Claim Missing Document
Check
Articles

Found 16 Documents
Search

BACKORDER AND LOST SALES CONTINUOUS REVIEW RAW MATERIAL INVENTORY CONTROL SYSTEM WITH LEAD TIME AND ORDERING COST REDUCTION Tiena Gustina Amran; Dinar Suryo Lesmono
Jurnal Ilmiah Teknik Industri Vol. 11, No. 1, Juni 2012
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v11i1.983

Abstract

The purpose of this research is to suggest the optimal raw material inventory system alternatives synchronized with the stock out characteristics and the condition can be occurred, the backorder raw material inventory control, beside that it also can reduce lead time and raw material ordering cost. In this case, the inventory models also extent (Q, R) Inventory Model Under lead Time and Ordering Cost Reduction with lead time and ordering cost can be reduced. After the calculation, the optimal solution of inventory models can be obtained; those are with backorder condition which produced the annual inventory total cost for the company.
PERANCANGAN PERSEDIAAN MATERIAL DAN ADITIF PADA PRODUK INJEKSI PLASTIK Tiena Gustina Amran; Iveline AM; Robertus Robertus
Prosiding Seminar Nasional Pakar Prosiding Seminar Nasional Pakar 2018 Buku I
Publisher : Lembaga Penelitian Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/pakar.v0i0.2625

Abstract

Salah satu faktor kritikal bagi industri kecil menengah produk plastik adalahpengendalian persediaan bahan baku dan additif yang fluktuatif secarakontinu dan periodik. Pengendalian persediaan yang ekonomis dimulai dariketepatan peramalan dan mengklasifikasikan bahan baku aditif denganklasifikasi ABC. Pengendalian persediaan bahan baku dan aditif kategori Amasuk kepada sistem persediaan kontinu (Q System) dan kategori B dan Cmasuk sistem persediaan periodik (P System). Perhitungan ini untukmendapatkan biaya persediaan yang optimal dan di validasi dengan analisasensitivitas. Tujuan penelitian ini adalah merancang penerapan praktis bagiSME dari meramalkan bahan baku dan additive, pembagian klasifikasi ABCdan model persediaan P,Q System untuk menentukan biaya total inventoriminimum. Hasil menunjukkan model pengendalian model probabilistik Q,perusahaan dapat menghemat biaya persediaan 23.09% dan persediaan sistemP sebesar 22,25%. Analisa sensitivitas terhadap parameter jumlah permintaanbahan, lead time, harga pembelian sampai 90% adalah significance dan modeldapat digunakan oleh SME sejenis.
PERBAIKAN PROSES PRODUKSI SISTEM PENGEREMAN KENDARAAN BERMOTOR DENGAN METODE ECRS-BASED LINE BALANCING Tiena Gustina Amran; Novia Charina Wibowo
Prosiding Seminar Nasional Pakar Prosiding Seminar Nasional Pakar 2018 Buku I
Publisher : Lembaga Penelitian Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/pakar.v0i0.2686

Abstract

Hubungan pemasok OEM tier 1 dengan plan perakitan sangat erat berkaitandengan Quality, Delivery, Flexibility, Price dan Service. Permintaan pasarsemakin meningkat harus dipenuhi sesuai dengan kapasitas tersedia.Penelitian ini bertujuan untuk menyeimbangkan permintaan dan kapasitastersedia dengan memperhatikan tack time dari produkBody Caliper Tipe 2PH.Setelah diukur waktu baku proses operasi dan efisiensi, dilakukanpendekatan Eliminate, Combine, Rearrange, dan Simplify (ECRS) dan Based LineBalancing Concept diharapkan efisiensi lini proses produksi akan meningkat.Dilakukan 2 kali perbaikan hingga didapatkan efisiensi lini naik menjadi 95%dengan balance delay sebesar 5%, jumlah operator 8 orang dan gaji Rp.36.784.000/bulan. Usulan perbaikan penerapan metoda sederhana diperolehpeningkatan yang signifikan.
MODEL PERANCANGAN PERCEPATAN PEMASANGAN KETEL UAP STEAM 2500 kg/h MELIHAT DARI SISI RESIKO DENGAN HOUSE OF RISK (HOR) PROJECT PT. X Tiena Gustina Amran; Muhammad Junaedi
Prosiding Seminar Nasional Pakar Prosiding Seminar Nasional Pakar 2019 Buku I
Publisher : Lembaga Penelitian Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/pakar.v0i0.4226

