Claim Missing Document
Check
Articles

Found 16 Documents
Search

Perencanaan Penjadwalan Preventive Maintenance Mesin Pounch dengan Critical Path Method di PT. Grafika Nusantara Yuli Setiawannie; Nita Marikena
INSOLOGI: Jurnal Sains dan Teknologi Vol. 1 No. 1 (2022): Februari 2022
Publisher : Yayasan Literasi Sains Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (336.404 KB) | DOI: 10.55123/insologi.v1i1.105

Abstract

Maintenance is one of the main activities in the manufacturing sector that greatly affects the quality and quantity of production, production costs, and customer satisfaction. Thus, it is necessary to plan a preventive maintenance schedule to maintain the condition of the machine so that the production process runs optimally. PT. Grafika Nusantara is a paper management industry company specializing in continuous form, printing, and office stationery, whose production process runs continuously. In the production process, the company often has problems with the punch machine, which is one of the machines in the factory as a printer for paper into envelopes. The problem is due to lack of supervision and maintenance on the punch machine by the company can result in the machine being damaged and the production target not being achieved. The objective of this paper is to plan preventive maintenance scheduling on the punch machine with the Critical Path Method (CPM) and to determine the cost of preventive maintenance for 1 year. The results that can be concluded in this study are that the maintenance scheduling of the punch machine with the CPM method can save maintenance time, which is 30 hours and the cost of preventive maintenance for 1 year is Rp. 1,400,000.
Focus Group Discussion Kualitas Air Danau Toba dalam Penentuan Status Trofik Danau Toba Nita Marikena; Susilawati; Yuli Setiawannie
ABDIKAN: Jurnal Pengabdian Masyarakat Bidang Sains dan Teknologi Vol. 1 No. 3 (2022): Agustus 2022
Publisher : Yayasan Literasi Sains Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55123/abdikan.v1i3.814

Abstract

Lake Toba is a tecto-volcanic lake located in the province of North Sumatra, Indonesia. This lake is the largest lake in Indonesia and Southeast Asia (disbudpar, 2019). Lake Toba has ecotourism, namely Leuser National Park and Forest Area with Special Purpose Aek Nauli, Kawasan Strategi Pariwisata Nasional (KSPN)/Kawasan Pengembangan Pariwisata Nasional (KKPN), namely Lake Toba and its surroundings, and Geopark consisting of Toba Caldera Geopark. This is what makes Lake Toba a tourism potential and a direction of development that needs attention. Currently, the Lake Toba Water Quality Standard is set to Class One as contained in the Governor of North Sumatra Regulation Number 1 of 2009 and the trophic status of Lake Toba is Oligotrophic as contained in the Decree of the Governor of North Sumatra Number 188.44/209/KPTS/2017. The determination of the water quality standard of Lake Toba to be Class One as contained in the Governor of North Sumatra Regulation Number 1 of 2009 and the trophic status of Lake Toba is Oligotrophic as contained in the Decree of the Governor of North Sumatra Number 188.44/209/KPTS/2017 currently does not meet. The purpose of this Focus Group Discussion (FGD) is to get input from FGD participants regarding the water quality and trophic status of Lake Toba. The method implemented is in the form of discussion that discusses the quality of water in Lake Toba. Based on the results of the Focus Group Discussion (FGD), the water quality of Lake Toba leads to the Class Two quality standard and the Trophic Status of Lake Toba leads to Mesotrophs. This is influenced by human activities around the Lake Toba area and natural factors. The impact of decreasing water quality of Lake Toba will be increasingly influenced by the determination of Lake Toba as a Kawasan Strategi Pariwisata Nasional super prioritas. The decline in the water quality of Lake Toba can be managed with the cooperation of all parties, namely the community, businessmen and the government, such as the use of technology, environmental conservation, compliance with permits and others.  
Evaluasi Postur Kerja Menggunakan Metode RULA Pada Aktivitas Bongkar Muat di CV. Karyatama Perintis Fajar Dicky Alfiansyah Dicky; Nita Marikena
Journal Technology and Industrial Engineering (JTIE) Vol. 1 No. 2 (2023): Maret: Technology and Industrial Engineering
Publisher : Research Institute of Science, Technology and Art (RISTecArt)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (723.882 KB) | DOI: 10.59840/jtie.v1i2.128

