IDENTIFIKASI FAKTOR–FAKTOR UTAMA PENYEBAB TERJADINYA KETERLAMBATAN WAKTU PENYELESAIAN PADA PEKERJAAN INFRASTRUKTUR GEDUNG DI BANDA ACEH Darmawi Darmawi; Muttaqin Muttaqin; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 3, No 1 (2020): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v3i1.16456

Abstract

The implementation of building construction projects in the city of Banda Aceh in the Fiscal Year 2015 to 2017, many experienced delays in the implementation caused by many factors both internal factors and external factors. This research was conducted with the aim to find out the top five rankings of the main factors that caused the delay in the implementation of building construction project in Banda Aceh City and to get the main factors that can be done to prevent/overcome delays in the implementation of building construction projects in Banda Aceh City. Data collection was conducted by questionnaire survey method to 40 respondents from the owner and 40 respondents from the contractor who had been involved in handling building construction projects. Based on the results of data analysis and discussions that have been carried out, it is determined that the top five ranks of the main factors causing the delays in implementation of the building construction project in the city of Banda Aceh are: Design changes/work details at the time of implementation, natural disasters such as fires, flood, bad weather, storm/hurricane, earthquake, landslide; Conditions and environment that are not as expected; Wrong/incomplete in making planning (drawings/specifications); and Often/ lot of work is added/less. While the top five ranking solutions for the main factors that can be done to prevent/overcome delays in implementation of building construction projects in Banda Aceh City are: Reviewing the design before starting work; Knowing weather prediction during implementation; Conducting feasibility studies and field investigations before the execution of work; During the Pre Construction Meeting the contractor must clarily all documents to be clear, and Minimize the occurrence of added/less work.
FAKTOR SISA MATERIAL YANG MEMPENGARUHI BIAYA PADA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH Julsena Julsena; Abdullah Abdullah; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 4 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i4.12465

Abstract

The material has a large percentage of 50-70% of the total project cost. Good management can reduce the occurrence of excess material waste. The remaining material that has not been identified, will make the contractor does not know what percentage of losses caused by the remaining material in the project site. This study aims to identify the dominant factors causing the residual material, and to analyze the relationship and the influence of the remaining factors of material on the cost of building construction projects in Aceh Province. This study uses a mixed method, which combines qualitative and quantitative approaches through the distribution of questionnaires. Respondents addressed to the project manager of building contractor company with sub-field BG004 ranging from medium qualification (M1, M2), and large (B1). Based on the data of Construction Services Procurement Service (LPJK) in 2017 the number of contracting companies obtained as many as 215 companies, using Slovin formula then the research sample obtained as many as 68 companies. The sampling technique used is simple random sampling, randomly regardless of the strata present in the population. Of the 68 companies selected, construction costs range from Rp. 588,000,000 up to Rp. 30,251,965,000, with implementation period from 2010-2017. Data processing consists of validity, and reliability, while data analysis consists of descriptive analysis, simple correlation and multiple linear regression through Statistical Product and Service Solution (SPSS) version 22 software. The results show that the dominant remaining material factor that occurs during project implementation building construction in Aceh Province is a residual factor with a mean of 4.729. The design, procurement, handling and implementation factors have low correlation with Spearman coefficient of 0.260, 0.295, 0.373, and 0.296, while the residual factor has a very low correlation with Spearman coefficient of 0.130 to the cost of building construction projects in Aceh Province.
FAKTOR-FAKTOR RISIKO WAKTU YANG MEMPENGARUHI BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH Muhammad Taufik; Muttaqin Muttaqin; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 4 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i4.12466

Abstract

In the implementation of building construction projects in Aceh Province, faced with problems related to delays. The delay in the project has been a major contribution to the swelling of project costs. This study aims to identify the dominant time risk factors that occur during the implementation of building construction projects, as well as to analyze the relationship and influence between time risk factors to the cost of building construction projects in Aceh Province. This study uses qualitative methods through interviews and quantitative through the distribution of questionnaires. Resource persons and respondents addressed to the project manager of building contractor company with sub-field BG004 starting from qualification M1, M2, and B1. Based on the data of Construction Services Procurement Service (LPJK) Year 2017 the number of contractor companies obtained as many as 215 companies, using Slovin formula then the research sample obtained as many as 68 companies. The sampling technique used is purposive sampling. Data processing methods consist of validity test, and reliability, while data analysis consists of descriptive analysis, simple correlation and multiple linear regression through Statistical Product and Service Solution (SPSS) version 22 software. The results show that the dominant time risk factors that occur during implementation the building construction project in Aceh Province is a financial factor with a mean of 4.592. Equipment, environmental, labor, implementation, management, and political factors have a low correlation with Spearman coefficients of 0.224, 0.261, 0.274, 0.270, 0.366, and 0.228, while material, financial, criminal and project manager factors have a strong relationship low with Spearman coefficient of 0.199, 0.128, 0.042 and 0.148 to the cost of implementing the building construction project in Aceh Province. The effect of time risk factors on the cost of building construction projects in Aceh Province, which has significant effect is the material, equipment, finance, environment, labor, implementation, management, political, and project manager factors with tcount greater than ttable and significance value lower than 0.05.
ANALISIS FAKTOR-FAKTOR PENERAPAN PENGADAAN BARANG/JASA PEMERINTAH SECARA E-PROCUREMENT TERHADAP PENYERAPAN ANGGARAN DI KOTA SABANG Sawidar Sawidar; Muttaqin Muttaqin; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 1 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i1.10365