Abstract

Proyek supplay dan pemasangan ketel uap steam 2500 kg/h memiliki 96 proses step yang di kerjakan  26 diantaranya proses yang memiliki tingkat resiko kerja yang tinggi,  Saat ini perusahaan masih kurang  peduli terhadap keselamatan dan kesehatan kerja terlihat di tahun 2017 terdapat 64 kejadian kecelakaan kerja dari hasil temuan tersebut maka di buatkan model strategy untuk meminimalisasi dampak yang mungkin terjadi. Dari hasil pengujian HOR 1 di dapatkan 10 resiko kerja (E1,E2,E3….,E10) dan 10 penyebab resiko (A1,A2,A3……,A10), dari data tersebut di  hitumh dan di cari nilai aggregate risk potential (ARP) serta di ranking dani nilai terbesar sampai nilai terkecil dari hasil terbesar ranking 1 dengan nilai 945  A6 sedangkan nilai terkecil dengan nilai356 A4  ranking 10. Sedangkan pada HOR 2 hasil perhitungan pada HOR 1 akan di gunakan untuk di carikan aksi mitigasi resiko di mana  di dapat  16 poin Proactive Action (PA) selanjut nya di hitung untuk mendapatkan nilai ETDk dengan hasil nilai tertinggi ETDk di rangking 1, PA14 “penggunaan alat pelindung diri” dengan nilai 4790 dan untuk ETDk terendah di ranking 16, PA9 “kebersihan ruang mesin harus di jaga” dengan nilai 914.
RANCANG BANGUN MODEL LEAN PRODUCTIVITY DENGAN PENDEKATAN OBJECTIVE MATRIX - VALUE STREAM MAPPING - ECRS (STUDI KASUS: PT. X) Muhammad Ichsan Fajrianto; Tiena Gustina Amran; Nora Azmi
JURNAL TEKNIK INDUSTRI Vol. 5 No. 3 (2015): Volume 5 No 3 Novemberi 2015
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (562.216 KB) | DOI: 10.25105/jti.v5i3.1521

Abstract

Original Equipment Manufacturers (OEM) merupakan model bisnis untuk menggunakanpihak ketiga sebagai subkontraktor atau pemasok bagian-bagian tertentu dalam rangka integrasiproduk akhir. Pemasok OEM platform dibagi beberapa tingkatan. Pemasok tingkatan 1 (tier 1) adalahpemasok yang terbesar, tier 1 memproduksi barang yang penting untuk perusahaan OEM. PerusahaanOEM 1st tier tidak terlepas dari waste yang ada di perusahaan itu sendiri. Studi kasus dilakukan padaperusahaan manufaktur OEM supplier tier 1 yang memproduksi brake untuk kendaraan roda 2 (twowheels). Besarnya kuantitas permintaan dari produsen sepeda motor (OEM) dan varian modelnya,serta masih terdapat loss genba (waste) di shop-floor, dan adanya cost reduction yearly dariperusahaan OEM. Maka, perlu dibuat sebuah model atau sistem untuk meningkatkan kinerjaperusahaan. Model yang dibuat berdasarkan prinsip lean yang bertujuan untuk mengurangi ataumenghilangkan waste pada proses manufaktur dengan tools Objective Matrix (OMAX), Value StreamMapping (VSM), Eliminate-Combine-Rearrange-Simplify (ECRS) dimana goal akhir adalahpeningkatan kinerja (produktivitas) perusahaan. Part yang dipilih untuk improvement adalah linemachining master cylinder 5P0, dengan nilai produktivitas dasar OMAX adalah 300. Dilakukananalisa dengan VSM sebagai visualisasi waste yang terdapat pada shop-floor saat ini. Diperoleh wasteyakni motion, over process dan waiting. Setelah dilakukan analisis waste yang ada, berikutnya adalahmelakukan perbaikan menggunakan pendekatan ECRS. Perbaikan dilakukan menggunakanpendekatan ECRS. Hasil yang diperoleh gap waktu standar sebelum dan sesudah adalah 8.29 detik(atau turun sebesar 17%). Perbaikan yang dilakukan adalah eliminate proses facing machining,combine tool burrytori, rearrange penempatan material, simplify penempatan air minum di line.ECRS menunjukkan hasil menaikkan nilai produktivitas di bulan berikutnya sebesar 432, 959, 334,770, 921, 959. Hasil lainnya adalah 4 bulan setelah aktivitas, line machining untuk kebutuhan mastercylinder 5P0 yang sebelumnya menggunakan 6 line direduksi menjadi 5 line (reduksi 1 line). Darihasil pengujian T-test terdapat perbedaan yang signifikan antara nilai produktivitas dasar terhadapnilai produktivitas setelah perbaikan.
RANCANG BANGUN MODEL PEMETAAN KECENDERUNGAN POTENSI KEWIRAUSAHAAN KE ARAH PENERAPAN TECHNOPRENEURSHIP (Studi Kasus: Program Studi Teknik Industri) Dita Mayasai; Tiena Gustina Amran; Dedy Sugiarto
JURNAL TEKNIK INDUSTRI Vol. 6 No. 1 (2016): Volume 6 No 1 Maret 2016
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (121.546 KB) | DOI: 10.25105/jti.v6i1.1527

