STUDI PROTEKSI DOUBLE BUSBAR AKIBAT PENAMBAHAN TRANSFORMATOR DI GARDU INDUK PEMECUTAN KELOD I Kadek Rogan Bayu Candra Dwipa; I Gede Dyana Arjana; Cok Gede Indra Partha
Jurnal SPEKTRUM Vol 6 No 4 (2019): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (226.988 KB) | DOI: 10.24843/SPEKTRUM.2019.v06.i04.p16

Abstract

Pemecutan Kelod Substation operated with four conductors, three transformers, one capacitor and one coupling with double busbar configuration, side by side with the Kapal and Pesanggaran substation to maintain electricity supply in Kuta, Legian, Seminyak, Denpasar City and surrounding areas. Due to increase in load in Denpasar area, PT PLN (Persero) Trans-JBJT added one transformer to improve the reliability of electricity in this substation, so Pemecutan Kelod substation operated with four transformers. To optimize the continuity of the power flow, it is necessary to analyse the relay settings on the busbar current and the appropriate protection settings as a protection system reference. In this study, the calculation of resistor stability (Rstab) of input current and output current after and before the addition of the transformer is carried out. The results of the calculation of resistor stability (Rstab) before the addition of the transformer is obtained with a total of 5.12 ?, the input current is 1030 A and the output current is 1010 A with losses of 1.9%. While the results of the calculation of resistor stability (Rstab) after the addition of the transformer is obtained with a total of 5.64 ?, the input current is 1070 A and the output current is 1060 A with losses of 0.9%. Those losses values complied with the SPLN No.1: 1987 standard for the 150 kV system.
ANALISIS SETTING PENGAMAN TRANSFORMATOR DAYA DI GARDU INDUK NUSA DUA JIKA TERJADI GANGGUAN HUBUNG SINGKAT SATU PHASA TANAH I Gusti Agung Putra Sanjaya; I Gede Dyana Arjana; I Wayan Rinas
Jurnal SPEKTRUM Vol 4 No 1 (2017): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (197.28 KB) | DOI: 10.24843/SPEKTRUM.2017.v04.i01.p05

Abstract

Relai REF (Restricted Earth Fault) digunakan sebagai peralatan pengaman dari gangguanhubung singkat satu phasa ke tanah, agar arus gangguan tidak mengalir ke titik netral trafo saatputusnya kawat NGR (Neutral Ground Resistor). Arus hubung singkat satu phasa ke tanahsebelum putusnya Pengawatan NGR sebesar 288,67 Ampere, sedangkan arus hubung singkatsesudah putusnya Pengawatan NGR sebesar 884,15 Ampere. Hasil analisis pemasangan relaiREF pada trafo 60 MVA terhadap gangguan hubung singkat satu phasa ke tanah saat putusyapengawatan NGR mempunyai kemampuan proteksi yang baik berdasarkan dari perhitungansimulasi gangguan saat putusnya Pengawatan pentanahan NGR, dengan arus hubung singkatsebesar 884,15 Ampere, maka besar arus yang mengalir pada relai REF sebesar 0,263Ampere, sedangkan relai REF di setting pada 0,233 Ampere, maka dapat di pastikan relai REFsudah bekerja, karena waktu kerja relai REF adalah 0 detik atau tanpa waktu tunda.
PROTOTYPE PENGENDALIAN DAYA LISTRIK AC DAN LAMPU DENGAN ANALISIS STANDAR KENYAMANAN RUANGAN BERBASIS ATMEGA 2560 Made Dwi Krisna Putra Sudiharta; I Gede Dyana Arjana; Cok Gede Indra Partha
Jurnal SPEKTRUM Vol 5 No 2 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (414.827 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i02.p33

Abstract

The use of air conditioners (AC) and lighting that do not suit the needs and excessive results in a lack of comfort and high use of electrical energy. Ultrasonic Sensor of SRF-04 functions to find out the number of people in the room, temperature sensor of DHT 22 functions to calculate the temperature and humidity inside and outside the room, Light Intensity sensor of GY-302 functions to read the level of light intensity in the room and micro controller of Arduino Mega 2560 functions to process all input sensors become the command for operating the AC units and lights. The AC and lighting control system working well and can determine the time and number of AC and light that is needed. Those are based by Indonesian room comfort standards so that it can increase the comfort of the room in terms of cooling systems and room lighting with a temperature of 22oC to 25 oC and light intensity of 300 lux.
ANALISIS PENGARUH CUACA TERHADAP PERUBAHAN PEMBEBANAN LISTRIK PADA PT. PLN (PERSERO) RAYON DENPASAR I Made Adi Purwa Adnyana; Gede Dyana Arjana; I Wayan Arta Wijaya
Jurnal SPEKTRUM Vol 7 No 1 (2020): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (228.429 KB) | DOI: 10.24843/SPEKTRUM.2020.v07.i01.p25

