Claim Missing Document
Check
Articles

Found 22 Documents
Search

Analysis of the Effect of Fly Ash Waste Utilization as the Main Material in Polymer Brick Production on Mechanical and Physical Properties Rajiman Rajiman; Dwiki Faiz Nugroho
Jurnal Media Computer Science Vol 5 No 2 (2026): April
Publisher : LPPJPHKI Universitas Dehasen Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37676/jmcs.v5i2.11186

Abstract

This study examines the effect of utilizing fly ash waste as the main raw material in the production of polymer bricks on the mechanical and physical properties of the resulting material. This research employed an experimental laboratory method by producing fly ash-based polymer brick specimens activated using alkaline solutions of NaOH and Na₂SiO₃. The curing temperatures applied in this study were 70°C, 80°C, and 90°C. The tests conducted included compressive strength tests and water absorption tests. The results showed that the utilization of fly ash as the primary material significantly influences the increase in compressive strength of polymer bricks. The highest compressive strength value was obtained at higher curing temperatures, indicating that an increase in curing temperature accelerates the geopolymerization process and produces a denser and stronger material structure. In addition, the water absorption test results indicated that the polymer bricks have relatively low water absorption values, which reflects low porosity and good material quality. Therefore, fly ash-based polymer bricks have strong potential as an environmentally friendly alternative building material, energy-efficient, and possessing good mechanical performance, making them a sustainable solution for industrial waste utilization
ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN GEDUNG MENGGUNAKAN METODE BOW TIE ANALYSIS (STUDI KASUS: PROYEK PEMBANGUNAN HOTEL AZANA BANDAR LAMPUNG): ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN GEDUNG MENGGUNAKAN METODE BOW TIE ANALYSIS Fajri Dharmais; Anggarani Budi Ribowo; Rajiman; Putri Ayu Dwiyana
STATIKA: Jurnal Teknik Sipil Vol. 11 No. 1 (2025): Statika: Jurnal Teknik Sipil
Publisher : Politeknik Raflesia Press

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Proyek pembangunan Hotel Azana Bandar Lampung merupakan proyek gedung berlantai 11 yang memiliki potensi risiko kecelakaan kerja tinggi. Identifikasi risiko dilakukan terhadap beberapa faktor, seperti kurang fokusnya pekerja, penggunaan alat berat, area proyek yang tidak bersih, dan rendahnya kesadaran penggunaan Alat Pelindung Diri (APD). Tujuan penelitian ini adalah untuk menganalisis risiko kecelakaan melalui identifikasi risiko, survei lapangan, penilaian tingkat kecelakaan (likelihood index dan severity index), serta penentuan peringkat risiko. Metode penelitian yang digunakan adalah kualitatif. Hasil penelitian menunjukkan bahwa risiko paling dominan adalah pekerja terjatuh dari ketinggian dengan likelihood index 21% dan severity index 64%, serta putusnya sling crane dengan likelihood index 7% dan severity index 61%. Analisis risiko menggunakan diagram Bow Tie mengungkap bahwa risiko pekerja terjatuh disebabkan oleh kecerobohan pekerja, tidak adanya alat pengaman, fasilitas yang tidak memadai, dan kebersihan lokasi yang buruk, dengan konsekuensi berupa luka ringan, luka berat, atau kematian. Sementara itu, risiko putusnya sling crane dipicu oleh usia alat yang sudah tua, kondisi sling tidak aman, kelebihan beban, cuaca ekstrem, kurang fokusnya operator, dan tidak adanya rambu pengaman, yang berakibat pada luka berat, kematian, atau kerusakan alat berat. Kontrol peristiwa dan faktor eskalasi juga dianalisis untuk memitigasi risiko yang mungkin terjadi.