Abstract

In the Educational environment, the relationship between knowledge and technologyaffecting the organization culture. In relation to Trisakti University Vision, which is becomingthe best Industrial Engineering program and becoming the center of development for IndustrialEngineering education with technopreneurship knowledge. Big effort needs to be done to changethe student’s mindset to be entreprenurial mindset. Efforts to be done by Industrial EngineeringDepartment to achieve the vision is with the Industrial Manufacture Design Practicum, MAIRATechnopreneurship Business Incubator (MTBI) that is created to collect products by studentsand to help students doing their business, and also help them market and operate their businesswith a business incubator. The research is trying to meassure the entrepreneurial quality of eachindividual and map the student’s entrepreneurial characteristic using the IndividualEntreprenurship Quality Quesionnaire. Mapping needed to see each new students and final yearstudent’s condition. After that, what is being done is doing differentiation test to see the effect ofthe learning activities being done if it is affecting the entrepreneurial characteristic withinstudents. After the characteristics being identified, which is significant and non significant, thedevelopment of strategies will be done after that to change the non significant characteristics tobe improved. The Methodology being used in the research is T-Test and SWOT strategic Model.
RANCANG BANGUN SISTEM INFORMASI ATM BERAS RASKIN DENGAN MENGGUNAKAN RADIO FREQUENCY IDENTIFICATION (RFID) Muhammad Hidayat Tullah; Tiena Gustina Amran; Dedy Sugiarto
JURNAL TEKNIK INDUSTRI Vol. 6 No. 2 (2016): Volume 6 No 2 Juli 2016
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (926.28 KB) | DOI: 10.25105/jti.v6i2.1541

Abstract

Indonesian Goverment launched rice program for poor households, called as ProgramBeras Miskin (RASKIN) with the aim to help poor families in the avaibility of rice. Raskinprogram is still raises problems so that the benefits received are not significant for poor families.The purpose of this study was to describe about distribution proccess of Raskin especially inBekasi City, mapping constraints experienced in the implementation of Raskin distribution andmake a design of Rice ATM information system for Raskin distribution in Bekasi City. Theresearch methodology used in this study began with observation of the research object to obtainpreliminary data in Raskin general guidlines, number of seeds of households needs and Raskinbeneficiary mapping in study area. Research result is a design of system information with RFIDimplementation to improve the effectiveness and the achievement of Raskin objectives program.Keywords: Raskin, RFID, System Information.
MODEL EVALUASI KINERJA VENDOR Tiena Gustina Amran; Triwulandari SD; Oktabrianto Prasyudi
JURNAL TEKNIK INDUSTRI Vol. 4 No. 2 (2014): Volume 4 No 2 Juli 2014
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1285.718 KB) | DOI: 10.25105/jti.v4i2.1550

