ANALISIS METODE PELAKSANAAN PEMBANGUNAN BANGUNAN BAMBU REGENERATIVE FARMING LEARNING CENTER (RFLC) SUBAK UMA LAMBING SIBANGKAJA TJOKORDA ISTRI PRAGANINGRUM; I GEDE ANGGA DIPUTERA; WAYAN GDE ADI ANANTAWIJAYA
GANEC SWARA Vol 16, No 2 (2022): September 2022
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v16i2.320

Abstract

Overall development continues from time to time. Bali as a tourist destination also always strives to improve its quality by carrying out various developments, especially in fields that support tourism activities. Bali with its natural wealth uses bamboo as the basis for buildings. Apart from being a natural material, it also has a high aesthetic value. However, it must be realized that the use of bamboo material requires special skills and methods that are different from the use of other materials. One of the buildings that uses bamboo is the Regenerative Farming Learning Center (RLFC) Subak Uma Lambing Sibangkaja. This study aims to determine in detail how the construction method for buildings with bamboo material is and how it relates to costs and implementation time. The method used is descriptive with qualitative and quantitative approaches. The author makes observations to observe the stages of activities, material specifications and workmanship techniques during the construction process. Based on the results of the analysis obtained a description of the stages of each work starting from foundation work to finishing. It is known that the cost of constructing the RLFC building is Rp. 241,054.000,00 and the processing time required in the manufacture of this RFLC bamboo building is 7 weeks or 49 days
ANALISIS PEMAHAMAN KONSEP GREEN CONSTRUCTION PADA PEMBANGUNAN GEDUNG KONSTRUKSI PUTU ANANDA RAGA UTAMA; NI NYOMAN INTAN SAWITRI SARASWATI; TJOKORDA ISTRI PRAGANINGRUM; NI LUH MADE AYU MIRAYANI PRADNYADARI; IDA BAGUS SURYATMAJA; I GUSTI AGUNG GDE SURYADARMAWAN
GANEC SWARA Vol 17, No 1 (2023): Maret 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i1.388

Abstract

Green construction is an effort or strategy for managing construction activities, including the use of efficient and environmentally friendly resources so that they can support a sustainable movement. However, in reality not all parties related to construction activities understand what is meant by green construction. In this regard, a study was conducted to find out how the understanding of construction actors, especially contractors, in the application of green construction. The research was conducted on the Gianyar Market development project because this project has the desire to apply the green building concept. The method used is a qualitative method with interviews, with respondents who are involved in the construction process of the Gianyar Market development. From the results of the study, it was found that the level of understanding of the informants on green construction was sufficient. The resource persons did not fully understand the aspects and factors as well as indicators in green construction. This can be seen from several key statements stating that the explanation of green construction is still general, including green construction which is environmentally friendly construction, does not pollute the environment, and minimizes the negative impact of construction on the environment. From the contractor side, it still requires a more detailed understanding related to green construction. Furthermore, socialization and training can be carried out, as well as strengthening the interpretation of related regulations to increase understanding of green construction.
ANALISIS KEANDALAN BANGUNAN GEDUNG (STUDI KASUS: BANGUNAN GEDUNG REKTORAT UNIVERSITAS MAHASARASWATI DENPASAR) TJOKORDA ISTRI PRAGANINGRUM; NI LUH MADE AYU MIRAYANI PRADNYADARI; PUTU OCHA MAYA FIRANTHI
GANEC SWARA Vol 17, No 1 (2023): Maret 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i1.364

Abstract

The Building in situations and conditions until now there are still some that have experienced partial or complete collapse due to several causes, namely natural disasters, converted building functions that cause undue pressure / load, or structural failures or errors. In this regard, it is desirable that there will be a reliability check on the building. The building studied in this study is the Rectorate Building of Mahasaraswati University Denpasar. In this case, to evaluate the reliability of the Building, an analysis was carried out with interviews and questionnaires with interview samples, namely 14 speakers and questionnaires, namely 34 respondents. In this study using descriptive research methods with quantitative and qualitative approaches. Factors that affect the reliability of the rectorate building of Mahasaraswati University Denpasar include architecture, structure, utility and fire protection, accessibility, building arrangements and the environment. The results of the evaluation of the level of reliability of this building include architecture, namely 87% which includes less reliable (75 - < 95%), structures which are 96% which include reliable (95 - 100%), utilities and fire protection which are 86% which include unreliable (< 95 %), accessibility which is 82% which includes less reliable (75 - < 95%), and building and environmental arrangements which are 57% which include unreliable (< 75%). The total reliability value is 82% where the building of the Rectorate Building of Mahasaraswati University Denpasar is less reliable (75 - < 95%)
ANALISIS PERCEPATAN WAKTU PELAKSANAAN PROYEK BERBASIS MICROSOFT PROJECT (STUDI KASUS: PEMBANGUNAN RENOVASI HOTEL LAGUNA RESORT AND SPA NUSA DUA) I GEDE NGURAH SUNATHA; TJOKORDA ISTRI PRAGANINGRUM; I PUTU SAI CANDRA PREMA NATA
GANEC SWARA Vol 17, No 2 (2023): Juni 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i2.461