Abstract

The research aims to determine the effect of air temperature, wind speed and rainfall on changes in electrical loading. The object in this research is PT. PLN (Persero) Rayon Denpasar. Software used Untulk analyze multiple linear regression models using SPSS software. The results of the analysis showed 10.4% of the electrical burden affected by temperature variables. Then on the rainfall Model 3% electric load is affected by the rainfall variables and on the wind speed model of 2.3% The electrical load is affected by the variable wind speed. A simultaneous 15.8% of the electrical load is influenced by variable temperature, rainfall and wind speeds. The remaining 84.2% is influenced by other causes outside the model.
SETTING RELE JARAK PADA SISTEM SUTT 150 KV GI KAPAL – GI PADANG SAMBIAN MENGGUNAKAN METODE ADAPTIVE NEURO-FUZZY INFERENCE SYSTEM (ANFIS) M. Nordiansyah; I.G.D Arjana; W. Setiawan
Jurnal SPEKTRUM Vol 1 No 1 (2014): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1769.758 KB)

Abstract

Sistem proteksi pada saluran transmisi mempunyai peranan yang sangat penting untuk mengamankan saluran transmisi dari gangguan yang terjadi, salah satu jenis pengaman utama yang digunakan adalah rele jarak. Berbagai metode dapat digunakan untuk mendapatkan nilai setting rele jarak, salah satunya adalah dengan metode ANFIS. Metode ANFIS digunakan untuk mendapatkan nilai setting rele jarak pada sistem SUTT 150 kV GI Kapal - GI Padang Sambian. Struktur ANFIS yang dilatih menggunakan model ANFIS Takagi-Sugeno, dengan 3 jenis fungsi keanggotaan, serta dengan 2 dan 3 fuzzy set untuk masing-masing jenis fungsi keanggotaan. Pemodelan pasangan data masukan-keluaran yang digunakan adalah pemodelan dengan masukan 1 data pelatihan, dan masukan 3 data pelatihan untuk 1 data target. Berdasarkan simulasi peramalan nilai setting rele jarak yang dilakukan, menghasilkan MAPE peramalan ANFIS untuk masukan 1 data pelatihan sebesar 5,671 %, sedangkan nilai MAPE yang dihasilkan dari masukan 3 data pelatihan dengan 1 data target menghasilkan nilai MAPE sebesar 0,377 %.
KONSERVASI ENERGI PADA GEDUNG KANTOR SEKRETARIAT DAERAH KOTA DENPASAR Gde Wikan Pradnya Dana; I Gede Dyana Arjana; Cok Gede Indra Partha
Jurnal SPEKTRUM Vol 7 No 2 (2020): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (302.357 KB) | DOI: 10.24843/SPEKTRUM.2020.v07.i02.p10

Abstract

Regional Secretariat Building Denpasar in 2017 experienced a separation in two parts.The separation resulted in the empty room, even though are empty room turned out toconsumption building power in 2018 continued to experience enchancement. The study hasbeen done there is the room that has the intensity of energy consumption which do not comptywith SNI. Solutions that can be given is to replace the type of split standard air conditioner (AC)into a type of low watt air conditioner (AC). Replacement type split standard air conditioner (AC)1,5 PK became type of low watt air conditioner (AC) 1,5 PK can make saving of up 11,62 % orRp 21.068.468,00. Saving electric energy consumption on lighting system can be done byinstalling an automatic switch with time or by using an a light sensor system.
STUDI KOORDINASI KERJA RELAI JARAK SEBAGAI PENGAMAN CADANGAN PADA SALURAN 150 KV GIS PESANGGARAN-GI NUSA DUA Deoka Gusti; I Gede Dyana Arjana; Cokorde Gede Indra Partha
Jurnal SPEKTRUM Vol 8 No 2 (2021): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (499.723 KB) | DOI: 10.24843/SPEKTRUM.2021.v08.i02.p14

