Found 2 Documents
Search
Journal : Rekayasa Sipil

PERENCANAAN ULANG ANGGARAN BIAYA DAN WAKTU PELAKSANAAN GEDUNG PERKULIAHAN DENGAN MENGGUNAKAN METODE BIM Rizky Ilham Mardhani; Anik Ratnaningsih; Syamsul Arifin
Rekayasa Sipil Vol. 16 No. 2 (2022): Rekayasa Sipil Vol.16. No.2
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2022.016.02.3

Abstract

The speed of completing all stages of the project will cause major complications in the construction management system. The BIM method can integrate all projects that can save costs and time so that it is effective and makes it easier to coordinate in order to streamline the project. The purpose of this study is the planning of a 7-story economic and business building at the University of Jember using BIM application and steps to mmodel the building using a cost and time budget. In this research, the stages in structure modeling using BIM aids, the results, the results of reinforcement modeling and the required budget plan are Rp. 9,400.450.878.04 the time required is 189 days or 6 months 9 days.
EVALUATION OF FLEXIBLE PAVEMENT DAMAGE USING THE PCI (PAVEMENT CONDITION INDEX) METHOD BASED ON CORE DRILL DATA. “CASE STUDY: ON THE MANDARIN ROAD TO THE PRESIDENT NICOLAO LOBATO ROUNDABOUT AND THE BEBONUK ROAD IN DILI CITY, TIMOR-LESTE” Brigida Abreu Freitas de Almeida; Krisnamurti Krisnamurti; Akhmad Hasanuddin; Anik Ratnaningsih
Rekayasa Sipil Vol. 16 No. 3 (2022): Rekayasa Sipil Vol.16. No.3
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2022.016.03.10

Abstract

Localization and characterization of road damage are used in an effort to accelerate road repairs. The evaluation results were compared with field data and laboratory data. The results of the analysis show that the average PCI on the right side of the road reaches a value of 68 with a good rating good, on the left side it is worth 62 with a good rating good, and for the Bebonuk road section it is worth 39 with a bad rating poor. The average value of core drill is 86.85% and 99.92%, while the average PCI value is 35.36%. Asphalt content extracted with specifications 0.3, JMF 5.4% and penetration of 5.1%.