Abstract

Satu di antara proses logistik yang utama adalah kegiatan proses bongkar muat ( manual material handling ), Proses manual material handling pada aktivitas bongkar muat terbagi atas 2 proses yaitu proses bongkar barang dan proses muat barang. Pada penelitian ini difokuskan pada proses bongkar barang sebaliknya. Aktivitas ini rentan terhadap terjadi nya cidera pada pekerja. beresiko pada muskuloskeletal yang biasa disebut dengan musculoskeletal disorders (MSDs) Tujuan penelitian ini untuk mengidentifikasi dan mengevaluasi postur kerja akibat dari aktvitas bongkar barang Metode yang digunakan adalah RULA (Rapid Upper Limb Assessment), menilai postur, gerakan dan gaya pada aktivitas kerja berdasarkan penilaian dari RULA untuk gangguan pada anggota tubuh bagian atas yaitu postur (pergelangan tangan, lengan atas, lengan bawah, perputaran pergelangan tangan, posisi kaki, leher dan punggung) setelah itu menentukan level resiko berdasarkan hasil dari skor akhir bahwa postur tubuh tersebut diperlukan perbaikan atau tidak. Hasil dari perhitungan dengan metode RULA diperoleh bahwa pekerja untuk postur tubuh memiliki nilai 4 pada penilaian skor akhir maka dari itu dalam katagori level resiko 2 yang menunjukan adanya penyelidikan dan perbaikan dibutuhkan. Hal tersebut dipengaruhi oleh postur tubuh yang tidak ergonomis (membungkuk dan menahan beban yang berat ). Kesimpulan dari hasil penelitian ini ialah postur kerja MMH pada CV. Karyatama Perintis Fajar diperlukan adanya penyelidikan dan perbaikan dibutuhkan. Saran yang dapat penulis berikan yaitu mengadakan evaluasi metode dan sistem kerja dan perancangan fasilitas kerja.
Konsultasi Publik Kegiatan Revitalisasi Gedung Cagar Budaya Nita Marikena; Yuli Setiawannie
ABDIKAN: Jurnal Pengabdian Masyarakat Bidang Sains dan Teknologi Vol. 2 No. 1 (2023): Februari 2023
Publisher : Yayasan Literasi Sains Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55123/abdikan.v2i1.1647

Abstract

The Wharen Huis Building is a building protected by Law Number 11 of 2010 and the Mayor of Medan Decree Number 433/28.K/X/2021. As a preservation and protection effort that will create an optimal function while protecting or maintaining the authenticity of the Wharen Huis Building as a Cultural Heritage of Medan City, the Government of Medan City through the Housing, Residential Areas and Spatial Planning Office of Medan City plans to revitalize the Wharen Huis Cultural Heritage Building by not violating the applicable theories and regulations related to historic building conservation efforts. The Wharen Huis Heritage Building Revitalization/Restoration Activity Plan consists of 3 (three) stages of activity, namely the pre-construction stage, the construction stage, and the operational stage. Each stage of these activities is predicted to have an impact on the environment. Based on the Regulation of the Minister of State for the Environment No. 4 of 2021, the Revitalization of the Wharen Huis Cultural Heritage Building must have a Type C Environmental Impact Analysis (AMDAL). Referring to Government Regulation Number 22 of 2021, those in charge of businesses and/or activities in preparing an EIA must go through the stages of public consultation. The results of the public consultation obtained input related to building ownership, transportation circulation and support for the preservation of cultural heritage. Public consultation activities obtained several important issues that became input in public consultation activities, including the following 1. Regarding the revitalization of the Wharen Huis Cultural Heritage Building, the Medan City Government should be able to coordinate or communicate with the building owner in terms of managing the building, 2. In its construction, there will be an impact that the circulation of transportation passing through the building must be disturbed, it should be necessary to place parking bags to the west of the building that still exists and 3. we are very enthusiastic and supportive in revitalizing this building as an example for the public interest and become something different in terms of learning historical buildings in Medan City.
Penyusunan Rencana Persediaan dan Perkiraan Kebutuhan Kapasitas Jangka Panjang di PT.X Nita Marikena; Yuli Setiawannie
INSOLOGI: Jurnal Sains dan Teknologi Vol. 2 No. 1 (2023): Februari 2023
Publisher : Yayasan Literasi Sains Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55123/insologi.v2i1.1414

Abstract

Production capacity planning is part of operations management that is realistic and applicable, so estimates of production capacity originating from forecasting consumer demand for these products must be known in advance so that companies can use resources effectively, in terms of quantity, time, and costs used for the production process. PT. X is a company that produces products in two groups, namely Product Group-I and Product Group-II. Product Group-I consists of two types of products, namely Product A and Product B, while Product Group-II consists of Product C and Product D. The Company is still experiencing difficulties in meeting consumer demand for these two product groups for the long term. This study aims to determine the total estimated consumer demand for two product groups within one year and the number of production machines needed to optimize the production process. Based on the results of calculations and analysis, the total estimated demand for Product Group-I for 12 months is 2216 units with a production time of 1520 hours. Meanwhile, the total estimated demand for Product Group-II for 12 months is 2,896 units with a production time of 1,709 hours. To meet consumer demand, PT. X must provide 2 units of production machines that are operated in parallel.
Analisis Postur Kerja Operator Mesin Bubut Menggunakan Metode RULA Pada PT. Amin Jaya Teknik Dian Prasetio; Nita Marikena
Industrial Engineering System and Management Journal Vol. 4 No. 2 (2023): Vol 4 No 2 Agustus 2023
Publisher : LPPM Universitas Potensi Utama