Abstract

Dalam melakukan proses produksi, PT. XYZ bekerja sama dengan banyak vendor untukmembuat part – part, karena perusahaan tidak memiliki teknologi pembuatan part tersebut.Dengan tujuan untuk minimasi cost dan kontrol kualitas yang lebih mudah. Saat ini jumlah partyang di supply oleh vendor kurang lebih sebanyak 9000 nomor part yang berasal dari 210 vendor.Karena jaminan kualitas menggunakan sistem sampling, tidak mungkin memastikan semuadelivery vendor tepat waktu, dan proses seleksi vendor hanya berdasarkan harga. Maka perludilakukan evaluasi dan perbaikan terhadap kinerja vendor. Tujuan penelitian ini adalah untukmembuat : model penilaian evaluasi kinerja vendor, model audit evaluasi vendor, dan modelkontrol perbaikan hasil audit dengan statistical process control (SPC). Penelitian ini menghasilkanmodel penilaian evaluasi kinerja dengan 3 kriteria utama quality, delivery, dan service, sertamodel ini juga merekomendasikan jenis audit yang perlu dilakukan. Model audit evaluasi vendordibagi menjadi 3 jenis sesuai dengan kriteria penilaian, dengan tujuan proses audit menjadi lebihdetail dan mempersingkat waktu audit. Model kontrol perbaikan hasil dengan SPC memberikaninformasi pada auditor mengenai hasil perbaikan sudah dijalankan dengan baik dan berjalanstabil atau tidak.
USULAN PERAWATAN MESIN SECARA PREVENTIF DENGAN PENDEKATAN MODULARISASI DESAIN PADA PT. BAI Amal Witonohadi; Tiena Gustina Amran; Niken Herawati
JURNAL TEKNIK INDUSTRI Vol. 3 No. 1 (2013): Volume 3 No 1 Maret 2013
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (160.701 KB) | DOI: 10.25105/jti.v3i1.1581

Abstract

PT. BAI produce polymer filter system components, such as the spin pack, candle filters, leafdiscs, gaskets and so forth. Problems that occur in the form of decreased reliability of machinedowntime resulting in large engine stalled, causing the production process, the company should havea preventive maintenance schedule in accordance with the conditions of machines on the productionfloor to reduce machine downtime by using modularity design method approach to reducemaintenance costs. Level of maintenance reliability measured using Overall Equipment Effectiveness(OEE), whereas treatment schedule used to obtain parameter Mean Time to Failure (MTTF) andMean Time to Repair (MTTR). Maintenance cost calculator is then performed with correctivemaintenance, preventive maintenance and preventive maintenance with design modularity. By usingmodularity design companies can combine several components into a module to do the replacementcomponents simultaneously causing maintenance costs to be as much as 29.1% less than the companydoing the corrective maintenance activities.
RANCANG BANGUN MODEL PERSEDIAAN DAN PEMILIHAN PEMASOK BAHAN BAKU KELAPA PARUT KERING DI PT. X Siti Wardah; Tiena Gustina Amran; Parwadi Moengin
JURNAL TEKNIK INDUSTRI Vol. 3 No. 1 (2013): Volume 3 No 1 Maret 2013
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (426.172 KB) | DOI: 10.25105/jti.v3i1.1583

Abstract

PT. X is an integrated agro-industry coconut company. The main products produced aredesicated coconut from coconut grain with a shelf life of 7 days as raw materials. The companycurrently constrained in 30-40% expired stock at the warehouse and insufficient capacity of thewarehouse. Another problem is the supply of raw materials (desicated coconut) from suppliersaround 20-35% did not comply with the specifications of diameter ≥ 10 cm. Seeing these conditionsrequired the model design of inventory and supplier selection with a balance of shelf life andstorage capacity as well as alternative suppliers that capable to provide raw materials (desicatedcoconut) with a diameter ≥ 10 cm continually. The method used in the design of this model is thedevelopment of methods Economic Order Quantity (EOQP) and lagrange multiplier used for theeconomic lot size ordering and fulfillment warehouse storage capacity as well as methodsAnalitycal Hierarchy Process (AHP) for the selection of alternative suppliers that meet thespecifications of raw materials and economical ordering quantity lots. The results of the design ofthis model produced economically ordering lot size 300.000 coconuts with total inventory cost Rp.55,5 million and is the District 1 alternative suppliers. In accordance with the results of analysisand expert opinion that the study design was verified and valid models.