Search

Analyzing The Impact of Contract Value, Project Duration, and Number of Floors on Human Resource Costs In The Agenci Dejenvolvementu Nacional Office Construction Project In Dili Using Multiple Regression Raimundo, João; Witjaksana, Budi; Purnama, Jaka
Asian Journal of Social and Humanities Vol. 3 No. 6 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i6.524

Abstract

This study aims to analyze the influence of building construction project financing, which includes contract value, project duration, and number of floors, on human resource costs (Expert Costs, Skilled Labor Costs, and Worker/Mandor Costs) in building construction projects within the Dili City Government Office. The research focuses on 20 building projects in the Dili City Government Office environment. Using project report documents as data, the independent variables in this study are contract value, project duration, and the number of floors, while the dependent variables are the costs associated with experts, skilled labor, and workers/mandors/laden. The study employs multiple linear regression analysis to assess the relationship between these variables. The results show that the contract value has a significant partial effect on human resource costs, including expert costs, skilled labor costs, and worker/mandor costs. This indicates that a higher contract value influences the allocation of human resource costs in building construction projects. In conclusion, the study highlights the importance of managing contract value, project duration, and the number of floors to optimize human resource costs and ensure efficient project completion.
Analysis of Occupational Safety and Health (OSH) Cost Requirements in The Construction of Rubaru 1 Elementary School Permana, Midi Agus; Witjaksana, Budi; Purnama, Jaka
Asian Journal of Social and Humanities Vol. 3 No. 7 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i7.543

Abstract

This research addresses the critical issue of insufficient budget allocation for Occupational Safety and Health (OHS) systems in construction projects, specifically in the Rubaru 1 Elementary School building project in Sumenep District, Indonesia. The study explores how limited financial resources for safety measures, such as personal protective equipment (PPE), worker training, and health facilities, affect the implementation and effectiveness of OHS systems. The urgency of this research lies in the growing need to allocate adequate resources to OHS, as insufficient funding increases the risk of workplace accidents, delays project timelines, and raises costs. Previous studies, including Lestari et al. (2023) and Saragi & Sinaga (2021), have emphasized the positive impact of adequate OHS budgets on reducing accidents and improving productivity. However, a gap exists in research regarding the specific cost components required for effective OHS implementation, especially in relation to construction projects with limited budgets. This study fills this gap by analyzing the key cost components for OHS and their direct impact on worker safety and project performance. The findings will provide valuable insights for construction companies to optimize their OHS budgets and enhance safety measures. It also contributes to the development of industry standards and practices for OHS management in future construction projects.
High-Level Risk Analysis in the Construction Project of RSUD Dr. H. Slamet Martodirdjo in Pamekasan Ridwan, Ridwan; Witjaksana, Budi; Purnama, Jaka
Asian Journal of Social and Humanities Vol. 3 No. 7 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i7.544

Abstract

The construction of the Regional General Hospital Dr. H. Slamet Martodirdjo in Pamekasan Regency faces several challenges, particularly concerning high-level risks that may impact project success. This study aims to identify and analyze major risks affecting project completion and propose effective mitigation strategies. Using a survey method, data were collected from key stakeholders and processed using the Severity Index and Probability and Impact Matrix to assess risk levels. The findings identified 25 potential risks, with eight categorized as high-level risks: implementation method errors, difficulties in installing cross foundations, delays in critical path tasks, late material procurement, labor shortages, non-compliance with occupational safety regulations, lack of teamwork among workers, and adverse weather conditions. These risks significantly impact the project timeline, budget, and overall quality. The study also reveals that poor coordination among stakeholders, inefficient risk management practices, and regulatory constraints contribute to project delays. To mitigate these risks, strategic planning, improved procurement management, workforce training, and strict adherence to occupational safety regulations are recommended. Additionally, the adoption of technology-driven solutions, such as digital monitoring systems and e-procurement platforms, can enhance project oversight and efficiency. By implementing a systematic risk management framework, construction projects can minimize potential disruptions, ensure timely project delivery, and maintain cost efficiency. The findings of this study provide valuable insights for project managers, contractors, and policymakers in the construction industry, particularly for large-scale healthcare infrastructure projects. A proactive risk mitigation approach is essential to achieving successful project execution and sustainable infrastructure development.
Cost and Time Analysis of Project Acceleration using the Crashing Method with Additional Working Hours and Labor Lutfi, Moh Ali; Witjaksana, Budi; Purnama, Jaka
Asian Journal of Social and Humanities Vol. 3 No. 7 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i7.545

