Claim Missing Document
Check
Articles

Found 34 Documents
Search

Analysis of Clean Water Services in Dili City Based on Service Ratio Orlando Gomes; Esti Wulandari; Laksono Djoko Nugroho
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1602

Abstract

Adequate availability of clean water is an essential basic need for urban communities, including in Dili City, the capital of Timor Leste, as clean water supports health, hygiene, and various economic activities. However, Dili City faces a number of challenges in providing optimal clean water supply, such as rapid population growth, uncontrolled urbanization, inadequate infrastructure, and a distribution leakage rate of up to 30%, which causes difficulties in accessing clean water for some communities. This study aims to analyze the demand and availability of clean water in Dili City, and calculate the ratio of clean water services based on existing data, using a positivistic approach and theoretical-analytical and empirical-analytical methods. The results show that the demand for clean water in Dili City reaches 129,060 liters per second, with the highest production capacity in Comoro Village, but the distribution of clean water services is not evenly distributed. Becora Village has the highest service ratio, while Balibar Village shows a low ratio.
Time Control Analysis of the Construction of the Joyoboyo Intermodal Terminal Pedestrian Tunnel to the Surabaya Zoo I Ktut Riagung Sartiyana; Laksono Djoko Nugroho; Haris Muhammadun
JOURNAL OF HUMANITIES, SOCIAL SCIENCES AND BUSINESS Vol. 4 No. 2 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/jhssb.v4i2.1565

Abstract

The primary objective of this research is to examine the timeline for the construction of a pedestrian tunnel connecting the Joyoboyo Intermodal Terminal (TIJ) with the Surabaya Zoo (KBS). The construction of this tunnel is considered a crucial project aimed at enhancing accessibility and alleviating congestion along the Joyoboyo road. The estimated cost for this project is Rp 31,996,921,529.00 and it is scheduled to be completed within 135 calendar days. The results showed that the main factors of project delays were due to delays in the procurement of 40cm diameter piles, interference due to inundation due to undetected PDAM pipes. Using the CPM method, the identification of the critical trajectory enabled the optimisation of the project duration and reduced the risk of delays. In addition, incremental cost analysis showed the relationship between time acceleration and increased project cost. By identifying key factors causing delays and implementing strategic planning methodologies such as the CPM, the project was able to enhance efficiency and mitigate potential setbacks. Furthermore, the study shed light on the economic implications of time acceleration, emphasizing the importance of balancing speed with cost considerations in construction projects.
Analysis of Clean Water Demand in Telawang District, East Kotawaringin Regency Rakhmad Lastyanto; Laksono Djoko Nugroho; Esti Wulandari
Jurnal Teknik Indonesia Vol. 5 No. 4 (2026): Jurnal Teknik Indonesia
Publisher : Publica Scientific Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58860/jti.v5i4.1004

Abstract

Access to clean water is a fundamental community need that requires careful planning based on population growth and the capacity of existing water supply infrastructure. Telawang District, East Kotawaringin Regency, continues to face limitations in clean water services, as the existing non-PDAM water supply system serving the Ibu Kota Kecamatan (IKK, district administrative center) has a production capacity of only 10 L/s and serves 394 household connections, equivalent to approximately 1,576 people or 9.6% of the total population of 16,397. This study aimed to project population growth and estimate clean water demand to support the development of the Drinking Water Supply System (Sistem Penyediaan Air Minum, SPAM) within the Sebabi IKK service area, particularly Sebabi Village and Sumber Makmur Village. Data were collected through official documents and field surveys, while population projections were calculated using the geometric growth method in accordance with relevant water supply planning guidelines. The results indicated that the combined peak-hour water demand was projected to increase from 11.39 L/s in 2023 to 37.39 L/s in 2032 and 67.73 L/s in 2043. To meet the projected demand through 2032, the estimated raw water flow requirement was 35 L/s, which was increased to a design capacity of 40 L/s to account for pumping efficiency, while the proposed water treatment plant capacity was 35 L/s. The study concluded that projected population growth would substantially increase clean water demand, highlighting the need to expand SPAM infrastructure and align production and distribution capacities with future service requirements.
Analisis Biaya dan Waktu pada Perencanaan Bangunan Utama Daerah Irigasi Kedung Lawang Kabupaten Banyuwangi Revin Iqbal Ramadhan; Laksono Djoko Nugroho; Esti Wulandari
Jurnal Spesialis Teknik Sipil (JSpTS) Vol. 7 No. 2 (2026)
Publisher : Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction of the main irrigation area structures requires precise technical planning as well as cost and time analysis to support the effectiveness and efficiency of the construction implementation. In the Kedung Lawang, Banyuwangi Regency, the construction of the main structures is planned to support the fulfillment of irrigation water needs in the downstream of the Irrigation Area. Therefore, an analysis of the main building planning is needed, considering technical aspects, selection of alternative materials, construction cost requirements, and the duration of the work implementation. This research aims to analyze the planning of the main building and examine the cost and time requirements based on the specified planning alternatives. The research method uses a quantitative descriptive approach by utilizing primary and secondary data. Cost analysis is conducted through the calculation of work volume, AHSP, and the preparation of the Bill of Quantity. Time analysis is carried out by considering productivity, the duration of each task, and the interrelationships between activities to develop the implementation schedule. The expected outcome of this research is to obtain the cost and duration requirements from the planning so that can be identified to be more efficient without reducing the function, quality, and technical requirements of the building. This research is expected to be as a consideration for planners and the government in determining economical and effective planning alternatives for the main structures of the Kedung Lawang Irrigation Area.