Analysis of the Causes of Delays in Construction Projects at the XYZ Resort Bali Project Ikhsan Setiawan; Rooslan Edy Santosa; Fredy Kurniawan; Nyoman Agus Sandika Purnaman
Journal of World Conference (JWC) Vol. 3 No. 4 (2021): July 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A construction project is a series of interrelated activities to achieve certain objectives (building or construction) within a certain time, cost and quality limitation. Delay in a project is a situation where the project cannot be completed within the planned time. The construction project at the XYZ Resort Bali project, in construction, occurred delays due to disputes. The disputes are caused by several factors between stakeholders, where each stakeholder has various and different problems. The purpose of this study is to identify and analyze the causative factors that contribute to delays in construction projects at the XYZ Resort Bali Project and provide suggestions or determine mitigation measures to overcome them. The method used is a quantitative approach in the form of literature studies, data collection through surveys, data analysis and conclusions. The survey questionnaire was designed based on the factors identified from previous research by determining as many as 6 aspects of the study with 45 types of causes or factors that contributed to project delays. Data analysis was carried out quantitatively descriptive of the delay factor variables from the questionnaire results. The questionnaire data was tested for validity and reliability, then analyzed using the fishbone diagram approach and the House of Risk method to determine the main factors that contribute to project delays and determine mitigation measures to overcome delays in project completion.
Value Engineering Construction Of The Unisa Campus Saintek Building 2 Ramadhana Sangyang Ady; Fredy Kurniawan; Diah Ayu Restuti Wulandari
Journal of World Conference (JWC) Vol. 3 No. 5 (2021): September 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This Value Engineering analysis is carried out to analyze or organize a construction of the SAINTEK UINSA 2 building which aims to produce appropriate quality that does not change the function and also there are no unnecessary costs considering that the construction of this building has a building area of ??40 x 19 = 760 m2 which cost Rp. 37,108.056,260.81. In this analysis, an analysis is carried out or to identify the function of a product or service that aims to fulfill the required function at the lowest price by providing an alternative from the creative ideas obtained to give to the owner so that there is no need for an increase in costs. From the VE analysis on the construction of the SAINTEK UINSA 2 building, the total initial cost savings on the slab work were initially Rp. 624,429,524.15 and after applying Value Engineering analysis using alternative 2, the cost is Rp. 527,876,352.19 which is more economical worth Rp. 96,553,171.96 or 15.46% of the initial price. On the 1st floor work (1st floor ) EL. -0.05 in which there is a formwork slab which is considered to have a high cost, which initially used nails and wooden blocks, which was changed to 50.50 hollow iron and bendrat wire.
Construction Safety Planning Method Based on Project Loan ( Lot 8 Jarit-Puger Road Project Case Study) Galuh Tiara Dewi; Fredy Kurniawan
Journal of World Conference (JWC) Vol. 4 No. 1 (2022): Januari 2022
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The development of infrastructure in Indonesia has increased with the implementation of national strategic projects. With the increasing growth of infrastructure development in Indonesia and the increasing number of work-related accidents on the site. Accidents at work occur because of the lack of attention to implementation and monitoring. The success of the project is not measured merely in terms of performance, but in the application of occupational safety and health to a project and becomes one of the benchmarks for success. To control the implementation of Occupational Safety and Health in the project, a Construction Safety Plan is required, while compiled in the Construction Safety Plan document included in the Construction Safety Management System document. The research methodology used data collected in the field. Collect data from implementation case studies and comparisons related to construction safety planning documents against applicable regulations through field observations using documentation, questionnaires, observations and documentation methodology. Based on the analytical results conducted in this study, there are five elements to prepare the construction safety plan documents. Reduce the number of work-related accidents by planning, monitoring, and evaluating work-related accidents. There is an expectation that further analysis of the factors that cause work accidents by adding research objects to reduce work accidents in construction projects. For the analysis, the authors hope that the causes of industrial accidents will be more detailed by adding research topics to reduce accidents in construction projects.
Co-Authors ., Syukrianto ., Umarudin Abdullah Aman Damai Adi Prawito Adi Soeprijanto Alvin Juniawan Anang Maryanto Anggriawan, Wahyu Ari Nugroho Arif Rachmat, Arif Arynta Dharmayanti, Arynta Atik Rohmana Maftuhatul Fuad Baginda Zulkarnain Bagus, Muhammad Bahrul Ulum Dennis Farina Nury Diah Ayu Restuti Wulandari Diah Susanti Dipta Nusbangga, Dipta Djarot Sugiarso Endang Tri Wahyuni Endang Tri Wahyuni Erna Rochana Estu Yoga Elmi Gesa Febri Hadi Fitriyana Fitriyana Fransisca Bangun, Yulia Frizka Vietanti Fuji Ridha, Fuji Galuh Tiara Dewi HANGGARA, ANGGY YOGA Hariyati Purwaningsih Harmami Harmami Harus Laksana Guntur Hatta, Agus Muhamad Hendro Juwono Hendro Juwono Hendro Sutowijoyo Ika Puspita, Ika Ikhsan Setiawan Imam Abadi Isa, Illyas Md Ismail Azizi Ita Ulfin Julistyana Tistogondo Karlinda Karlinda Kartika A. Madurani Kaskoyo, Hari Koespiadi Kolo, Maria Magdalena Lia Marisca Permatasari Lourentia Candle Lutfi Andre Yahya Madurani, Kartika Anoraga Mahendra Wardhana, Mahendra Mega Vania Misbah Misbah Mochammad Zaki Nasrulloh Mohammad Teguh Hermanto Muhammad Alwi Syahara, Muhammad Alwi Muhammad Rivai NUR EFENDI Nyoman Agus Sandika Purnaman Pemal Kabogi Praditya Bagaskara Qonitah Fardiyah Rahadian Zainul Rahmi Rahmi Ramadhana Sangyang Ady Regina Tutik Padmaningrum Rika Wijiyanti, Rika Romadhona, Syahrur Rooslan Edy Santosa Sayyida Sayyida Sekartedjo Koentjoro, Sekartedjo Selvi Marcellia Setyadi Laksono Bahar Silvya Anggraini Sri Wiwoho Mudjanarko, Sri Wiwoho Suharmanto, Edi Sunarto Sunarto Suprapto Suprapto Suprapto, Suprapto Sutarno Sutarno Sutarno Sutarno Suyanta Suyanta Syahputra, Muhammad Yudha Syukrianto, Syukrianto Taslim Ersam Tri Paus Hasiholan Hutapea, Tri Paus Hasiholan Tri Widjaja Triyono Triyono Triyono Triyono Umarudin, Umarudin Vietanti, Frizka Wahyu Anggriawan Yunita Triana Yunita Triana Zulkarnain Zulkarnain