Abstract

This study aims to analyze project cost and time acceleration using the Crashing Method by adding three hours of overtime work and additional labor. Delays in construction projects often lead to budget overruns and inefficiencies, making acceleration techniques essential for ensuring timely project completion. The research evaluates cost efficiency by comparing the total project budget before and after implementing the Crashing Method. Using both qualitative and quantitative approaches, this study examines the impact of different acceleration strategies on cost increase and time reduction. The findings indicate that project completion time can be significantly reduced using both methods; however, overtime results in higher cost increases compared to additional labor. While overtime provides immediate acceleration, it incurs higher expenses due to increased labor wages, whereas adding workforce results in gradual but more cost-effective acceleration. Furthermore, the study underscores the importance of selecting the appropriate acceleration approach based on project constraints, workforce availability, and financial considerations. Effective resource allocation, labor management, and risk assessment are critical factors in minimizing costs while maximizing efficiency. By analyzing the trade-offs between cost and time, this study provides valuable insights into the optimal strategy for project acceleration in construction management. The findings offer practical recommendations for contractors, project managers, and stakeholders to optimize resources and maintain budget control while ensuring project completion within the scheduled timeframe.
Cost and Time Efficiency Through The Application of Value Engineering In The Construction of an ASN Flat Building In Seram Bagian Barat Regency Pramono, Eko; Witjaksana, Budi; Purnama, Jaka
Devotion : Journal of Research and Community Service Vol. 6 No. 3 (2025): Devotion: Journal of Community Research
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/devotion.v6i3.25434

Abstract

This research employs the Value Engineering (VE) method to address these challenges, focusing on high-impact work items such as formwork, floor slabs, walls, and structural elements. Utilizing techniques like Work Breakdown Structure (WBS) and Function Analysis System Technique (FAST), the study systematically evaluates opportunities for cost and time savings while maintaining the project’s functional and quality standards. The results demonstrate that the application of knock-down formwork systems significantly reduces material costs and accelerates construction schedules, achieving up to 20% cost savings in specific work items. The use of local materials further contributes to the optimization process, reducing procurement costs and supporting sustainable practices by minimizing environmental impact. Additionally, the redesign of structural components, such as optimized column dimensions, enhances efficiency without compromising safety or functionality. This study underscores the importance of VE as a collaborative and multidisciplinary tool that integrates technical, social, and cultural considerations. It highlights the critical role of stakeholder involvement, particularly in projects with complex socio-cultural dynamics, ensuring practical and acceptable solutions. By illustrating the effectiveness of VE in overcoming constraints, this research provides a valuable framework for applying VE in future infrastructure projects, especially in areas with similar challenges.
Analisis Produktivitas Dalam Upaya Peningkatan Produksi (Studi Kasus : PG Candi Baru Sidoarjo) Kisawa, Musthofa; Purnama, Jaka
Jurnal Ilmiah Wahana Pendidikan Vol 10 No 13 (2024): Jurnal Ilmiah Wahana Pendidikan 
Publisher : Peneliti.net

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.5281/zenodo.12790112

Abstract

PG Candi Baru Sidoarjo merupakan salah satu perusahaan yang memproduksi gula terkemuka di Indonesia. Kehadirannya dalam industri gula nasional memiliki dampak penting terhadap perekonomian daerah serta ketersediaan gula sebagai bahan pokok masyarakat. Namun, dalam beberapa tahun terakhir, pabrik ini mengalami penurunan produksi di saat permintaan yang terus meningkat. Kurangnya bahan baku, terjadinya penumpukan tenaga kerja pada beberapa stasiun kerja, waktu kerja mesin dan penggunaan energi listrik yang menurun karena kurangnya bahan baku merupakan faktor yang mempengaruhi penurunan produksi. Dalam mengatasi permasalahan ini, peneliti melakukan analisis produktivitas pada PG Candi Baru Sidoarjo dengan fokus pada beberapa kriteria-kriteria yang memengaruhi kinerja produksi. Metode penelitian yang digunakan adalah Objective Matrix (OMAX). Di pabrik, pengukuran produktivitas dilakukan dengan menggunakan kriteria yang sesuai untuk setiap bagian organisasi untuk memantau produktivitas bagian tersebut. Ini menghasilkan empat kriteria untuk mengukur produktivitas perusahaan: produktivitas dari bahan baku, produktivitas tenaga kerja, produktivitas dari waktu kerja mesin, dan produktivitas dari energi listrik. Untuk hasil yang didapatkan produktivitas parsial pada setiap kriteria adalah produktivitas bahan baku dengan nilai 7, produktivitas tenaga kerja dengan 10, produktivitas waktu kerja mesin pada stasiun gilingan dengan nilai 8 dan produktivitas energi listrik pada stasiun gilingan dengan nilai 9. Sedangkan hasil produktivitas total pada tahun 2021 sebesar 14,216 dan pada tahun sebesar 14,114. Oleh karena itu, PG Candi Baru perlu meningkatkan jumlah bahan baku, menyesuaikan tenaga kerja di setiap stasiun, menerapkan rencana penjadwalan di setiap stasiun untuk mencegah waktu henti yang mengganggu proses produksi, dan mengawasi berapa banyak energi listrik yang digunakan membuatnya bekerja lebih baik.
Analisa Pemeliharaan Mesin Produksi dengan Metode Reliability Centered Maintenance (RCM) dan Age Replacement Juwandono, Joko Tri; Purnama, Jaka
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15768

