Claim Missing Document
Check
Articles

Found 34 Documents
Search

Analysis of Flood Discharge and Water Level of the Babon River in Semarang Muhamad Fakhrurrozi; Esti Wulandari; Laksono Djoko Nugroho
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 10 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i10.284

Abstract

This study aims to determine the toll rates desired by the people of Gresik Regency based on the value of Ability to Pay (ATP) and Willingness to Pay (WTP) on the Krian – Legundi – Bunder (KLB) Toll Road. Through traffic count surveys and Road Side Interviews (RSI) at toll gates and arterial roads, data on vehicle population, payment ability, and user preferences for existing toll rates were obtained. The analysis employed a Logit model to evaluate the relationship between the ATP and WTP values and their correlation with the current toll rates. The results revealed that both the WTP and ATP of the community were lower than the existing toll tariff. Specifically, the study found that the optimal toll rate for users would be Rp. 1,100/km, which is 26.96% lower than the current rate of Rp. 1,506/km. This adjustment not only aligns better with the financial capacities of the users but also presents an opportunity for revenue optimization. By lowering the toll rate, it is predicted that increased traffic volume could compensate for the reduced fee, ultimately benefiting both the toll operator and the community. In conclusion, establishing a toll rate that reflects user preferences is crucial for enhancing accessibility and ensuring sustainable revenue generation for infrastructure development.
Analysis of Determining Road Damage Repair Methods Based on Availability of Budget on the Road Segment of East Java Province Jarwoto Jarwoto; Esti Wulandari; Laksono Djoko Nugroho
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 12 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i12.317

Abstract

Pavement damage on the Maospati - Magetan - Cemorosewu Road is severe, with issues such as potholes, surface deformation, peeling asphalt layers, and structural deflections due to heavy vehicle loads. These conditions pose significant risks, particularly during the rainy season, leading to hazardous driving conditions. This research aims to analyze the extent of road surface damage and recommend appropriate maintenance solutions using the PKRMS (Provincial/District Road Management System) method and the Bina Marga method. Data were collected through field surveys and official agency reports to assess road conditions. The findings indicate that the overall road condition is relatively good, with low levels of damage. Based on the Bina Marga and PKRMS assessments, routine maintenance is the most suitable repair strategy to prevent further deterioration and enhance road safety. The research underscores the importance of proactive and regular road maintenance planning to ensure long-term road durability. Future research should explore cost optimization strategies and predictive maintenance models to improve infrastructure sustainability.
Performance Analysis and Operation and Maintenance Cost Requirements for Rapak Di Drainage Maya Yusnita; Esti Wulandari; Laksono Djoko Nugroho
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 12 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i12.319

Abstract

Inadequate drainage infrastructure often leads to waterlogging during rainfall, emphasizing the need for urgent repairs. This study assesses the performance condition of the Rapak Dalam Drainage system using a quantitative and qualitative approach, including field observations, direct measurements, and hydrological data analysis. The findings indicate that the drainage system is rated at a "Good" performance level, with a functional capability of 80.56%. Although the system effectively manages water in most areas, certain components require immediate repairs to maintain optimal functionality. To enhance drainage performance, this study recommends routine inspections, timely maintenance, and sediment management to prevent blockages. Additionally, upgrading drainage infrastructure, optimizing water flow through improved design, and implementing community-based maintenance programs are suggested to ensure long-term efficiency. These measures will help mitigate flooding risks and improve urban water management in Samarinda.
Time and Cost Control Analysis of Disaster Emergency Response Handling Project Construction in Mojokerto District Using Critical Path Method Ean Fadhillah Nurrahmat; Esti Wulandari; Laksono Djoko Nugroho
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 1 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i1.331

Abstract

Landslides along the Sumber Pasinan River in Mojokerto Regency, East Java, pose significant risks due to soil erosion and increased flooding during the rainy season. This study aims to analyze the acceleration of construction for a disaster emergency response project using the Critical Path Method (CPM) to minimize time and costs. Employing a quantitative research approach, primary data was gathered through direct observations at the project site, complemented by secondary data from relevant literature and project documents. The findings indicate that the implementation period was successfully reduced from 71 working days to 47 days, achieving a time acceleration of 24 days. This required the addition of 11 workers for the critical task of installing river stone masonry, which constituted 70.16% of the project's workload. The application of CPM proved effective in managing time and resources efficiently. The implications of this research highlight the importance of employing structured project management methodologies in disaster response construction projects. By demonstrating the effectiveness of CPM in accelerating project timelines while controlling costs, this study provides a valuable reference for future projects facing similar challenges. It also opens avenues for further research into the long-term impacts of workforce augmentation on project quality and cost-effectiveness in disaster management contexts.
Analysis of Delays in Construction Time of the Banjarsari Water Gate Project, Sidoarjo District Using Critical Path Method Dwi Erry Nopriyanto; Esti Wulandari; Laksono Djoko Nugroho
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 1 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i1.334

Abstract

The Banjarsari sluice gate, located on the Sidoarjo district's shipping river, faces various challenges that can affect its performance. These challenges include sedimentation, damage to building structures, and decreased water quality due to domestic and industrial waste. The implementation of the Banjarsari Water Gate maintenance project, especially the floor work, experienced seepage at the bottom of the water gate floor, resulting in structural failure of the water gate building. CPM method duration planning is a recommendation in choosing from the many methods available, because there is a calculation of the earliest time the project starts, the latest time the project begins, the earliest time completed, and the latest time completed, so that the time lag of all activities can be known. Analyze the acceleration of work duration by adding workers to the work on the critical path. The purpose of this research is to analyze the length of time required by the CPM (Critical Path Method) method for the work of the Banjarsari floodgate. In this study, the time analysis uses the CPM (Critical Path Method) method and is assisted by Microsoft Project 2021 Software. The analysis results obtained work through the critical path, namely demolition work and cyclope concrete casting, and obtained the results of the duration of work on the Banjarsari floodgate work after crashing to 66 working days from the initial duration of 72 working days.
Analysis of Delays in the Construction Project of the Pumping House in the Sumenep District Using the Critical Path Method Jenodius Aldino John; Esti Wulandari; Laksono Djoko Nugroho
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 1 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i1.335