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Amin Jaya Teknik adalah perusahaan yang bergerak di bidang pembuatan spare part mesin Pabrik Kelapa Sawit (PKS). Dalam kegiatan operasionalnya pada perusahaan ini masih terdapat operator-operator yang bekerja dalam posisi yang kurang ergonomis, salah satunya pada operator mesin bubut. Keluhan yang dirasakan oleh operator tersebut adalah keluhan ketidaknyamanan, kelelahan dan rasa sakit yang yang dirasakan oleh operator. Keluhan sakit yang dialami operator paling banyak terjadi pada tubuh bagian atas yaitu pinggang dan leher. Tujuan dari penelitian ini adalah untuk mengetahui keluhan-keluhan musculoskeletal disorders yang dialamai operator mesin bubut dan untuk mengetahui keadaan postur kerja operator mesin bubut pada PT. Amin Jaya Teknik berdasarkan nilai RULA. Hasil kuesioner Nordic Body Map menunjukkan keluhan-keluhan yang dirasakan oleh operator mesin bubut sesaat setelah melakukan pekerjaan adalah rasa sakit pada leher bagian atas, kemudian sakit pada punggung, dan sakit pada kaki kanan juga kaki kiri. Rasa-rasa sakit tersebut muncul dikarenakan adanya gerakan repetitif atau kegiatan kerja yang monoton dan secara terus menerus berulang. Hasil perhitungan menunjuakan kondisi postur tubuh operator mesin bubut dengan kor RULA yaitu 6 dengan Action Level yaitu 3 yang menunjukkan bahwa perlu dilakukan pemeriksaan dan perubahan pada posisi kerja operator saat ini.
Capacity Requirement Planning Produk Mainan Kereta Api Pada PT. X Nita Marikena; Tiara Rahmania
Industrial Engineering System and Management Journal Vol. 1 No. 1 (2019): Vol 1 No 1 Februari 2019
Publisher : LPPM Universitas Potensi Utama

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

P.X adalah perusahan manufaktur yang memproduksi mainan anak-anak salah satunya adalah mainan kereta api. Menjaga ketersediaan bahan baku dan produk untuk memenuhi permintaan pasar merupakan strategi pemasaran yang harus dipenuhi oleh PT.X untuk menjaga eksistensi perusahaan. Perencanaan Kebutuhan Kapasitas atau Capacity Requirement Planning (CRP) merupakan metode perhitungan yang digunakan untuk menentukan kapasitas yang lebih rinci yang diperlukan oleh perencanaan kebutuhan material (Material Requirement Planning/MRP). Adapun tujuan dilakukan penelitian ini agar perusahaan mampu menyusun perencanaan kebutuhan kapasitas produksi berdasarkan kapasitas produksi yang tersedia sehingga dapat memenuhi permintaan pasar sesuai dengan jumlah dan waktu yang ditetapkan. Berdasarkan hasil perhitungan perencanaan kebutuhan kapasitas pada PT.X diperoleh hasil bahwa pada stasiun kerja perakitan body bawah dan perakitan dinamo yang mengalami kekurangan kapasitas. perbandingan sedangkan stasiun kerja yang lainnya mengalami kelebihan kapasitas. Kekurangan kapasitas pada stasiun kerja perakitan body bawah dan perakitan dinamo dapat diatasi dengan memberlakukan jam lembur atau sub kontrak dengan perusahaan lain.
Analisis Perancangan Perawatan Mesin Genset Pada PT.XYZ Dengan Metode Reliability Centered Maintenance (RCM) Ahmad Reza Pratama; Nita Marikena
Industrial Engineering System and Management Journal Vol. 5 No. 1 (2024): Vol 5 No 1 Februari 2024
Publisher : LPPM Universitas Potensi Utama

