Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja)

ANALISA METODE CRITICAL PATH METHOD PADA PROYEK PEMBANGUNAN ELYON CHRISTIAN SCHOOL SURABAYA Michella Beatrix
Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) Vol 7 No 2 (2019): Jurnal Ilmiah MITSU
Publisher : Fakultas Teknik, Universitas Wiraraja

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (229.828 KB) | DOI: 10.24929/ft.v7i2.721

Abstract

In every construction project implementation there are three important things that become the main focus, cost, quality and time. The planned and well-structured project completion time will determine the success of each project. In the project completion time planning things to note are the work items that pass through the critical path, this is because the work items that pass through the critical path are very influential on the project completion time which if the work items pass through the critical path are delayed then the project completion time will also be late. This study uses the Critical Path Method in the form of a network diagram using data on the Elyon Christian School Surabaya project. The results obtained in this study are 9 work items that are in the critical path, the work code B1-C1-D1-E1-F1-G1-H1-I1-I2.
FAKTOR PEYEBAB TERJADINYA DIRECT DAN INDIRECT WASTE PADA PROYEK BANGUNAN BERTINGKAT DI SURABAYA Michella Beatrix
Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) Vol 9 No 2 (2021): Jurnal Ilmiah MITSU
Publisher : Fakultas Teknik, Universitas Wiraraja

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24929/ft.v9i2.1024

Abstract

In construction projects, the occurrence of waste is something that will probably continue to happen. Waste that occurs can be large or small depending on the factors causing it and its impact, and this affects the implementation, especially for the contractor as a service provider. Many things can be a factor in the occurrence of waste, and cannot avoid. In the construction project of building in Surabaya, the occurrence of waste also often occurs and is influenced by several factors. Therefore this research focuses on the factors that cause construction waste (direct and serial waste) in projects of building in Surabaya. This study uses data distribution in the form of questionnaires to contractors in Surabaya with the limitation of company qualifications being medium to large contractor companies. Processing the questionnaire data that has been obtained using Multiple Regression Analysis. The results of this study are 3 factors that have the greatest influence on the occurrence of waste, namely the factor of handling, Other Factors, and Procurement Factors. The magnitude of these factors based on the research results is a handling factor of 35%, other factors at 23%, and a procurement factor of 17%.