Optimisasi Manajemen Material Konstruksi dengan Pendekatan Just In Time Monika Tiku Padang; Latupeirissa, Josefine Ernestine; Sopacua, Helen Adry Irene
Paulus Civil Engineering Journal Vol. 7 No. 2 (2025): Paulus Civil Engineering Journal V7N2 2025
Publisher : Universitas Kristen Indonesia Paulus

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52722/50dzdd50

Abstract

The Just In Time (JIT) method is a method to save inventory and material storage costs in storage warehouses by supplying the required materials from suppliers on time. Therefore, the application of construction material management using the JIT method in a project is very important to help reduce material storage and procurement costs. By reducing the amount of materials stored at the project site, the company can save on storage costs and reduce the possibility of damage or loss of materials. This study of the JIT method was carried out on the construction of the regional office building of the Directorate General of Customs and Excise of South Sulawesi, to find out how the application of JIT can optimize construction material management. In The method used in this research is a comparison technique, namely by comparing material inventory management practices at the project site. comparing material inventory management practices at the project site with using JIT principles using primary data, namely observation and interviews while secondary data is logistical data. The results show that the JIT inventory management method is not applied in material inventory in the construction project of the regional office building of the Directorate General of Customs and Excise of South Sulawesi. In this study, material ordering that applies the JIT approach is known to optimize material management in the implementation of construction projects, so that there are no delays that can hinder work.
Penerapan Sistem Manajemen Iso 9001:2015 Pada Proyek Pembangunan Gedung Parkir Mall Panakkukang Hendrika Benyamin; Sopacua, Helen Adry Irene; Pascal Tiyouw, Herby Calvin
Paulus Civil Engineering Journal Vol. 7 No. 2 (2025): Paulus Civil Engineering Journal V7N2 2025
Publisher : Universitas Kristen Indonesia Paulus

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52722/a72m8109

Abstract

This study examines the implementation of ISO 9001:2015 in quality management for the construction project of the Panakkukang Mall parking building. The primary objective of this research is to evaluate the effectiveness of applying this quality management standard in enhancing project quality and customer satisfaction. The method used is a descriptive approach, with data collected through observation, interviews, and documentation. The findings indicate that the implementation of ISO 9001:2015 significantly contributes to improvements in managerial processes, quality control, and communication among all parties involved in the project. The involvement of all team members in applying this standard has also proven to enhance their understanding, awareness of responsibilities, and the quality of their work. However, challenges remain in implementation, such as staff training and the provision of adequate resources. This study aims to provide recommendations to developers and contractors to further optimize the application of quality management systems for achieving better outcomes in future construction projects.
Analisis Produktivtas Alat Berat Pada Proyek Pembangunan Jalan Akses dan Fasilitas Pendukung Stasiun Maros Tiyouw, Herby Calvin Pascal; Sopacua, Helen Adry Irene; Kondoallo, Alvone Feldian Sampe
Paulus Civil Engineering Journal Vol. 7 No. 4 (2025): Paulus Civil Engineering Journal, Vol.7, No.4
Publisher : Universitas Kristen Indonesia Paulus

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52722/p6c92381

Abstract

Road construction as  access and connection to an area is beneficial, among other things,  to facilitate the mobilization of goods and services, improve the economy and connectivity between regions. The Maros district government is constructing a new road to connect Maros Train Station with the main road, with a length of 2.5 km. The work carried out is land leveling. This work uses heavy equipment to achieve high productivity so that the work can be completed on time, on budget, and with high quality. Four units of construction equipment were used according to their functions, including dump trucks to transport material from the quarry to the project site, excavators to spread the material, bulldozers to level it, and vibration rollers to compact it. Research was conducted to determine the productivity of each tool according to its function and characteristics.  The results of the research on the productivity of each tool showed that the productivity of the dump truck was 14.78 m3/hour, the excavator was 337.62 m3/hour, the bulldozer was 91.12 m3/hour, and the vibration roller was 110.67 m3/hour.