Claim Missing Document
Check
Articles

Found 5 Documents
Search
Journal : JURNAL REKAYASA SISTEM INDUSTRI

PENGARUH PENERAPAN ISO 9001:2008 TERHADAP PENINGKATAN KINERJA KERJA KARYAWAN PT. SOFTEX INDONESIA Ade Irpan Sabilah; Hernadewita Hernadewita; Sadiq Ardo Wibowo; Yan Mahesa Damanik; Elva Susanti
JURNAL REKAYASA SISTEM INDUSTRI Vol 4 No 2 (2019): Edisi Mei
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (667.373 KB) | DOI: 10.33884/jrsi.v1i2.1245

Abstract

Quality management system is the ability of an organization to maintain the quality of goods or services that are served. The efforts made by the company are to improve the management system that is prime with ISO 9001: 2008 which is an international requirement for a company's management system. PT Softex Indonesia is the first producer of sanitary napkin made in Indonesia which has obtained ISO 9001: 2008 certificate and applied it in the implementation of production activities. One way to achieve success in maintaining the quality of a product is by improving work performance in order to produce quality products. Based on this, the researchers analyzed the effect of implementing ISO 9001: 2008 on improving employee performance. The data used in this study were obtained from a questionnaire (primary) and several observations and direct interviews with parties related to employee performance. The analysis technique used is simple regression using hypothesis testing, namely F test and t test. Based on the results of the study the magnitude of the influence of the application of ISO 9001: 2008 which directly affects the improvement of employee performance. From this study, R Square value was 0.504, which means that 50.4% of employee performance improvement variables can be explained by its independent variables, namely ISO 9001: 2008, while the remaining 49.3% is explained by other variables outside of this study.
ANALISIS PEMILIHAN SUPPLIER DAN PENENTUAN JUMLAH PEMBELIAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ANALYTIC NETWORK PROCESS (ANP) Citra Indah Asmarawati; Sadiq Ardo Wibowo
JURNAL REKAYASA SISTEM INDUSTRI Vol 6 No 2 (2021): (Mei 2021)
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v6i2.2398

Abstract

PT. Guna Kemas Indah in determining the supplier of raw materials, but the existing criteria are not sufficient to meet the expected criteria. By using Analytical networking process (ANP) and goal programming in determining quality. In addition, it can also be seen how much raw material purchases are based on the selected supplier. Selection of suppliers is based on several criteria using vendor performance indicators, which are arranged based on sub-criteria. Where the existing subcriteria can influence each criterion. Based on the weight calculation for the criteria are success-quality (0.3868), cost (0.3668), delivery (0.1256), flexibility (0.0619), responsiveness (0.0586) so that 3 supplier candidates will be obtained.
DESAIN JALUR EVAKUASI PENGGUNA BANGUNAN PADA KONDISI DARURAT DI GEDUNG FTI- UMI LANTAI IV MENGGUNAKAN ALGORITMA FLOYD WARSHALL Yan Herdianzah; Ahmad Padhil; A. Dwi Wahyuni P; Andi Pawennari; Takdir Alisayabana; Abdul Mail; Taufik Alimuddin; Sadiq Ardo Wibowo
JURNAL REKAYASA SISTEM INDUSTRI Vol 7 No 2 (2022): (Mei 2022)
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v7i2.4536

Abstract

It is often assumed that occupational safety and health (K3) is a waste, a waste of cost or just a formality that must be fulfilled by the organization. The K3 procedure in a building is very important especially in a multi-storey building, because in a multi-storey building there are risks that cannot be predicted, for example in the event of an earthquake or fire. Based on the legal aspects of OSH which have been stipulated in Law No. 28 of 2002 concerning building construction, the importance of comfort, safety, health and convenience must be owned by a building. This research is about the evacuation route in the Faculty of Industrial Technology Building, Muslim University of Indonesia, Floor IV Using the Floyd Warshal Algorithm. By using the required data such as building plans, room data used per floor, the number of permanent and temporary building occupants, the results of data processing are obtained from the design drawings of the evacuation route, complete with instructions for safe lane during emergencies.
PENERAPAN LEAN MANUFACTURING DALAM PENINGKATAN PRODUKTIVITAS ALUMUNIUM BAKING TRAY Sadiq Ardo Wibowo
JURNAL REKAYASA SISTEM INDUSTRI Vol 7 No 1 (2021): (November 2021)
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v7i1.4543

Abstract

Along with the rapid growth of the manufacturing industry, companies are required to create advantages in order to survive and compete with competing companies. Competition between companies requires every manufacturer to make improvements for the better. One of the industry players who are expected to make improvements is TS. aluminum. Where the improvements made focus on the production process line related to the company's productivity. The production process often arises in the form of a series of wastes such as waiting time (waiting time), work in process (WIP) and transportation that is too long. A number of these wastes can result in disruption to performance and decreased productivity. Through this research, efforts were made to reduce waste by using lean manufacturing, VSM, and FMEA. The results showed that there was a decrease in the set up time to 2135 seconds, the waiting time between cutting and filing operations to 256.8 seconds, the turning waiting time to 262.31 and the loss of transportation distance by 22 m in the finishing polishing operation which resulted in the time required reduced to 123.94 seconds. In addition, the company experienced an increase in labor productivity of 5.18, capital productivity of 28.52, productivity of raw materials 4.3, productivity of other components by 33.65 and total productivity of the company by 2.04.
MANAJEMEN RESIKO PADA PENGUJIAN ROV DI PT. SAMUDERA OCEANEERING Sadiq Ardo Wibowo; citra indah asmarawati; Chandra Putra
JURNAL REKAYASA SISTEM INDUSTRI Vol 7 No 2 (2022): (Mei 2022)
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v7i2.5497

Abstract

PT. Samudera Oceaneering is a branch of Oceaneering International Incorporated with main focus on the oil and gas industry. As a branch company of ROV, PT. Samudera Oceaneering always ensures that the ROV that will be sent for underwater works is in top notch condition and has been tested prior to the project to ensure all the functions are working properly and meet the specifications set by the client. In this internship the author takes a specific topic of risk management on ROV testing at PT. Samudera Oceaneering. Hazard identification is carried out in detail on the ROV testing process using the JSEA method. The risk assessment in the ROV testing process was obtained with the majority of the testing process being at high risk level. Based on the results of the risk assessment, the recommendation for risk control on the potential hazards that exist including installing a barricade in the test area, using the right PPE and tooling that is in good condition, ensuring that each item used has passed the test and is certified.