Abstract

Maintenance is needed to keep a machine operating under normal conditions for a certain period of time. PT. Daesang Ingredients Indonesia produces its packaging at a printing plant with the help of rotogravure printing, laminating and slitting machines. A total downtime of 21,100 minutes was obtained from March 2021 to March 2023, resulting in a decrease in production and an increase in costs due to corrective machine maintenance. This study aims to provide preventive maintenance proposals by identifying critical components and optimal maintenance actions using the Reliability Centered Maintenance (RCM) method and formulating component replacement intervals to minimize downtime with Age Replacement. Based on the research results, it is known that the critical components are the bearing, vanbelt and slitting blade components with time direct optimal maintenance measures, while the hose components and impression rollers are condition direct. The formulation of the replacement interval for the bearing, vanbelt and impression roller printing machine components is 23,000 minutes, 49,000 minutes and 47,000 minutes. For bearing components, hoses and vanbelt laminating machines for 28,000 minutes, 35,000 minutes and 44,000 minutes. As for the components of the slitting blade, bearing and vanbelt slitting machine 80,000 minutes, 120,000 minutes and 150,000 minutes
Rancang Bangun Mesin Pengayak Terasi Bubuk Guna Meningkatkan Output Produksi dengan Pendekatan Antropometri Febyyanti , Nurul; Purnama, Jaka
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.27413

Abstract

Increased consumer demand makes UMKM H.J Irin experience obstacles that are quite influential on production process activities. In this study, an ergonomic sieving machine design with anthropometric methods was carried out with the aim of helping the sieving process to be faster and increase productivity. Anthropometry is a method used to determine the size that is in accordance with anthropometric data obtained from the measurement of the worker's body. This research uses the time study method by making direct observations recording normal time and standard time. From the results of data processing that has been carried out from the anthropometric results of workers, the dimensions of the machine are obtained at a machine height of 82 cm, a machine width of 50 cm, and a machine reach of 67 cm. The increase that occurs in the sieving process is obtained an increase in productivity that occurs by 1.40%, with details of the productivity of manual sieving tools of 14% and after the design of the machine as much as 15.40%.
Perancangan Alat Pencelupan Benang untuk Meningkatkan Kapasitas Produksi pada Proses Pencelupan Benang pada UMKM H. Muslikun Zain, Badrus Sibyan; Purnama, Jaka
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.27701

Abstract

UMKM H. Muslikun is a business that produces traditional woven sarongs. In the production process, the yarn dyeing process is one of the important processes and has an influence on the products produced. In this yarn dyeing process, manual tools are still used, and the position is less ergonomic because the worker bends slightly, besides that the production capacity that can be produced is still quite small. This results in workers feeling less comfortable and the need for threads being unable to be met if at any time there is an increase in demand due to increased production. Therefore, from this, in this research a yarn dyeing tool will be created that is in accordance with ergonomics using anthropometric methods with the aim of making workers comfortable and increasing production capacity in the yarn dyeing process. From anthropometric data processing, the machine dimensions are 100 cm high and 58 cm wide. From the test results, it was found that the capacity of yarn that could be dyed was 160 rolls from the previous 150 rolls of yarn.
Pengendalian Persediaan Bahan Baku Guna Mengoptimalkan Penyimpanan pada Gudang Hardianto, Kresna Frantiarno; Purnama, Jaka
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.27843

Abstract

The rapid development in the industrial world forces industry players to be required to pay attention to all aspects of business in their efforts to survive in competition, including control of raw material storage for the smooth production process. UD. XYZ is an industry engaged in the production of shovels, which in the production process involves several raw materials on a fairly large scale. The limited raw material storage space available results in frequent accumulation of some raw materials which can have an effect on the continuity of the production process. Calculations are carried out using the ABC classification method, inventory turnover ratio, and min-max stock on raw material control to avoid the accumulation of raw materials in the storage room. It was noted that there were several raw materials that experienced accumulation such as iron plates, iron pipes, screws and welding wires.