Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Titra

Pengurangan Jumlah Produk Setengah Jadi di PT. SEMB-PEL Setiawan, Rizal; Widyadana, I Gede Agus; Palit, Herry Christian
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

The need for work in process on PCBA production line can be caused by fluctuating demand for PCBA products. Amount of work in process on production line that company wanted is between 3 up to 7 inventory days. Average current amount of work in process before implementation of proposed improvement is 12.03 inventory days. Root causes anaylise uses root cause tree. There are two proposed improvements, which are improvement on work in process update’s system and improvement on material distribution to every work station. Proposed improvement that can be implemented is improvement on material distribution of every work station. Average amount of work in process after implementation the improvement is 6.72 inventory days.
Pengurangan Jumlah Produk Setengah Jadi di PT. SEMB-PEL Rizal Setiawan; I Gede Agus Widyadana; Herry Christian Palit
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (231.857 KB)

Abstract

The need for work in process on PCBA production line can be caused by fluctuating demand for PCBA products. Amount of work in process on production line that company wanted is between 3 up to 7 inventory days. Average current amount of work in process before implementation of proposed improvement is 12.03 inventory days. Root causes anaylise uses root cause tree. There are two proposed improvements, which are improvement on work in process update’s system and improvement on material distribution to every work station. Proposed improvement that can be implemented is improvement on material distribution of every work station. Average amount of work in process after implementation the improvement is 6.72 inventory days.