ANALYSIS OF CRITERIA AFFECTING THE EFFECTIVENESS OF IMPLEMENTING SELF-MANAGED CONSTRUCTION PROJECTS BASED ON COMMUNITY EMPOWERMENT AND CONTRACTUALITY Suprapto, Aki’; Wulandari, Esti; Tjendani, Hanie Teki
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 3 No. 4 (2024): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v3i4.1279

Abstract

With the dominance of top-down development, the aspirations of the community's ideas in every stage of construction development are not perfectly absorbed, resulting in community antipathy towards every government policy. Therefore, to recreate public sympathy, the government released a program to strengthen village governance and development (P3PD) or better known as the village fund program. The AHP (Analytical Hierarchy Process) method is used to analyze the results of the questionnaire so that the weight value of the criteria and sub criteria can be known as the basis for selecting the implementation of construction activities. Based on the results of the analysis, the weight value of the criteria can be found as follows: quality criteria are the main criteria in the selection of construction projects with a weight of 0.235, cost with a weight of 0.203, time with a weight of 0.192, community participation with a weight of 0.144, labor with a weight of 0.117 and administration with a weight of 0.110.
Kaji Ulang : Puasa Wajib dan Puasa Sunnah Septiana, Vini Wela; Pratiwi, Sekar Harum; Wulandari, Esti; Septria, Metriani; Maiwinda, Guesa
Jurnal Media Ilmu Volume 3 No. 1 Juni 2024
Publisher : LPPM Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/jmi.v3i1.5590

Abstract

Bagi orang yang beriman ibadah puasa merupakan salah satu sarana penting untuk mencapai takwa, dan salah satu sebab untuk mendapatkan ampunan dosa-dosa, pelipatgandaan pahala kebaikan, dan pengangkatan derajat. Di zaman sekarang yang sudah semakin banyak pengaruh dari media sosial, banyak trend-trend menyesatkan yang diikuti oleh anak muda. Mokel salah satunya, yaitu membatalkan puasa dengan sengaja, kemudian mereka merekam aksinya serta mengupload ke media sosial. Maka dari itu, tujuan dari artikel ini adalah mengkaji ulang tentang apa itu puasa, apa saja hal yang membatalkannya, hikmahnya, dan macam-macam jenis puasa wajib maupun sunnah. Metode yang digunakan adalah Systematic Literrature Riview.
Acceleration Cost Analysis with Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1) Hartawan, Ade Sholeh; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.11

Abstract

In a construction project, preparation work typically includes tasks related to setting up work facilities, conducting field investigations, obtaining permits, and non-structural activities. The Jakarta Sewerage Development Project Zone 1, Package 2, which involves the construction of sewers in Area 1-1, is currently in the preparation phase and is experiencing challenges due to a complex permit process. This has led to minimal progress as the initial project planning did not consider the time needed to secure the necessary permits for implementation. The author is therefore evaluating the project timeline to gauge performance during the preparation phase before actual construction begins. This study utilizes the Critical Path Method (CPM) scheduling technique in Microsoft Project to pinpoint critical activities. Upon analysis, it was found that the budget plan for Package 2 of the Jakarta Sewerage Development Project (Zone 1) was detailed and included various work descriptions, with a total budget of IDR 862,292,086,196. However, delays have occurred, resulting in a 17-day setback in the project schedule, necessitating work acceleration. To bring the project duration back in line with the original schedule as per the contract, acceleration was required. This was carried out on the Shaft Construction C-8.1, which was initially set to take 80 days but was shortened to 63 days through time acceleration, incurring a cost of IDR 23,279,288.
Analysis of Investment Sensitivity in The Construction of The Gelora Bung Tomo Surabaya Circuit Sulistianto, Leo Agus; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.12

Abstract

Provision of Sports Prasarana is an attempt to fulfill the basic rights of the public to obtain services in sports activities, as listed in Law of the Republic of Indonesia Number 11 of 2022 concerning Sports 2022. The growing automotive industry is one important sector that significantly contributes to Indonesian economic growth. Based on the Surabaya City for 2021-2026 calls for the creation of an integrated area, with the Gelora Bung Tomo area serving as an international sports center and integrating with the growth of trade and service functions in Surabaya's surrounding areas. The aim of this study is to measure the amount of investment income and revenue limits in an effort to reduce the risks associated with the investment in the circuit. We carry out flow calculations using the Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP) methods, and then analyze the sensitivity. We reviewed the sensitivity analysis based on several parameters, including commercial rent income and circuit management costs. The development of Tomo's Gelora Circuit is sensitive to a loss of income from the rental of business or commercial premises of 8%, which will affect a decline in profit, resulting in a negative net present value (NPV) and prolonging the rate of return. Additionally, it is sensitive to an increase in management costs by 12%.
Analysis of Cost and Time To Complete of Office Project with The Earned Value Method: (Case study: Office of Bahtera Elang Perak Indonesia Surabaya) Nailufar, Linda; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.33