Abstract

In project construction, problems during the implementation phase are unavoidable, resulting in non-compliance with the previously designed plan. In the case study of the construction of the Laguna Resort and Spa Nusa Dua hotel, based on the author's observations, data from the Planned Time Schedule and Realization Time Schedule found differences in the realization time with the plan, where the realization was delayed. In overcoming the delay, it is necessary to accelerate the completion time by accelerating the implementation time and conducting an analysis regarding how much influence the acceleration of completion time has by utilizing the Microsoft Project program. The data used is a quantitative descriptive method, namely by submitting a request for data to the Contractor. From processing the data and conducting 3 experiments on Microsoft Project, the authors chose the second experiment, namely by accelerating the Millwork sub-bill by reducing the average work duration of 1 working day. Activities that experience acceleration are as many as 26 work items including 8 work items on the 1st floor, 6 items on the 2nd floor, 6 items on the 3rd floor, and 6 items on the 4th floor. The results of the accelerated time are 5 (days) according to the time plan schedule
KAJIAN FAKTOR PENYEBAB KENDALA IMPLEMENTASI KONSEP GREEN CONSTRUCTION PADA GEDUNG PASAR GIANYAR NI LUH MADE AYU MIRAYANI PRADNYADARI; TJOKORDA ISTRI PRAGANINGRUM
GANEC SWARA Vol 17, No 2 (2023): Juni 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i2.469

Abstract

Ongoing construction projects using material resources and equipment can harm environmental conditions. Thus, it requires high awareness and willingness to maintain the environment in construction project management. Green construction is explained as an effort or strategy for managing construction activities, including the use of resources that are efficient and environmentally friendly so that they can support a sustainable movement. This research aims to discover the causes of obstacles in implementing green construction in the Gianyar Market development project. The method used is qualitative, with interviews with 28 respondents involved in the construction process of the Gianyar Market development. From the results of the study, it was found that the constraints experienced by contractors in the implementation of Greem construction included (1) Human Resources, (2) Materials or Material Resources, (3) Facilities and Infrastructure, and (4) Costs. These constraints are caused by several factors, namely (1) Lack of understanding, (2) Requiring particular experts, (3) Need to improve the quality of facilities and infrastructure, and (4) Readiness of the budget. From these results, it is possible to evaluate and increase the quantity and quality of the facilities and infrastructure owned to support the implementation of green construction, as well as coordinate with Experts who understand green construction well.
SISTEM PENYEDIAAN BAHAN DAN PERALATAN PADA KONTRAKTOR SEBAGAI PENYEDIA JASA KONSTRUKSI DI KOTA DENPASAR TJOK ISTRI PRAGANINGRUM; I GEDE ANGGA DIPUTERA; I MADE WAHYU ADITIA SASTRA PUTRA
GANEC SWARA Vol 17, No 3 (2023): September 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i3.539

Abstract

The growing demand for and competition for construction services requires construction service providers to provide materials and equipment on time. This research was conducted in the city of Denpasar with contractors who have 7 sub-classifications of work. By distributing questionnaires to 16 contractors in Denpasar city companies with the benchmarks used are organizational structure, adequate systems and procedures and sound practices in carrying out tasks. This research used descriptive method and infrensia method. With the results of data analysis based on organizational structure benchmarks, adequate results were obtained, while for document recording, systems of authority and procedures, and healthy work practices, adequate results were obtained. So the existing system of a construction service contractor company located in the Denpasar City area needs to improve efficiency and effectiveness in an organizational structure that separates functional responsibilities.
KAJIAN EFEKTIFITAS POLA SIRKULASI KAWASAN WISATA DESA TRADISONAL PENGLIPURAN SURYADARMAWAN, I GUSTI AGUNG GDE; PRAGANINGRUM, TJOKORDA ISTRI; GIRI, I KETUT SUDIPTA; HERMAWAN, I PUTU YANA; SARI, PUTRI AGUNG PERMATA
GANEC SWARA Vol 18, No 3 (2024): September 2024
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v18i3.1059