Abstract

Delays in construction projects pose significant challenges, particularly in remote areas like the Sumenep District. This research analyzed the pump house construction project delays using the Critical Path Method (CPM) to identify the primary factors causing delays, including material supply issues and labor shortages. A qualitative descriptive approach was employed, involving in-depth interviews with project stakeholders and analysis of project documents, including weekly reports and schedules. The findings indicated that the project experienced an average delay of two weeks, primarily due to delays in material supply from Surabaya and concurrent labor shortages caused by multiple simultaneous projects. To address these challenges, the study proposed solutions such as strengthening logistics coordination with local suppliers, increasing the workforce on critical tasks, and utilizing additional heavy equipment. The implications of this research highlight the importance of effective time and resource management in construction projects, particularly in remote locations. Applying the CPM method, this study identifies the root causes of delays and provides practical strategies to enhance project efficiency and reduce costs. This research contributes to the existing literature on construction management in Indonesia, emphasizing the need for adaptive approaches tailored to local conditions.
DRAINAGE STUDY OF WAREHOUSE DEVELOPMENT PT. ANEKA INDUSTRI, SIDOARJO DISTRICT Ikko Bagus Ismanto; Laksono Djoko Nugroho; Wateno Oetomo
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 4 (2022): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i4.459

Abstract

The PT. Aneka Industri warehouse is located on a level with a slope of approximately 0-1%. Survey results from PT. Aneka Industri Warehouse in Tambaksawah Village, Waru District, Sidoarjo Regency, showed a height of -0.20m, slightly above the flood level of -0.10m. The area is likely to flood due to the overflow of Afvoer Bunung, which flows out from other areas (runoff water) during heavy rains. In addition, the storage area is a dense industrial area, and the chance of rainwater infiltration and loss is small. According to the analysis, the flood discharge of Afvoer Buntung during the 25-year return period is 193,305 m3/s. Meanwhile, the cross-sectional capacity of Afvoer Buntung is 25.707 m3/s, so the cross-section of Afvoer Buntung at the storage site of PT. Aneka Industri is flooded. It rains for t = 30 minutes, total volume = 297.57 m3.
Road Handling Priority Analysis Using Provincial/District Roads Management System Application and Analytical Hierarchy Process Method Nur Aini Farida; Laksono Djoko Nugroho; Haris Muhammadun
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1567

Abstract

This study aims to determine the priority of road handling in East Java Province by integrating the Provincial/District Roads Management System (PKRMS) application and the Analytical Hierarchy Process (AHP) method. Road condition data is obtained from PKRMS, including the physical condition of the road, traffic volume, and other parameters. The main criteria used in the AHP analysis are road condition, volume capacity ratio (VCR), connectivity, land use and priority areas of East Java Province. Each criterion was assessed and weighted based on its level of importance to produce road handling priorities.  The results showed that the integration of PKRMS and AHP was able to produce a more accurate order of road handling priorities in accordance with strategic needs. In the UPT PJJ Surabaya Road Section, road improvement priorities are arranged based on the Triggered Priority Index (TPI) value obtained from the combined analysis. This research also provides cost estimates for each road section, which helps with more efficient budget planning.  With this approach, it is expected that road management in East Java Province can be carried out more effectively, support inter-regional connectivity, and have a positive impact on economic growth.
Road Infrastructure Condition Analysis in Terms of Road Quality in Bengkulu City Sugeng Pujiyono; Laksono Djoko Nugroho; Haris Muhammadun
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1589

Abstract

The purpose of this research is to explain the analysis of road infrastructure conditions, in terms of road quality in Bengkulu City. The research method uses descriptive with qualitative approach, Research Subjects, are people and government institutions, key informants are all people or officials related to road infrastructure policy makers, traffic density and road quality, such as traffic police, transportation department, PUPR department, BPS Bengkulu City.  The results of the study explain that the level of traffic density in Bengkulu City is categorized as moderate (26 vehicles / km), the population density of Bengkulu City is known to be categorized as moderate, in accordance with the demographic situation (population density) calculated per square kilometer (Km²) in 2024 is 2,600 people / km², the quality of roads in Bengkulu City is well qualified, although there are several road sections that experience cracking. The occurrence of road cracks is found on 15 (fifteen) road sections amounting to 2.340%. The data shows that cracking does not significantly reduce road quality as there are still 97.660% of roads with good quality.
Analysis of the Probability of Successful Completion Time of the Penganten-Ngampal Road Reconstruction Project Using the PERT Method Akmal Puguh Al-Putro; Laksono Djoko Nugroho; Haris Muhammadun
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1598

Abstract

Infrastructure project delays are often a major challenge in the construction industry, including the Penganten - Ngampal Road Reconstruction project which experienced a 50-day delay from the initial target. This problem is caused by the uncertainty of external factors such as weather and limited resources. This research aims to calculate the probability of success of project completion time using quantitative descriptive method with Program Evaluation and Review Technique (PERT) approach. This method involves three estimates, namely optimistic, most likely, and pessimistic times to evaluate the average duration and critical path of the project. The data used consisted of project reports, field observations, and calculations using POM-QM software. The analysis shows that the project critical path consists of activities A, C, D, E, and F with a total duration of 60 days. The probability of completing the project within 60 days reached 98.21%, showing the effectiveness of the PERT method in managing time uncertainty.