ANALYSIS OF CRITERIA AFFECTING THE EFFECTIVENESS OF IMPLEMENTING SELF-MANAGED CONSTRUCTION PROJECTS BASED ON COMMUNITY EMPOWERMENT AND CONTRACTUALITY Suprapto, Aki’; Wulandari, Esti; Tjendani, Hanie Teki
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 3 No. 4 (2024): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v3i4.1279

Abstract

With the dominance of top-down development, the aspirations of the community's ideas in every stage of construction development are not perfectly absorbed, resulting in community antipathy towards every government policy. Therefore, to recreate public sympathy, the government released a program to strengthen village governance and development (P3PD) or better known as the village fund program. The AHP (Analytical Hierarchy Process) method is used to analyze the results of the questionnaire so that the weight value of the criteria and sub criteria can be known as the basis for selecting the implementation of construction activities. Based on the results of the analysis, the weight value of the criteria can be found as follows: quality criteria are the main criteria in the selection of construction projects with a weight of 0.235, cost with a weight of 0.203, time with a weight of 0.192, community participation with a weight of 0.144, labor with a weight of 0.117 and administration with a weight of 0.110.
STRATEGI PENGEMBANGAN SEKTOR USAHA MIKRO KECIL DAN MENENGAH (UMKM) KABUPATEN TULUNGAGUNG Widhajati, Eni; Wulandari, Esti
JAT : Journal Of Accounting and Tax Vol. 3 No. 1 (2024)
Publisher : Universitas Tulungagung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/jat.v3i1.1005

Abstract

Penelitian ini dilakukan untuk mengetahui strategi yang diterapkan Dinas Koperasi dan Usaha Mikro Kabupaten Tulungagung dalam mengembangkan sektor UMKM. Secara umum Dinas Koperasi dan Usaha Mikro telah menerapkan beberapa strategi melalui program kerja, namun nyatanya masih banyak UKM yang menghadapi kendala dalam pengembangan usahanya. Penelitian kualitatif digunakan sebagai metode penelitian. Metode analisis data penelitian ini menggunakan analisis SWOT. Hasil penelitian menunjukkan bahwa strategi yang dilaksanakan oleh Dinas Koperasi dan Usaha Mikro adalah melalui program kerja yaitu program pengembangan pemasaran produk perusahaan melalui katalog elektronik melalui e-katalog yang merupakan strategi perkuatan, pameran dan program pengembangan dan pemberdayaan usaha mikro dengan pelatihan kewirausahaan serta keunggulan UMKM yang dapat diimplikasikan dengan tujuan menciptakan suasana bisnis yang mendukung dengan kegiatan fasilitasi pengembangan UMKM di Kabupaten Tulungagung. Implikasi dari strategi yang dijalankan yaitu untuk meningkatkan keterampilan tenaga kerja dan pertumbuhan semangat kewirausahaan bagi peserta pelatihan dalam mengembangkan sektor UMKM.
Kaji Ulang : Puasa Wajib dan Puasa Sunnah Septiana, Vini Wela; Pratiwi, Sekar Harum; Wulandari, Esti; Septria, Metriani; Maiwinda, Guesa
Jurnal Media Ilmu Volume 3 No. 1 Juni 2024
Publisher : LPPM Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/jmi.v3i1.5590

Abstract

Bagi orang yang beriman ibadah puasa merupakan salah satu sarana penting untuk mencapai takwa, dan salah satu sebab untuk mendapatkan ampunan dosa-dosa, pelipatgandaan pahala kebaikan, dan pengangkatan derajat. Di zaman sekarang yang sudah semakin banyak pengaruh dari media sosial, banyak trend-trend menyesatkan yang diikuti oleh anak muda. Mokel salah satunya, yaitu membatalkan puasa dengan sengaja, kemudian mereka merekam aksinya serta mengupload ke media sosial. Maka dari itu, tujuan dari artikel ini adalah mengkaji ulang tentang apa itu puasa, apa saja hal yang membatalkannya, hikmahnya, dan macam-macam jenis puasa wajib maupun sunnah. Metode yang digunakan adalah Systematic Literrature Riview.
Acceleration Cost Analysis with Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1) Hartawan, Ade Sholeh; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.11

