga berdasarkan metode PERT probabilitas penyelesaian proyek pembangunan drainase dapat dilaksanakan yaitu sebesar 99,97%.
Penerapan Teknologi Nanofluida pada Hand washer dalam Upaya Pencegahan Penyebaran Covid-19 di Desa Tanjung Bungin Kab. Karawang Vera Pangni Fahriani; Sutrisno Sutrisno; Apid Hapid Maksum; Marchanda Rahmawati Martin; Reza Setiawan
KREATIF: Jurnal Pengabdian Masyarakat Sains dan Teknologi Vol 2 No 1 (2024): Kreatif
Publisher : Fakultas Teknik, Universitas Singaperbangsa Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35706/kreatif.v2i1.11160

Abstract

This Community Service Program (PKM) aims to assist and carry out outreach as an effort to prevent the spread of Covid-19 in a standard and effective manner, and to help cultivate a culture of mutual cooperation and Village independence in making nanofluid droplet hand washer fluid technology. The partner for this service activity is Tanjung Bungin Village, Karawang. The village's location close to Tanjungpakis Beach means that many people pass by and stop by, but there is still low awareness of the Covid-19 pandemic and there are no adequate public facilities for nanofluid droplet hand washer technology and there has not yet been a good awareness of cultivating mutual cooperation and village independence in making nanofluid droplet hand washer technology is a problem. The solution to this problem is to apply nanofluid technology to hand washers. The PKM implementation method is carried out from the preparation stage to the use of hand washer tools and materials directly in public facilities as well as evaluation by looking at and listening to suggestions for tools and materials for improvement. The results of this PKM were in the form of natural hand washer fluid and nanofluid hand washer tools as well as a positive response to socialization activities and handover of hand washer tools.