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. XYZ beroperasi 24 jam setiap harinya dalam mengolah produk minyak kelapa sawit dengan menggunakan mesin Fruit Cages, Stelizer Machine, Thresing Station Machine, Screw Press Machine dan mesin penunjang produksi yang lainnya untuk menghasilkan tenaga listrik seperti Genset, Turbin, Gas Engine dan untuk mesin yang menghasilkan steam (uap panas) seperti boiler. Mesin-mesin tersebut sangat penting dalam proses produksi minyak kelapa sawit untuk meningkatkan kapasitas produksi yang layak untuk dipasarkan. Permasalahan yang timbul diperusahaan ini adalah pada saat pemadaman listrik yang sering terjadi kerusakan pada mesin genset yang mengalami breakdown dan komponen-komponen mesin yang mengalami kerusakan sehingga hal ini dapat mengakibatkan jam kerja terhenti atau downtime. Penerapan metode RCM menguntungkan bagi manajemen operasional untuk meningkat, biaya perawatan mesin lebih rendah, usia komponen yang lebih Panjang. Pada Reability Centered Maintenance (RCM) adalah menyadari bahwa konsekuensi atau risiko kegagalan jauh lebih penting daripada karakteristik teknik itu sendiri. Maka dapat 1 komponen kritis yaitu injektor dengan nilai RPN sebesar 180. Berdasarkan RCM decision worksheet. Untuk komponen injektor didapatkan bahwa selang waktu antar kerusakan sebesar 519,7505 jam, yang berarti komponen injektor akan mengalami kerusakan setelah broperasi selama 35,16 jam. Interval waktu perawatan berdasarkan perhitungan RCM untuk komponen yang memiliki kegagalan atau komponen kritis adalah komponen injektor dengan interval waktu perawatan perawatan selama 65,96 jam atau krang lebih 3 -4 hari saat operasional.
Evaluasi Kesehatan Dan Penerapan Keselamatan Kerja Dengan Metode Hirarc Pada CV. Draftindo Kreasi Utama Nurul Fahmi; Nita Marikena
Industrial Engineering System and Management Journal Vol. 5 No. 1 (2024): Vol 5 No 1 Februari 2024
Publisher : LPPM Universitas Potensi Utama

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

CV. Draftindo Kreasi Utama adalah perusahaan yang bergerak dibidang Propeller (Baling-Baling kapal). Resiko kecelekaan akibat ketika kerja pada perusahaan ini cukup tinggi dikarekanakan perusahaan ini tidak banyak menggunakan alat-alat modern. Penelitian ini berttujuan untuk mengevaluasi Kesehatan dan Keselamatan Kerja (K3) pada perusahaan.Kesehatan dan Keselamatan Kerja (K3) yang dilakukan oleh CV. Draftindo Kreasi Utama saat ini masih belum maksimal. Hal ini dikarenakan masih terdapat kecelakaan kerja yang dialami oleh pekerja pada saat melakukan aktivitas kerja.berdasarkan identifikasi bahaya ada 5 aktivitas dengan 8 rincian aktivitas memiliki 10 potensi bahaya dengan penilaian resiko rendah, sedang, tinggi dan ekstrim. Dari perhitungan risk assessment persentase perhitungan penilaian resiko adalah 10% untuk resiko rendah 30% untuk resiko sedang 40% untuk resiko tinggi dan 20% untuk resiko ekstrim pengendalian resiko (risk control) yang harus diterapkan oleah para pekerja adalah penggunaan APD sesuai dengan SOP yang berlaku.
Peningkatan Kualitas Jasa Service Kendaraan Di Bengkel FF Service Menggunakan Metode Quality Functions Deployment (QFD) Endrik Syahputra; Nita Marikena
Industrial Engineering System and Management Journal Vol. 5 No. 1 (2024): Vol 5 No 1 Februari 2024
Publisher : LPPM Universitas Potensi Utama

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini bertujuan untuk meningkatkan kualitas layanan service kendaraan di Bengkel FF Service dengan menerapkan Metode Quality Function Deployment (QFD). Bengkel FF Service adalah penyedia jasa perawatan kendaraan yang berkomitmen untuk memberikan pelayanan berkualitas kepada pelanggan mereka. Namun, mereka menghadapi tantangan dalam memahami sepenuhnya kebutuhan dan preferensi pelanggan serta mengintegrasikannya ke dalam proses perbaikan kendaraan. Metode QFD digunakan sebagai alat untuk mengidentifikasi dan menghubungkan kebutuhan pelanggan dengan proses perbaikan kendaraan yang ada di Bengkel FF Service. Penelitian ini melibatkan survei pelanggan, wawancara dengan teknisi, dan analisis data untuk mengidentifikasi aspek-aspek kualitas yang paling penting bagi pelanggan. Hasil dari penelitian ini kemudian digunakan untuk mengembangkan matriks QFD yang menghubungkan kebutuhan pelanggan dengan karakteristik teknis dan operasional dalam bengkel. Implementasi QFD di Bengkel FF Service diharapkan dapat meningkatkan pemahaman terhadap kebutuhan pelanggan, mengidentifikasi peluang perbaikan dalam proses perawatan kendaraan, dan akhirnya meningkatkan kualitas layanan secara keseluruhan. Penelitian ini diharapkan dapat memberikan panduan bagi bengkel lain yang ingin meningkatkan kualitas layanan mereka dengan menggabungkan perspektif pelanggan ke dalam proses perbaikan kendaraan.