Abstract

In a construction project, preparation work typically includes tasks related to setting up work facilities, conducting field investigations, obtaining permits, and non-structural activities. The Jakarta Sewerage Development Project Zone 1, Package 2, which involves the construction of sewers in Area 1-1, is currently in the preparation phase and is experiencing challenges due to a complex permit process. This has led to minimal progress as the initial project planning did not consider the time needed to secure the necessary permits for implementation. The author is therefore evaluating the project timeline to gauge performance during the preparation phase before actual construction begins. This study utilizes the Critical Path Method (CPM) scheduling technique in Microsoft Project to pinpoint critical activities. Upon analysis, it was found that the budget plan for Package 2 of the Jakarta Sewerage Development Project (Zone 1) was detailed and included various work descriptions, with a total budget of IDR 862,292,086,196. However, delays have occurred, resulting in a 17-day setback in the project schedule, necessitating work acceleration. To bring the project duration back in line with the original schedule as per the contract, acceleration was required. This was carried out on the Shaft Construction C-8.1, which was initially set to take 80 days but was shortened to 63 days through time acceleration, incurring a cost of IDR 23,279,288.
Analysis of Investment Sensitivity in The Construction of The Gelora Bung Tomo Surabaya Circuit Sulistianto, Leo Agus; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.12

Abstract

Provision of Sports Prasarana is an attempt to fulfill the basic rights of the public to obtain services in sports activities, as listed in Law of the Republic of Indonesia Number 11 of 2022 concerning Sports 2022. The growing automotive industry is one important sector that significantly contributes to Indonesian economic growth. Based on the Surabaya City for 2021-2026 calls for the creation of an integrated area, with the Gelora Bung Tomo area serving as an international sports center and integrating with the growth of trade and service functions in Surabaya's surrounding areas. The aim of this study is to measure the amount of investment income and revenue limits in an effort to reduce the risks associated with the investment in the circuit. We carry out flow calculations using the Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP) methods, and then analyze the sensitivity. We reviewed the sensitivity analysis based on several parameters, including commercial rent income and circuit management costs. The development of Tomo's Gelora Circuit is sensitive to a loss of income from the rental of business or commercial premises of 8%, which will affect a decline in profit, resulting in a negative net present value (NPV) and prolonging the rate of return. Additionally, it is sensitive to an increase in management costs by 12%.
Analysis of Cost and Time To Complete of Office Project with The Earned Value Method: (Case study: Office of Bahtera Elang Perak Indonesia Surabaya) Nailufar, Linda; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.33

Abstract

The rescheduling of the initial schedule carried out on the Bahtera Elang Perak Indonesia Office Construction project has an impact on increasing the duration of work causing the project completion target to be delayed from the time it should be. Increasing the project completion target can affect the amount of costs incurred. The contract value for this office construction project is Rp. 13,908,226,157 with a work duration of 43 weeks to 54 weeks.  The current condition of work progress at week 31 is -0.225% while the total actual cost or that has been incurred during the work is Rp. 3,191,740,254. To overcome this, an analysis is carried out on the value of the estimate at complete (EAC) and time estimate (TE) of the Surabaya BEPI Office Construction Project using the earned value method. This method combines the elements of cost, schedule, and work performance.  The earned value method aims to determine the estimated cost and time of project completion. From the results of the analysis conducted in the 41st week, it was obtained that the estimated cost and time to complete the project implementation (EAC) was 14,289,833,105, - and the estimated time (TE) was 499 days, which was 121 days later than the original schedule.
Analysis of the Construction of Infiltration Wells in Pondok Jati Housing, Sidoarjo to Reduce Surface Flow for Flood Prevention Efforts Fathurokman, Hasan Alif; Wulandari, Esti; Nugroho, Laksono Djoko
TRANSPUBLIKA INTERNATIONAL RESEARCH IN EXACT SCIENCES Vol. 4 No. 1 (2025): JANUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/tires.v4i1.1561