Abstract

Regulation of the President of the Republic of Indonesia Number 54 Year 2010 on Procurement of Government Goods/Services, has come to the fourth change, with the issuance of Presidential Regulation No. 4 of 2015. Sabang City Government has implemented this Presidential Regulation in fiscal year 2015 until now. If the procurement of goods/services runs well, it will increase the absorption of the budget. The purpose of this study is to identify the dominant variables applied in the procurement of electronic goods/services (e-procurement), as well as to analyze the relationship and influence of procurement factors of goods/services of government on e-procurement towards budget absorption in Procurement Unit ULP) Sabang City. The number of population in this study was 88 respondents. The results showed that the dominant variable applied in the procurement of goods/services of government by e-procurement is the access factor of information with the mean of 4.702. The quality factor of the system and accountability has a very weak relationship with Pearson coefficient of 0.001 and 0.191, transparency factor, market access and business competition, and procurement efficiency has a weak relationship with Pearson coefficient of 0.322, 0.226 and 0.201, while monitoring and auditing factors, and access to information has a moderate relationship with Pearson coefficient of 0.479 and 0.524 against budget absorption. The influence of government procurement/procurement factors on the budget absorption, which influences is the factor of transparency, accountability, and access factor of information with tcount greater than ttable and significance value lower than 0.05.
IDENTIFIKASI FAKTOR KINERJA KONTRAKTOR YANG PALING BERPENGARUH TERHADAP KEPUASAN STAKEHOLDERS DI DINAS CIPTA KARYA ACEH Mohammad R. Khadafi; Muttaqin Muttaqin; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 2, No 3 (2019): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v2i3.13464

Abstract

In the midst of increasingly fierce competition in the world of today's construction business, every construction company is required to be able to demonstrate the quality of its service so that it can excel in competition. As a company engaged in services/selling services, construction companies must have knowledge of the dimensions of service quality. There are five factors from the dimensions of service quality, namely tangible, reliability, responsiveness, assurance and empathy. If the performance can meet their expectations, the stakeholders will be satisfied and vice versa. This study aims to identify contractor performance factors that most influence stakeholder satisfaction in the Aceh Human Settlements Agency. This study used mixed methods, combining qualitative and quantitative approaches through questionnaires. The respondents are the stakeholders of the project stakeholders at Aceh Human Settlements Agency in 2016, which consists of the Budget User, Proxy of Budget User, Technical Officer (PPTK) and Technical Officer Assistant, which in total amounted to 32 respondents. Data processing methods use validity and reliability tests, while descriptive statistical analysis uses SPSS version 22 software. The results of the study showed that the contractor's performance factors that had the most influence on stakeholder satisfaction in the Aceh Human Settlements Agency were reliability factors with a mean value of 3.714, while the least influential factors were physical evidence factors with a mean value of 3.332
FAKTOR-FAKTOR PENERAPAN KESELAMATAN DAN KESEHATAN KERJA YANG MEMPENGARUHI KINERJA PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH Bunial Bunial; Muttaqin Muttaqin; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 4 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i4.12463

Abstract

PT. Jamsostek stated that in 2012 everyday there are 9 workers who died due to accidents, while total work accident in the same year recorded 103,000 cases. Accidents to these workers will certainly make the productivity of project work decreased, as well as will impact on the poor performance of the project. This study aims to identify the dominant OSH factors applied in the implementation of building construction projects in Aceh Province, and to analyze the relationship and influence between the factors of OSH implementation on the performance of building construction projects in Aceh Province. This study uses qualitative methods through interviews and quantitative through the distribution of questionnaires. The number of research samples obtained by 68 contractor companies. The sampling technique used is purposive sampling. Data processing methods consist of test validity, and reliability, while data analysis consists of descriptive analysis, simple correlation and multiple linear regression. The results showed that the dominant K3 factor applied in the implementation of the building construction project in Aceh Province was a public protection factor with a mean of 4.632. The safety and work competence factors have a good relationship with Spearman coefficient of 0.451 and 0.429, the factors of equipment and work clothes, vehicle lanes, and equipment and machinery have a low correlation with Spearman coefficient of 0.328, 0.386, and 0.243, while fire, and sound, public protection, general, occupational health, and seriousness of the company have a very low relation with Spearman coefficient of 0.077, 0.130, 0.066, 0.107, 0.121, and 0.169 to the performance of building construction projects in Aceh Province. The influence of OSH implementation factors on the performance of building construction project in Aceh Province, which has significant effect is safety factor, equipment and work clothes, vehicle path, equipment and machinery, public protection, general, seriousness of company, and worker competence with tcount greater than ttable and significance value lower than 0.05.