Abstract

The rescheduling of the initial schedule carried out on the Bahtera Elang Perak Indonesia Office Construction project has an impact on increasing the duration of work causing the project completion target to be delayed from the time it should be. Increasing the project completion target can affect the amount of costs incurred. The contract value for this office construction project is Rp. 13,908,226,157 with a work duration of 43 weeks to 54 weeks.  The current condition of work progress at week 31 is -0.225% while the total actual cost or that has been incurred during the work is Rp. 3,191,740,254. To overcome this, an analysis is carried out on the value of the estimate at complete (EAC) and time estimate (TE) of the Surabaya BEPI Office Construction Project using the earned value method. This method combines the elements of cost, schedule, and work performance.  The earned value method aims to determine the estimated cost and time of project completion. From the results of the analysis conducted in the 41st week, it was obtained that the estimated cost and time to complete the project implementation (EAC) was 14,289,833,105, - and the estimated time (TE) was 499 days, which was 121 days later than the original schedule.
Drainage Analysis of Pondok Jati Housing and Drainage Replanning Fathurokman, Hasan Alif; Wulandari, Esti; Laksono Djoko
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1558

Abstract

The Pondok Jati housing complex is less able to receive or accommodate rainwater discharge due to changes in channel dimensions, shallowing of channels, and dirt due to waste from people who do not care about the local environment. To anticipate this, it is necessary to repair and build infrastructure that functions as a flood controller according to the characteristics and conditions of the location. Efforts made for this are to redesign drainage at low cost. Hydrology and Hydraulics methods are applied to obtain a 5-year planned discharge and existing channel discharge, to plan channels with a 5-year planned return period. The existing channel discharge for the Pondok Jati housing complex is obtained as much as 0.450 m3/sec, and modeling is carried out in accordance with SNI 02-2406-1991: Procedures for general planning of urban drainage. With the redesign, the planned channel dimensions are obtained measuring 0.50 m x 0.75 m, in the form of a square without a cover.
Analysis of Clean Water Services in Dili City Based on Service Ratio Gomes, Orlando; Wulandari, Esti; Nugroho, Laksono Djoko
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1602

Abstract

Adequate availability of clean water is an essential basic need for urban communities, including in Dili City, the capital of Timor Leste, as clean water supports health, hygiene, and various economic activities. However, Dili City faces a number of challenges in providing optimal clean water supply, such as rapid population growth, uncontrolled urbanization, inadequate infrastructure, and a distribution leakage rate of up to 30%, which causes difficulties in accessing clean water for some communities. This study aims to analyze the demand and availability of clean water in Dili City, and calculate the ratio of clean water services based on existing data, using a positivistic approach and theoretical-analytical and empirical-analytical methods. The results show that the demand for clean water in Dili City reaches 129,060 liters per second, with the highest production capacity in Comoro Village, but the distribution of clean water services is not evenly distributed. Becora Village has the highest service ratio, while Balibar Village shows a low ratio.
Penerapan DAGUSIBU untuk Meningkatkan Kualitas Gizi dan Pencegahan Diare Bagi Siswa Sekolah Dasar melalui Dapur Sehat dan Budi Daya Susanti, Dini; Ekawati, Ridania; Septiana, Vini Wela; Pratiwi, Sekar Harum; Naldi, Jepri; Putri, Mia Dewindi; Wulandari, Esti
Menara Pengabdian Vol 5, No 1 (2025): Vol. 5 No. 1 Juni 2025
Publisher : LPPM Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/jmp.v5i1.6525