Abstract

Water stored on the surface generally turns into runoff and much faster than groundwater considering the very low flow rate of the latter. Drainage of the Pondok Jati residential area is less able to receive or accommodate rainwater discharge because the development and growth of a city is one of the triggers for increasing the volume of discharge that passes through the residential area. Land use will affect the percentage of water that seeps into the soil with surface flow. Land with dense populations and many buildings, infiltration wells must be made more and larger in volume. Either with individual infiltration wells or with infiltration wells collectively for several houses, the need for infiltration wells from each block to reduce runoff that occurs with a 10-year return period plan. For the specifications of this infiltration well, concrete pipes are used. This infiltration well itself has concrete pipe walls with a diameter of 100 cm (1 meter) with the depth of the infiltration well is 300 cm (3.0 meters) and the number of points needed. The cost of making an infiltration well with a total of 210 infiltration wells in the Pondok Jati Sidoarjo housing complex is Rp. 696.358.600,- .
Analysis of Factors Affecting Clean Water Service in Dili City Gomes, Orlando; Wulandari, Esti; Nugroho, Laksono Djoko
TRANSPUBLIKA INTERNATIONAL RESEARCH IN EXACT SCIENCES Vol. 4 No. 2 (2025): APRIL
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/tires.v4i2.1603

Abstract

Availability of clean water is a basic need in Dili City, Timor Leste, but uneven distribution, inadequate infrastructure, and limited resources are the main challenges. This study aims to analyze the factors that influence clean water services. The research method included multiple linear regression analysis to identify influential factors. Data was obtained through surveys, interviews, official reports and literature review. The results showed that piping distance and number of family members positively influenced water quality and quantity, while household income tended to decrease water quality and quantity. Expenditure on clean water improves water quality and quantity. For water continuity, the number of people in the family had a strong positive effect, while other factors had a negative effect. The coefficient of determination for water quality is 5.3%, water quantity 20.9%, and water continuity 5.9%, indicating that many other factors influence water services in Dili City.
Drainage Analysis of Pondok Jati Housing and Drainage Replanning Fathurokman, Hasan Alif; Wulandari, Esti; Laksono Djoko
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1558

Abstract

The Pondok Jati housing complex is less able to receive or accommodate rainwater discharge due to changes in channel dimensions, shallowing of channels, and dirt due to waste from people who do not care about the local environment. To anticipate this, it is necessary to repair and build infrastructure that functions as a flood controller according to the characteristics and conditions of the location. Efforts made for this are to redesign drainage at low cost. Hydrology and Hydraulics methods are applied to obtain a 5-year planned discharge and existing channel discharge, to plan channels with a 5-year planned return period. The existing channel discharge for the Pondok Jati housing complex is obtained as much as 0.450 m3/sec, and modeling is carried out in accordance with SNI 02-2406-1991: Procedures for general planning of urban drainage. With the redesign, the planned channel dimensions are obtained measuring 0.50 m x 0.75 m, in the form of a square without a cover.
Analysis of Clean Water Services in Dili City Based on Service Ratio Gomes, Orlando; Wulandari, Esti; Nugroho, Laksono Djoko
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1602

Abstract

Adequate availability of clean water is an essential basic need for urban communities, including in Dili City, the capital of Timor Leste, as clean water supports health, hygiene, and various economic activities. However, Dili City faces a number of challenges in providing optimal clean water supply, such as rapid population growth, uncontrolled urbanization, inadequate infrastructure, and a distribution leakage rate of up to 30%, which causes difficulties in accessing clean water for some communities. This study aims to analyze the demand and availability of clean water in Dili City, and calculate the ratio of clean water services based on existing data, using a positivistic approach and theoretical-analytical and empirical-analytical methods. The results show that the demand for clean water in Dili City reaches 129,060 liters per second, with the highest production capacity in Comoro Village, but the distribution of clean water services is not evenly distributed. Becora Village has the highest service ratio, while Balibar Village shows a low ratio.