Abstract

The development of Pesanggaran Conventional Substation into the Pesanggaran GasInsulated Switchgear (GIS) as a form of increasing the reliability of the electric power system inBali which led to changes in the protection system configuration on the transmission lineconnecting the GIS Pesanggaran and Nusa Dua Substation. The distance relay that waspreviously functioning as a primary protection was changed to backup protection due to the lackof selectivity of the distance relay in isolate the disruption and as the backup protection if themain protection experiencing a failure. Simulation testing using power system analysis softwareafter determining the value of the distance relay setting and tested with short circuit at 110%and 180% of the transmission line length shows the distance relay has worked according to theP3B JB regulation No. 211/151/P3B/2010 and distance relay can detect disruption in zone 2with a delay time of 0,815 seconds and detect disruption in zone 3 with a delay time of 1,615seconds.
ANALISIS KECEPATAN KERJA SACO SAAT MANUVER BEBAN DI BANDARA NGURAH RAI MENGGUNAKAN ARTIFICIAL NEURAL NETWORK Dewa Ngakan Made Barel; I Gede Dyana Arjana; Widyadi Setiawan
Jurnal SPEKTRUM Vol 4 No 1 (2017): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (194.817 KB) | DOI: 10.24843/SPEKTRUM.2017.v04.i01.p02

Abstract

Bandara Ngurah Rai memiliki beban daya sebesar 10.380 kVA, disuplai oleh duapenyulang yakni penyulang Gayatri dan peyulang Bandara. Penyulang Gayatri sebagaipenyulang utama dan penyulang Bandara sebagai penyulang cadangan. Penggunaan duapenyulang ini bertujuan untuk mengatasi gangguan pada jaringan, dikarenakan sensitifitasperalatan listrik di bandara yang tinggi. Namun apabila terjadi gangguan pada penyulangGayatri maka suplai beban secara otomatis akan dipindahkan ke penyulang Bandaramenggunakan sakelar otomatis bernama Switching Automatic Change Over (SACO). Tingkatsensitifitas peralatan listrik Bandara Ngurah Rai yang tinggi mengijinkan batas jatuh teganganmaksimum adalah 0,5 kV dari nilai tegangan nominal penyulang, dari permasalahan tersebutmaka dilakukan analisis perhitungan jatuh tegangan dan hubung singkat pada penyulangGayatri. Analisis ini menggunakan program Artificial Neural Network (ANN). Parameter yangdigunakan antara lain jumlah iterasi yaitu 60000 epoch, kecepatan pembelajaran 0,3 danhidden layer sebanyak 40 hidden layer, dimana nilai target pengujiannya adalah 0,00001.Proses pelatihan dan pengujian yang telah dilakukan menghasilkan nilai jatuh tegangan padatitik 100% (ujung penyulang) adalah 274,7 volt dengan nilai Mean Squarred Error (MSE) yaitu45,5. Nilai waktu tunda rele tercepat yaitu 0,3 detik pada titik gangguan 5%, dan nilai MSEdengan hasil terbaik adalah 0,00032 untuk gangguan 1 fasa ke tanah.
Rekonfigurasi Saluran Distribusi 20 kV Untuk Mengurangi Rugi-Rugi Daya dan Jatuh Tegangan Pada Penyulang Abang I Putu Arya Suardika; I Gede Dyana Arjana; Anak Agung Gede Maharta Pemayun
Jurnal SPEKTRUM Vol 5 No 2 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (451.527 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i02.p29

Abstract

The feeder of Abang is one of forty-one feeders in State Electrical Company (PT PLN) of east Bali Area. This feeder uses a configuration of radial type that serves consumers in the area of Padangkerta, Bias, Batannyuh, Kikian, Ababi, Datah, Kubu, Nusu, Tianyar and Ban. It has a line transect that is 212,8 kms in leght with a total of distribution subtatations of 167 transformers and its peaks load reaches 5669 kW. This conditions results in drop voltage of 16,255% and and power losses of 10,12%. Feeder reconfiguration is accomplished by two ways: the cutting of the network that is diverted to Subagan feeder and the planning of Kubu feeder. Reconfiguration by using a method of cutting the network shows a voltage correction of Abang feeder with the initial drop voltage of 16,255% to 3.05% and the initial power losses of 10,12% to 3,49%. The improvement of voltage and power losses occurring in this feeder is not followed by Subagan feeder, which experienced an initial rise in the percentage of drops voltage of 6,78% to 27,615% and its initial power losses of 3,89% to 13,28%. While reconfiguration with Kubu's feeder planning is able to repair the drop voltage of Abang feeder to 2.94% and its power losses to 3,41%. Meanwhile, Kubu’s feeder in accordance with the results of running the program ETAP that the value of drop voltage is 2,95% and power losses is 2,73%.
STUDI PENGARUH UPRATING SALURAN TRANSMISI TEGANGAN TINGGI 150 kV TERHADAP SETTING RELE JARAK ANTARA GI KAPAL – GI PADANG SAMBIAN – GI PESANGGARAN S.K. Supriana; I.G. Dyana Arjana; A.A.N. Amrita
Jurnal SPEKTRUM Vol 1 No 1 (2014): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (338.65 KB)