Abstract

Penerapan DAGUSIBU (Dapur Sehat dan Budi Daya) merupakan sebuah inisiatif untuk meningkatkan kualitas gizi dan pencegahan diare bagi siswa sekolah dasar. Program ini mengintegrasikan dua aspek penting, yaitu penyediaan makanan sehat melalui dapur sehat yang memprioritaskan bahan makanan bergizi dan pemanfaatan budi daya tanaman lokal yang dapat diolah menjadi sumber pangan bergizi. Dalam konteks pencegahan diare, DAGUSIBU bertujuan untuk meningkatkan pemahaman siswa tentang pentingnya konsumsi makanan bergizi dan kebersihan makanan serta lingkungan. Melalui implementasi program ini, siswa tidak hanya diajarkan untuk memahami pola makan yang sehat, tetapi juga dilibatkan dalam kegiatan budi daya tanaman yang mendukung ketersediaan bahan makanan bergizi di sekolah. Evaluasi program menunjukkan adanya peningkatan pengetahuan siswa mengenai pentingnya gizi seimbang, pengurangan kejadian diare, dan peningkatan keterampilan siswa dalam mengelola konsumsi makanan sehat. Program DAGUSIBU berpotensi menjadi model dalam pengelolaan gizi dan pencegahan penyakit berbasis sekolah yang melibatkan partisipasi aktif siswa si Sekolah Dasar / Madrasah Ibtidaiyah. 
Cost Analysis of Improving Urban Railway Services on Arjonegoro Commuter Setyarini, Ika Oktavia; Wulandari, Esti; Patriadi, Andi
Jurnal Teknik Indonesia Vol. 4 No. 3 (2025): Jurnal Teknik Indonesia
Publisher : Publica Scientific Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58860/jti.v3i4.753

Abstract

Improvement of train services will always develop along with the development of passenger demand. Likewise in the case of Arjonegoro Train as one of the mainstay urban trains in East Java. The development of local trains, especially Arjonegoro Train, triggers the public's desire to get optimal service. The increasing expectations of passengers can be the basis for planning to improve train services. However, every improvement plan also requires a mature budget and cost design so that the plan can be implemented properly. The data used in this study are primary and secondary data. 199 respondents were successfully obtained as primary data. This study uses descriptive analysis methods and literature studies in determining the service improvements needed and the cost of improving these services will be estimated. This study will examine the level of passenger satisfaction with 6 service variables to determine what services need to be improved from Arjonegoro Train. The results of the study showed that the service with the highest negative sentiment was in the availability of seats, availability of travel schedules, availability of platforms and availability of canopies. This can be mitigated by improving services in the form of adding 1 Trainset and improving the platform and canopy at the station with an estimated cost requirement for improving the Arjonegoro train service of Rp. 110,373,211,939.
Analysis of Urban Drainage System Based on Ponorogo City Spatial Planning Setiyo, Anugrah Dwi; Nugroho, Laksono Djoko; Wulandari, Esti
Jurnal Teknik Indonesia Vol. 4 No. 3 (2025): Jurnal Teknik Indonesia
Publisher : Publica Scientific Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58860/jti.v3i4.754

Abstract

The infrastructure problem in Ponorogo Regency is characterised by flooding in urban areas, which is attributable to deficiencies in the drainage system. The regions of Ponorogo City that are most susceptible to flooding include Jl. Pramuka, Jl. Jaksa Agung Suprapto, Jl. Bhayangkara, and Jl. Kbp Duriyat. The findings of the distribution suitability calculations for Ponorogo Rainfall Station over a period of 20 years demonstrate the validity of the calculations performed using the Log Pearson Type III method. Subsequently, the Normality Test was conducted in accordance with the Smirnov-Kolmogorov And Chi-Squared criteria. The Log Pearson Type III Method value was deemed to be acceptable. Consequently, the Log Pearson Type III Method was selected as the rainfall design based on a 10-year return period of 111,6819 mm. The results of the 10-year flood discharge analysis, with rational calculations for Jl. Pramuka Kanan at 0,879 m³/s, Jl. Pramuka Kiri at 0,949 m³/s, Jl. Jaksa Agung Suprapto Kanan at 0,662 m³/s, Jl. Suprapto Kiri at 0,722 m³/s, Jalan Bhayangkara Kanan at 0,520 m³/s, Jalan Bhayangkara Kiri at 0,654 m³/s, Jalan Kbp Duriyat Kanan at 0,574 m³/s, and Jalan Kbp Duriyat Kiri at 0,652 m³/s were observed. The calculation results indicate that the 10-year return period calculation discharge in the existing drainage channel exceeds the capacity, necessitating repairs. The repair was executed using U-Ditch 100 cm×100 cm for Jl. Pramuka Kanan, Jl. Pramuka Kiri, Jl. Jaksa Agung Suprapto Kanan, and Jl. Jaksa Agung Suprapto Kiri. In addition to the enhancements that have been made by utilising U-Ditch 80 cm×80 cm for Jl. Bhayangkara Kanan, Jl. Bhayangkara Kiri, Jl. KBP Duriyat Kanan and Jl. KBP Duriyat Kiri, further developments are anticipated.