Analisa Pengendalian Proyek Menggunakan Metode Nilai Hasil pada Pembangunan Kantor PT. Waruna Purba, Leonardo; Ardan, Melloukey; Rangkuti, Nuril Mahda
Jurnal Ilmiah Teknik Sipil dan Arsitektur (JITAS) Vol 3, No 1 (2024): Jurnal Ilmiah Teknik Sipil dan Arsitektur (JITAS)
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jitas.v3i1.3874

Abstract

This study uses the method of value results (Earned Value). This study aims to determine or predict how much the cost of a project at the time of implementation and to determine the effectiveness of project control and to determine the efficiency of resource users in the form of Cost Performance Index (CPI) and Schedule Performance Index (SPI) as well as total project cost forecasts (EAC). To analyze project control, there are three parameters or indicators, namely BCWS (Budgeted Cost of Work Schedule), BCWP (Budgeted Cost of Work Performed), ACWP (Actual Cost of Work Performed). Delays and deviations can be identified by looking at the Cost Variant (CV) and Schedule Variant (SV). In the calculation of the concept, the value of the SV = -6.197.845.000 value (-) indicates that the work is running slower than the planned schedule, while the CV value = -232.750 value (-) indicates the work costs more than the budget provided. By calculating the estimated total project cost (EAC) of Rp. 15,755.722,795 while the RAB value is Rp. 15,345,000,000. this means that at the end of the project it is estimated that there will be a cost overrun of Rp.410.722.792 (2.67% of RAB).
Evaluasi Kebutuhan Air Bersih Untuk Masyarakat di Kecamatan Binjai Timur Muhammad Mufti Farabi; Mahliza Nasution; Nuril Mahda Rangkuti
JURNAL INERSIA Vol. 15 No. 2 (2023): Jurnal Inersia
Publisher : POLITEKNIK NEGERI SAMARINDA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46964/inersia.v15i2.909

Abstract

Dengan bertambahnya jumlah penduduk dan bertambahnya jumlah kawasan industri setiap tahunnya, kebutuhan akan air minum otomatis terus meningkat. Pada Kabupaten Binjai Timur, Provinsi Sumatera Utara keberadaan penyedia layanan air minum masih belum memenuhi syarat. Hal ini terjadi karena masih banyak warga yang memanfaatkan sumber air bawah tanah (sumur gali) sebagai salah satu sumber utama air minum. Melihat permasalahan tersebut, penulis ingin melakukan evaluasi kebutuhan air minum di Kabupaten Binjai Timur pada tahun 2027 dan cakupan pelayanan air minum di Kabupaten Binjai Timur pada tahun 2027. Berdasarkan hasil penelitian yang dilakukan, kebutuhan air bersih berdasarkan jumlah penduduk Kabupaten Binjai Timur pada tahun 2027 adalah sebesar 109.612 liter/detik, sedangkan kebutuhan air bersih berdasarkan jumlah pelanggan di Kabupaten Binjai Timur pada tahun 2027. Tahun 2027 adalah 18,018 liter/detik. Sedangkan cakupan pelayanan Perusahaan M pada tahun 2027 sebesar 17,946% dengan penjelasan sebanyak 66.227 jiwa, dari total penduduk Kecamatan Binjai Timur jumlah masyarakat yang menggunakan jasa Perusahaan M untuk keperluan sehari-hari hanya sebanyak 11.326 orang. Sisanya sebanyak 54.342 jiwa masih menggunakan cara mandiri untuk mendapatkan air bersih.
Analisa koordinasi simpang bersinyal pada jalan M.H.Thamrin - Prof. H.H.Yamin dan Sutomo – Prof.H.M.Yamin Prima Pranata Tarigan, Yoel; Mahda Rangkuti, Nuril
Sultra Civil Engineering Journal (SCiEJ) Vol 6 No 1 (2025): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/sciej.v6i1.982