Abstract

Bali, as one of the main tourist destinations in Indonesia, has a variety of attractions, including the Penglipuran Traditional Tourism Village in Bangli Regency. The popularity of this tourist village has led to a significant increase in vehicle flow, especially on weekends and holidays, resulting in congestion around tourist areas. Vehicles parked carelessly on the side of the road interfere with mobility for both locals and other tourists. This study aims to evaluate the effectiveness of current circulation patterns and identify potential solutions. Using a qualitative method with a naturalistic approach, this study will observe and analyze vehicle movement patterns, parking behavior, and their impact on traffic and visitor comfort. The results of this study are expected to provide recommendations for more effective circulation pattern arrangement, including parking management, alternative routes, and road infrastructure improvements. With the implementation of the right solutions, it is hoped that the comfort and experience of tourists in the Penglipuran Traditional Tourism Village can be significantly improved, while maintaining smooth traffic for local residents.
KEANDALAN BANGUNAN GEDUNG PASAR RAKYAT TEMATIK WISATA UBUD PRAGANINGRUM, TJOKORDA ISTRI; PRADNYADARI, NI LUH MADE AYU MIRAYANI; SARASWATI, NI NYOMAN INTAN SAWITRI
GANEC SWARA Vol 17, No 4 (2023): Desember 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i4.650

Abstract

Implementing building reliability is necessary to ensure the safety of all elements in the building. The Ubud Tourism Thematic People's Market is a 2-story building equipped with a basement. Located on Jl. Raya Ubud Nomer. 35, Ubud District, Gianyar, with a building area of 8,253 m2. This research aims to determine the level of reliability of the Ubud Thematic Tourism People's Market building. This research uses quantitative descriptive research methods. Data was obtained from a questionnaire guided by Minister of Public Works Regulation No. 29/PRT/M/2006 and Gianyar Regent Regulation Number 7 of 2023. Data analysis in this research was carried out using interview method and questionnaires. The interview method used purposive sampling with a sample of parties involved in the construction of the Ubud Thematic Tourism People's Market building, with a total of 26 respondents. The results obtained by the level of reliability of the Ubud Thematic Tourism People's Market building were divided into five, namely architectural reliability of 96.08% including reliable (95 - 100%), structural reliability of 95.92% including reliable (95 - 100%), reliability of utilities and fire protection is 96.25% including reliable (95 – 100%), reliability of accessibility is 95.76% including reliable (95 – 100%), and reliability of building layout and environment is 95.4% including reliable (95 – 100% ). The total reliability value of the Ubud Thematic Tourism People's Market building is 96.80%, including reliability (95 – 100%).
ANALISIS PERBANDINGAN PENGUJIAN BORE PILE MENGGUNAKAN SLT (STATIC LOADING TEST) DENGAN PDA (PILE DRIVING ANALYZER) (STUDI KASUS: PROYEK TSINGHUA KAMPUS, SERANGAN DENPASAR) PRAGANINGRUM, TJOKORDA ISTRI; WANGSA, ANAK AGUNG RATU RITAKA; PRADNYADARI, NI LUH MADE AYU MIRAYANI; PUTRA, I WAYAN ANDIKA PRAYOGA
GANEC SWARA Vol 18, No 2 (2024): Juni 2024
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v18i2.879

Abstract

The foundation has an important role to transfer the structural load above it to the lower soil layer. To prove the accuracy of the calculation of the design of the carrying capacity of foundation piles in the field, it is necessary to carry out a test. The Tsinghua Campus Project is a project located in the Serangan area using a bore pile foundation with a diameter of 80 cm where to determine the carrying capacity of the foundation pile used Static Loading Test (SLT) and Pile Driving Analyzer (PDA) test methods. The purpose of this study is to determine the choice from the results of the comparison of implementation methods with the time and cost required in the two test methods.  The method used in this study is through observation that visits directly to the field to look for aspects that need to be discussed to compare the two testing methods. The results of the Static Loding Test require a fee of Rp. 257,990,000.00 for testing 1 point of foundation piles and a test duration of 7 days for 1 test point, while the Pile Driving Analyzer requires more complex and more advanced reality models so that the results can be used in motion analysis. Then it is necessary to get a better way to separate the resistance of the shaft and the foot. However, please be aware that those using PDA results should understand that it is important to include information about subsoil and soil characteristics, groundwater and pore pressure, and other geotechnical matters and bring this information equivalent in quality to dynamic records. In addition to requiring a cost of Rp. 23,104,000.00 and the duration of the Pile Driving Analyzer test is for 2 days for 2 test points. The ultimate carrying capacity value of the Pile Driving Analyzer analyzer is known to be closest to the results of the Static Loding Test test interpreted by the Chin method
ANALISIS RISIKO PADA PELAKSANAAN PROYEK PEMBANGUNAN SARANA PENGENDALIAN BANJIR PADA WADUK MUARA NUSA DUA DENPASAR WANGSA, ANAK AGUNG RATU RITAKA; PRAGANINGRUM, TJOKORDA ISTRI; LESTARI, I GUSTI AGUNG AYU ISTRI; SURYATMAJA, IDA BAGUS
GANEC SWARA Vol 17, No 4 (2023): Desember 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i4.656