Abstract

Uprating saluran transmisi pada penelitian ini merupakan pembesaran penampang yang sebelumnya ACSR 240 mm2 menjadi ACCC Lisbon 300 mm2. Adanya uprating saluran transmisi menyebabkan perubahan nilai impedansi. Penelitian ini bertujuan untuk mendapatkan nilai setting rele jarak yang sesuai dengan impedansi zone reach setelah dilakukan uprating SUTT 150 kV. Hasil perhitungan diperoleh nilai setting rele jarak setelah dilakukan uprating yaitu zone pengaman Kapal – Padang Sambian nilai setting rele jaraknya sebesar zone 1 : 1,428 ? (122%), zone 2 : 2,240 ? (197%), zone 3 : 3,640 ? (361%), dan zone 3 reverse : 0,385 ?. Zone pengaman Padang Sambian – Pesanggaran nilainya zone 1 : 1,040 ? (133), zone 2 : 3,300 ? (142%), zone 3 : 6,160 ? (259%), dan zone 3 reverse : 0,302 ?.
Co-Authors A A Gd Maharta Pemayun A. A. Gde Agung Semarabawa A. I. Weking A.A Ngurah Amrita A.S. Murti Ahmad Fauzi Alfian Hadianto Anak Agung Gede Maharta Pemayun Anak Agung Ngurah Wanda Ariesta Antonius Ibi Weking Arya Surya Darma bagus widyananda yoga Bhrama Sakti K.P. Cok Gede Indra Parta Deoka Gusti Dewa Gede Uki Atmaja Dewa Made Rian Sanjaya Dewa Ngakan Made Barel Dewa Putu Yudha Prawira Diky Wahyu Kusuma Budi F. Iskandar Fajar Rizky Kurniawan G. A. P. Yuni Maheswari Galih Budi Santosa Ganggas B Maulana Idham Gede Teguh Pradnyana Yoga Hery Samudra I Dewa Gde Agung Budhi Udiana I Gede Gerry Julius Perdana I Gede Krisnayoga Kusuma I Gede Riana I Gede Wiyoga Putra I Gusti Agung Putra Sanjaya I Gusti Ngurah Kade Suwiherawan I Gusti Nyoman Indra Wiguna I K. Windu Iswara I Kadek Agus Yodha Bhaskara I Kadek Dodik Darma Putra I Kadek Rogan Bayu Candra Dwipa I Ketut Ariek Astana Adi I Komang Anom Astana Ady I Made Adi Purwa Adnyana I Made Deny Setiawan I Made Dian Purnawan I Made Dwi Cahyadi Jaya I Made Mataram I Made Suartika I N Satya Kumara I Nyoman Budiastra I Nyoman Julyantara I Nyoman Setiawan I Nyoman Sutarja I Nyoman Tri Juliarta I Nyoman Upanayana I Nyoman Wardana I Putu Adi Sumastra I Putu Agus Kumara Putra I Putu Arya Suardika I Putu Dimas Darma Laksana I Putu Gede Aras Widya Pratama I Putu Weda Jayanthana I W Rinas I Wayan Agus Teja Baskara I Wayan Alit Wigunawan I Wayan Arta Wijaya I Wayan Artha Wijaya I Wayan Rinas I Wayan Sastrawan I Wayan Sukerayasa I Wayan Swi Putra I Wayan Yoga Prasetya I. N. Partawan I.B.G. Manuaba Ian Rahmadi Kurniawan Ida Bagus A. Swamardika Indra Partha Ketut Mira Ardianti Komang Dody Pramudya Indra Jaya l Gusti Ngurah Janardana M. N. Hanifan M. Nordiansyah Made Ananta Pradnya Made Dwi Krisna Putra Sudiharta Made Niken Ayu Larasati Danianto Maharta Pemayun Nur Ayu Puspita Indra Pratiwi Nyoman Ananda Tri Utami Putu Agus Satriya Guna Adnyana Putu Arya Mertasana Rizal Akbar Fauzany Rukmi Sari Hartati S.K. Supriana Tjok Gede Indra Partha Tjok. Gede Indra P W. Arta Wijaya W. Setiawan Widyadi Setiawan Wikan Pradnya Dana, Gde yoga armika