Abstract

How is the performance of Jalan M.H.Thamrin and Jalan Sutomo 2. How is the performance of the two intersections after being coordinated 3. How to compare the performance of the two intersections before and after being coordinated by the research location was carried out on Jalan Prof. H. M. Yamin, the survey will be conducted for 3 days which is divided into 2 working days/weekday and 1 weekend/weekend and data collection will be carried out at the peak time of the vehicle based on the coordination engineering of the two intersections that are simulated obtained a comparison of the performance of the two average intersections in existing conditions (before coordination) and after coordination that has been presented in Table 4.28. The condition of the intersection after coordination is the result of adjusting the Cycel Time Simpang Jalan M.H.Thamrin to Cycel Time Simpang Jalan Sutomo. With the enactment of the intersection coordination engineering that is in this planning can reduce the average saturated degree of average 0.70 to 0.65, reduce the length of the queue which was originally 196.23 meters to 195.07 meters, and can reduce the degree which was originally 32.81 seconds/junior high school with the level of service D to 28.69 seconds/junior high school with the service level D. can be drawn as follows: 1. Cycle Time Existing conditions or before the enactment of the intersection coordination, namely, • M.H.Thamrin Street intersection has a cycle of 82 seconds, •
ANALISIS RENCANA ANGGARAN BIAYA PELAKSANAAN PEMBANGUNAN KOPERASI TKBM PELABUHAN BELAWAN Hakim, Muhammad Sultan; Ardan, Melloukey; Rangkuti, Nuril Mahda
Jurnal Teknik Sipil Vol 3, No 1 (2024): Edisi Juni
Publisher : Universitas Islam Sumatera Utara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30743/jtsip.v3i1.9547

Abstract

Penelitian ini penulis melakukan analisis perbandingan harga antara Rencana Anggaran Biaya (RAB) dan Rencana Anggaran Pelaksanaan (RAP) terhadap SNI. Diadakan nya penelitian ini agar bermanfaat bagi pelaku jasa konstruksi maupun mahasiswa dalam merencanakan biaya dengan nilai ekonomis. Dengan perkembangan pembangunan infrastruktur di daerah Sumatera Utara yang cukup tinggi, Medan menjadi salah satu kota yang berpotensi akan pembangunannya. sehingga menyebabkan banyak nya para pengusaha developer memanfaatkan peluang ini. Penelitian ini juga bermanfaat untuk menemukan analisa perbandingan antara harga Rencana Anggaran Biaya, SNI dengan harga Rencana Anggaran Pelaksanaan (biaya nyata), yang nanti nya akan bermanfaat bagi pelaku jasa konstruksi sebagai bahan pertimbang untuk hasil estimasi biaya yang lebih ekonomis, mempermudah kontraktor dalam menentukan besar nya nilai tender.Penelitian ini bertujuan untuk mendapatkan nilai ekonomis berdasarkan hasil perbandingan antara harga Rencana Anggaran Biaya, SNI dengan harga Rencana Anggaran Pelaksanaan pada Pembangunan Koperasi TKBM Pelabuhan Belawan.Berdasarkan hasil analisa, diperoleh nilai akurasi RAB terhadap SNI sebesar 91.11%,  dan RAP terhadap SNI sebesar 74.38 %. Dengan ini tingkat akurasi tebesar yaitu RAB terhadap SNI sebesar 91.11%.
Digitalisasi Layanan Pustaka melalui Penerapan Sistem Informasi Pengelolaan Pengunjung Berbasis Web di TBM Al-Azhari Resvi Apriani Siregar; Susilawati; Stephanus Priyowidodo; Nuril Mahda Rangkuti; Ninny Siregar
Mitra Jurnal Pengabdian Masyarakat Multidisiplin (MJPMM) Vol. 2 No. 1 (2026): Maret
Publisher : Marasofi International Media and Publishing (MIMP)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.64123/mjpmm.v2.i1.2

Abstract

Taman Baca Masyarakat (TBM) Al-Azhari Medan merupakan perpustakaan masyarakat sebagai sarana literasi yang terbuka untuk umum dan memiliki peran penting dalam mendukung kegiatan belajar dan membaca masyarakat. Namun tata kelola administrasinya masih menghadapi kendala akibat penggunaan sistem pencatatan pengunjung yang masih manual. Hal ini berdampak pada rendahnya keamanan data, inefisiensi penyimpanan, serta beban kerja ganda (redundant work) dalam rekapitulasi pelaporan. Pengabdian ini bertujuan memodernisasi tata kelola tersebut melalui pengembangan dan implementasi Sistem Informasi Pengelolaan Pengunjung Berbasis Web yang disesuaikan dengan kebutuhan mitra. Melalui metode pengembangan sistem serta pelatihan dan pendampingan intensif, kegiatan ini berhasil menggantikan mekanisme buku tamu konvensional dengan platform digital yang terintegrasi. Hasil kegiatan menunjukkan peningkatan kompetensi mitra dalam mengoperasikan sistem secara mandiri, mulai dari input data hingga otomasi laporan statistik, yang secara bersamaan meningkatkan efisiensi operasional, kecepatan akses data historis, serta menjamin akurasi dan keamanan data administrasi di TBM Al-Azhari.