Abstract

Flooding that occurs due to runoff and scouring of Nusa Dua estuary reservoir water in Denpasar city causes the risk of inundating the surrounding roads and entering the mangrove forest. One of the efforts made by the Bali-Penida River Basin Hall is to carry out a flood control facility construction project. The purpose of this study is to identify the risks faced, measure and determine the magnitude of acceptable risks. The method used is descriptive with a qualitative approach. Data collection was conducted by interviews related to risk identification and questionnaires related to risk assessment. The results showed that the risks identified in the implementation of the flood control facility development project in the Nusa Dua estuary reservoir amounted to 36 risks consisting of 10 risk sources. The dominant source of risk is technical, project and safety risks with a percentage of 14%. After an assessment by 17 respondents, there were 15 risks (86%) with unacceptable categories, 10 risks (63%) with undesirable categories, 7 risks (38%) with acceptable categories, and 4 risks (13%) with negligible categories.
Co-Authors A.A. GEDE SUTRISNA WIJAYA PUTRA ANAK AGUNG GDE SUTRISNA WIJAYA PUTRA Anak Agung Ratu Ritaka Wangsa Cok Putra Wirasutama DWIYANTI, NI MADE MEILAN FLORENZIA Emanuel Mahemba Eufrosina, Meitania Graha, I Made Satya HERMAWAN, I PUTU YANA I Gede Angga Diputera I Gede Gegiranang Wiryadi I GEDE MERTA YOGA PRATAMA I Gede Ngurah Sunatha I Gede Ngurah Sunatha I Gede Ngurah Sunatha I Gede, Ngurah Sunatha I Gusti Agung Ayu Istri Lestari I Gusti Agung Gde Suryadarmawan I Gusti Agung Gde Suryadarmawan I Kadek Krisna Dwipayana I KETUT AGUS KARMADI I Ketut Sudipta Giri I Ketut Sudipta Giri I MADE BRAM SARJANA I Made Nada I Made Sastra Wibawa I Made Suryawan I Made Suryawan I MADE WAHYU ADITIA SASTRA PUTRA I Made Wahyu Wijaya I NYOMAN ADI WIRATMA I PUTU SAI CANDRA PREMA NATA I Putu Yana Hermawan Ida Ayu Putu Utami Paramita Ida Ayu Widi Adnyani Ida Bagus Suryatmaja Jeemly Waang Atama Krisna Kurniari Maria Alvianita Dhey Ni Gst. Ag. Gde Eka Martiningsih Ni Luh Ayu Krishna Yuni Permatasari Ni Luh Made Ayu Mirayani Ni Luh Made Ayu Mirayani Pradnyadari Ni Luh Made Ayu Mirayani Pradnyadari Ni Made Dwi Puspitawati Ni Nyoman Intan Sawitri Saraswati NI NYOMAN INTAN SAWITRI SARASWATI Ni Nyoman Intan Sawitri Saraswati Ni Putu Atika Hanny Vidary Ni Putu Cempaka Dharmadewi Atmaja Ni Putu Okky Larashati Ni Putu Sintya Saraswati Ni Putu Sintya Saraswati Ni Putu Yuria Mendra Perseveranda Arum Pradnyadari, Ni Luh Made Ayu Mirayani Pramana Putra, I Putu Mahesa PUTRA, I WAYAN ANDIKA PRAYOGA Putri Agung Permata Sari Putu Ananda Raga Utama PUTU ANANDA RAGA UTAMA Putu Ananda Raga Utama6 Putu Mia Loviani Putu Ocha Maya Firanthi R. Sapto Hendri Boedi Soesatyo Rato, Susanti Ina Ratu, Vivin Sartika Rosari Renita, Ni Made Indah Wiwin SARASWATI, NI NYOMAN INTAN SAWITRI SATRIYAS ILYAS Sega, Shania Valencia Susannie SURYADARMAWAN, I GUSTI AGUNG GDE WAYAN GDE ADI ANANTAWIJAYA Yohana Jusna